BID OPENING DATE CHANGE WAGE RATES QUESTIONS PRE-BID ATTENDEES LIST AND UPDATED SPECS - WAUKEGAN HARBOR NORTH PIER
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6661954837
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REVISED BID OPENING DATE CHANGE; RE: INVITATION FOR BIDS W912P6-16-B-0012, "WAUKEGAN HARBOR NORTH PIER BREAKWATER
RESURFACING - WAUKEGAN, IL"
A. The Bid Opening Date & Time is extended from September 20, 2016 to September 23, 2016, the bid opening time remains unchanged at 1:00pm (CDT) (bids must be submitted "prior" to 1:00p.m.). Further details on bid submission is located in Section 00100 of the Solicitation document. Bid opening is contingent upon the follow ing contingency statement listed w ithin solicitation.
CONTINGENCY STATEMENT: The receipt of BIDS is contingent upon the USACE’s receipt of the 401 Water Quality Certification Permit. In this respect, the USACE is under no obligation to receive bids until such permit is received. Therefore, the due date for bids is subject to being extended until said Permit has been provided to the USACE, w hich is anticipated by September 21st, 2016. When acquired, bidders w ill be notified via an Amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-16-B-0012
X 9B. DATED (SEE ITEM 11)
19-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2016
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-16-B-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
B. USACE RESPONSE TO CONTRACTOR’S QUESTIONS:
QUESTION 1: Will equipment be allowed on the pier during construction? There is sand/sediment covering a significant stretch of the pier. Can you provide a max allowable weight for a skid steer or small excavation equipment?
RESPONSE 1: Equipment loading on the pier is limited to 100 pounds per square foot (psf) due to the uncertainty of the underlying condition of the pier. No equipment is allowed on the finished sections of the pier. (see updated sheet S‐101)
QUESTION 2: (S‐104 Typical West Face Plate Elevation & Typical East Face Plate Elevation) Is it correct that each monolith sections 1‐24 will have end plates on the East and West face plates? So the steel face plates for each monolith (east & center & west as one structure) will be a separate structure not conjoined with the adjacent monolith in one continuous protective barrier?
RESPONSE 2: That is correct. The face plates of one monolith are not connected to the adjacent monolith face plates. There is a nominal ½” gap between the two. See the TYPICAL MONOLITH PLAN on Sheet S‐101. There is a ¼” joint clearance between the existing monolith joint and end of the face plates therefore adjacent face plates will be ½”apart ( ¼ “ + ¼” = ½” ).
QUESTION 3: (S‐104)
Relating to Item #1, if each monolith is to have end plates and the monolith end plates are to be butted up to the adjacent monolith, is there a joint sealant or some waterstop to prevent ice build‐up between monoliths and to prevent the freeze thaw cycle from damaging the newly placed concrete monolith repairs?
RESPONSE 3: As indicated in the response to Item #2, the plates do not butt up together. No waterstop or sealant is required.
QUESTION 4: (S‐102, S‐103, S‐104)
Is it correct that all face plates, east & west & and center, on north & south & east walls, shall have "variation adjustment plate, typ." along bottom of all steel sheeting?
RESPONSE 4: Only on the North side plates as shown in the sections on Sheets S‐104 and Sections A and B on Sheet S‐109.
QUESTION 5: (S‐103, S‐109)
Is there detail drawing for "clip angle to angle, typ." as shown on Face Plate Elevations for Plate Frame Angle as shown on detail B ? Clip angle size & dimensions?
W912P6-16-B-0012
RESPONSE 5: Please see updated Sheet S‐103 SOUTH ELEVATION, TYPICAL CENTER FACE PLATE ELEVATION, TYPICAL WEST FACE PLATE ELEVATION, and SECTION B for clip angle size and dimensions.
D. This amendment provides acknowledgement to include Wage Rates for General Decision IL160018 01/22/2016 IL18 for Dredging and Marine work to be completed with this project. These wage rates are in addition to General Decision IL160011 07/15/2016 IL11 listed in original solicitation.
E. Contractor’s will be restricted from performing any work from November 1, 2016 through March 15, 2017.
Contractor’s can expect to see this requirement included in the 401 Water Quality Permit and thus, must adhere to it..
F. This amendment provides the attendance sheet from the pre‐bid meeting held on Thursday, September 8, 2016.
Point of Contact: Kim Hubbard at 312.846.5368.
General Decision Number: IL160018 01/22/2016 IL18
Superseded General Decision Number: IL20150018
State: Illinois
Construction Types: Heavy (Dredging and Marine)
Counties: Illinois Statewide.
MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND
MARINE CONSTRUCTION):
ILLINOIS, INDIANA, MICHIGAN, MINNESOTA, NEW YORK, OHIO,
PENNSYLVANIA AND WISCONSIN DREDGING AND MARINE CONSTRUCTION
Dredging and Marine Construction Projects: floating/land equipment engaged in clamshell, backhoe and dragline dredging, marine construction, bridges,salvage operations and cranes, loaders, dozers, or other equipment used for disposal of dredge spoils or marine construction materials on land at the slip or dock, at the project site, where the above material/spoils is being handled, and all equipment utilized on breakwall/breakwater structures on the Great Lakes, Islands therein, their connecting and tributary waters, including the Illinois Waterway to the Lock at Lockport, Illinois, the New York State Barge Canal System between Tonawanda, New York and Waterford, New York and Oswego, New York, the Duluth-Superior area to the Fond du Lac Bridge Crossing (Minnesota State Highway 23) on the St. Louis River and on the St. Lawrence River eastward to the International Boundary near St. Regis, New York.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/22/2016
* SUIL2003-001 01/01/2015
MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND
MARINE CONSTRUCTION):
Rates Fringes
Dredging:
Fireman, Oiler, Deckhand, & Scowman (with dipper, hydraulic or other floating equipment engaged in hydraulic and dipper dredging operations) Pipeline men (both afloat & ashore including loading, unloading, maintaining, and handling pipelines for hydraulic dredges and sandboats Rangeman, Tankerman, Sweepman and service Truck Driver......................$ 22.51 7.61+a+b Lead Deckhand...............$ 29.68 7.61+a+b
Hydraulic Dredging LAUNCH OPERATOR - Vessel 800 Horse- Power Or Less....$ 25.15 7.61+a+b TUG ENGINEER................$ 26.49 7.61+a+b TUG OPERATOR - Vessel Over 800 Horse-Power.............$ 26.49 7.61+a+b TUG WORKERS: Fireman, Lineman, Oiler, Deckhand, Tankerman. Scowman, (on/or with tugboats, launches, or other self-propelled boats)......................$ 22.51 7.61+a+b
MECHANIC (Undefined)
FLOATING EQUIPMENT:
Illinois Class I....................$ 53.60 32.05+b&c Class II-A.................$ 52.10 32.05+b&c Class II-B.................$ 55.10 32.05+b&c Class III..................$ 46.40 32.05+b&c Class IV...................$ 38.55 32.05+b&c FLOATING EQUIPMENT: Indiana Class I....................$ 47.35 27.60+b&c Class II-A.................$ 45.85 27.60+b&c Class II-B.................$ 45.85 27.60+b&c Class III..................$ 40.80 27.60+b&c Class IV...................$ 33.90 27.60+b&c
FLOATING EQUIPMENT:
Michigan Class I....................$ 40.80 25.80+b&c Class II-A.................$ 39.30 25.80+b&c Class II-B.................$ 41.80 25.80+b&c Class III..................$ 35.00 25.80+b&c Class IV...................$ 29.10 25.80+b&c
FLOATING EQUIPMENT:
Minnesota Class I....................$ 40.80 17.20+b&c Class II-A.................$ 39.30 17.20+b&c
Class II-B.................$ 41.80 17.20+a&b Class III..................$ 35.00 17.20+b&c Class IV...................$ 29.10 17.20+b&c
FLOATING EQUIPMENT:
New York:(Cattaraugus, Chautauga, Erie and Orleans Counties) Class I....................$ 41.60 28.69+b&c Class II-A.................$ 40.10 28.69+b&c Class II-B.................$ 43.10 28.69+b&c Class III..................$ 35.70 28.69+b&c Class IV...................$ 29.65 28.69+b&c
FLOATING EQUIPMENT:
New York:(Cayuga, Jefferson, Oswego, and St.
Lawrence Counties) Class I....................$ 41.15 23.70+b&c Class II-A.................$ 39.65 23.70+b&c Class II-B.................$ 42.65 23.70+b&c Class III..................$ 35.25 23.70+b+c Class IV...................$ 29.35 23.70+b&c
FLOATING EQUIPMENT:
New York:(Monroe and Wayne Counties and the City of Rochester) Class I....................$ 43.15 23.55+b&c Class II-A.................$ 41.65 23.55+b&c Class II-B.................$ 44.65 23.55+b&c Class III..................$ 37.05 23.55+b&c Class IV...................$ 30.85 23.55+b&c
FLOATING EQUIPMENT:
New York:(Niagara) Class I....................$ 39.70 25.90+b&c Class II-A.................$ 38.20 25.90+b&c Class II-B.................$ 40.20 25.90+b&c Class III..................$ 34.00 25.90+b&c Class IV...................$ 28.30 25.90+b&c
FLOATING EQUIPMENT:
Ohio:(Ashtabula, Cuyahoga, Erie,Lake, and Lorain Counties) Class I....................$ 39.70 13.51+b&c Class II-A.................$ 38.20 13.51+b&c Class II-B.................$ 38.20 13.51+b&c Class III..................$ 34.00 13.51+b&c Class IV...................$ 28.30 13.51+b&c
FLOATING EQUIPMENT:
Ohio:(Lucas, Henry, Ottawa, Wood and Sandusky Counties) Class I....................$ 39.70 13.51+b&c
Class II-A.................$ 38.20 13.51+b&c Class II-B.................$ 38.20 13.51+b&c Class III..................$ 34.00 13.51+b+c Class IV...................$ 28.30 13.51+b&c
FLOATING EQUIPMENT:
Pennsylvania:(Erie County):
Class I....................$ 40.80 18.53+b&c Class II-A.................$ 39.30 18.53+b&c Class II-B.................$ 39.30 18.53+a&b Class III..................$ 35.00 18.53+b&c Class IV...................$ 29.10 18.53+b&c
FLOATING EQUIPMENT:
Wisconsin:Includes all marine/floating type work on projects in the Superior/Duluth Harbor, Lake Superior.
Class I....................$ 45.55 21.63+b&c Class II-A.................$ 44.05 21.63+a&b Class II-B.................$ 44.55 21.63+b&c Class III..................$ 39.20 21.63+b&c Class IV...................$ 32.60 21.63+b&c
PAID HOLIDAYS (WHERE APPLICABLE):
A- NEW YEAR'S DAY
B- MEMORIAL DAY
C- INDEPENDENCE DAY
D- LABOR DAY
E- THANKSGIVING DAY
F- CHRISTMAS DAY
G- PRESIDENT'S DAY
H- VETERAN'S DAY.
FOOTNOTES:
a. $30.10 per day per employee for medical
b. Eight paid holidays: A thru H
c. Hazardous/Toxic Waste Material:
*Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour
Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency.
CLASSIFICATION DESCRIPTIONS
Class I - Master Mechanic - assist and direct Class II, Class III, and Class IV, diver/wet tender, engineer (hydraulic dredge) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender
Class II-B Friction, Lattice Boom, or any Crane Certifications Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc.
Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.