Q_A.pdf

PDF 318 KB Posted

Attached to
Dillard Dry Dock Services Federal contract opportunity
Solicitation number
W912P7-18-T-0009
Issued by
Department of the Army Corps of Engineers Engineering District San Francisco

About this file

These are the questions received and responses provided.

View the file

Other files for this federal contract opportunity

Other files attached to Dillard Dry Dock Services, newest first.
File Type Posted
Drawings_and_Specs.pdf PDF
Dillard_Drydock_PWS_2018.pdf PDF
Line_Item_Breakdown_Pricing_Schedule.xlsx XLSX spreadsheet
Marin_Wage_Determination.pdf PDF
Contractor's_Experience_Form.docx DOCX document
FAR_Provisions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS ABOUT THE DILLARD DRY-DOCK SOLICITATION

Q: -Will there be a walk-through of the vessel before bids are due? We are hoping to see the boat to get a better understanding of the bow chock work and the swim grid bulwark changes.

A: Yes – Information posted as Amendment 3 Site Visit Info

Q: And you provided approximate square footage for the top-side paint work - do you have a square footage for the underwater / Intersleek coverage?

A: Top-side paint square footage is listed in the scope

Q: Are there lifting lugs on the vessel? Or would lifting the boat cradled by slings be acceptable as opposed to flooding our dry dock?

A: No, the lifting lugs are not rated. Unless the contractor gets permission to use them in coordination with the vessel manufacturer, Kvichak.

Q: And if there is even a list of sacrificial anodes that are to be replaced if the Cathodic Protection drawing can’t be produced, that would be a big help.

A: The drawing package is available. See attachments