PRE-BID/SITE VISIT INFORMATION AND PRE-AWARD SURVEY QUESTIONNAIRE
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6661954837
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PRE-BID MEETING AND SITE VISIT; RE: INVITATION FOR BIDS W912P6-16-B-0012, "Waukegan Harbor North Pier Breakw ater Resurfacing - Waukegan, IL"
A. The Bid Opening Date & Time remains unchanged at 1:00pm (CDT) September 20, 2016 (bids must be submitted "prior" to 1:00p.m.).
Further details on bid submission is located in Section 00100 of the Solicitation document.
B. Bidders are hereby advised of the Pre-Bid Meeting and Site Visit, w hich is scheduled for 11am (CDT) on September 8, 2016 at 201 North Sea Horse Drive in Waukegan, IL 60085.
C. BIDDERS SHALL COMPLETE THE PREAWARD SURVEY ENCLOSED HEREUNDER AND SUBMIT WITH THEIR BID PACKAGES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-16-B-0012
X 9B. DATED (SEE ITEM 11)
19-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2016
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-16-B-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION
PREAWARD SURVEY INFORMATION
(RE: Subparts 9.104-1 and 9.105-1 of the Federal Acquisition Regulation)
CONTRACTOR: _________________________________________________
SOLICITATION W912P6-16-B-0012, WAUKEGAN HARBOR NORTH PIER BREAKWATER
RESURFACING – WAUKEGAN, IL
Please complete the below form to assist in the completion of a Pre-award Survey:
1. Month and Year started in business:______________________
2. Year and State Incorporated:____________________________
3. Key Personnel:
President/Owner :__________________________________
Vice President/Partner:______________________________
Secretary/Treasurer:________________________________
4. Number of Full-Time Employees:________________________
5. Surety:
Agency:__________________________________________
Agent:____________________________________________
Address, City & State:_______________________________________
Telephone#:_______________________________________
6. Insurance Company:
Agency:__________________________________________
Agent:____________________________________________
Address, City & State:_______________________________________
Telephone#:_______________________________________
7. Financial Institution Information:
Name of Bank:_____________________________________
Contact Person:_____________________________________
Address, City & State:_______________________________________
Telephone#:________________________________________
8. References: Provide the names and contact information of three references. Information obtained from references will be used to determine if you have been diligent in the following areas: a) Quality of Work; b) Timely Performance; c) Effectiveness of Management; d) Compliance with Safety Standards; and e) Compliance with Labor Standards.
9. Does your company have any ongoing projects that may cause a problem with completing or beginning performance of the subject project?
| 10. | Does | your | company | own | the | equipment | to | be | used | in | this | project | or | does | it | have | the | necessary |
| resources | to | obtain | the | equipment? |
END OF FORM