W912P523R0001-0002.pdf
PDF 586 KB Posted
- Attached to
- Wolf Creek Liquid Oxygen Cryogenic Facility
- Solicitation number
- W912P523R0001
About this file
This solicitation requests proposals for a firm-fixed-price construction contract to fabricate and install a liquid oxygen cryogenic facility at Wolf Creek Dam in Jamestown, Kentucky. The scope of work includes demolition, site preparation, facility foundation construction, security fence installation, access road paving, oxygen filling area concrete work, prefabricated structure installation, cryogenic storage tank acquisition and installation, piping work, vaporizer acquisition and installation, distribution header installation, control system design and installation, and other mechanical, electrical and facility work. The estimated value of the contract is between $10 million and $25 million. Proposals are due no later than January 4, 2023 at 1:00 PM Central Time and must be submitted electronically through the PIEE system. A pre-proposal site visit will take place on December 7, 2022 at 9:00 AM Central. Interested parties must register for the site visit by submitting the required forms to the listed points of contact by the specified deadlines. The solicitation is available through the PIEE system on SAM.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD22692481
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0002 to Solicitation W912P523R0001 is to incorporate the follow ing changes:
a.) Revise the time of the Pre-Proposal Site Visit from 10:00AM to 09:00AM CST on Tuesday, 13 December 2022.
b.) Revise the Projnet Bidder Inquiry Key from ZPWGHE-NITR2N to NSUY34-C3TN95 in Section 00 21 00 - Instructions to Offerors.
c.) Extend the date proposals are due to 24 January 2023 at 2:00 pm Central Time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Dec-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P523R0001
X 9B. DATED (SEE ITEM 11)
25-Nov-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Dec-2022
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P523R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time 24-Jan-2023 02:00 PM has been added.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
1.0 GENERAL REQUIREMENTS
1.1 Intent
This solicitation is to award a construction contract for the Wolf Creek Liquid Oxygen Cryogenic Facility in Jamestown, Kentucky.
1.2 Project Description
The scope of this requirement is to fabricate and install a liquid oxygen cryogenic facility at Wolf Creek Dam, Jamestown, Kentucky.
1.3 Disclosure of Magnitude of Construction Project
The estimated magnitude of this requirement is between $5,000,000 and $20,000,000.
1.4 Basis of Award
The award will be made to the responsible Offeror whose proposal conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government with appropriate consideration given to the four (4) evaluation factors: Past Performance; Technical Approach; Small Business Participation Plan; and Price. Factors are listed in descending order of importance. NOTE: When combined, the non-cost/price factors (Past Performance;
Technical Approach; and Small Business Participation Plan) are APPROXIMATELY EQUAL to Price. Factors are illustrated:
Factor I – Past Performance 1st Factor II – Technical Approach 2nd Factor III – Small Business Participation Plan 3rd Factor IV - Price Approximately EQUAL to Non-Cost/Price Factors
Offerors are reminded to include their best technical and price terms in their initial offer and not to assume they will have an opportunity to participate in discussions or be asked to submit a revised offer.
Proposals are intended to be evaluated and an award made without discussions with Offerors unless discussions are determined to be necessary. Additionally, any other than small business Offeror must have an acceptable Small Business Subcontracting Plan to receive an award in accordance with FAR 19.702(a).
Offerors are cautioned that the award may not necessarily be made to the lowest price offered.
1.5 Type of Contract
The Government intends to award one (1) firm fixed-price construction contract.
1.6 Who May Submit
This procurement is unrestricted to obtain full and open competition. Proposals from firms organized as joint ventures (JV) that have associated specifically for this project must include a copy of the legal joint venture agreement in the proposal submission.
1.7 North American Industry Classification System (NAICS) and Small Business Size Standard
The NAICS code for this project is 236210, entitled “Industrial Building Construction”, which has a Small Business Administration (SBA) size standard of $39.5 Million.
1.8 Availability of Plans (Drawings), Technical Specifications and Additional Documents
All drawings, technical specifications, and additional documents relating to this Request for Proposal (RFP) are available for download at this solicitation posting on the SAM website, www.SAM.gov. No printed copies of the aforementioned documents will be provided by the Government. Although provided as separate attachments, the following documents are considered an official part of the solicitation.
The Specifications and Drawings are part of the contract and shall be considered in that respect (see Defense Federal Acquisition Regulation Supplement (DFARS) 252.236-7001, Contract Drawings and Specifications).
1.9 Pre-Proposal Site Visit
An organized site visit is scheduled during the solicitation period. Offerors should inspect the job site prior to submitting a proposal. Offerors should take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve Offerors from the responsibility for properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents or employees, unless included in the solicitation, the specifications or related documents.
Please refer to FAR 52.236-27 Alt 1, Site Visit (Construction), incorporated by full text in this solicitation, for information pertaining to the scheduled site visit.
This will be the only site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.
1.10 Requirements to Attend the Site Visit
REGISTRATION: Only registered persons will be permitted to attend the site visit. In addition to the information below, please also provide your firm’s name, firm’s CAGE and/or Unique Entity Identifier (known as DUNS) number, and name and position title of primary point-of-contact and their telephone number and email address.
Only two (2) individuals from each business entity will be permitted to attend.
U.S. CITIZENS: To register, U.S. citizens interested in attending the site visit shall submit a Nashville District Corps of Engineers (LRN) U.S. Citizen Security Access Form to the LRN Point of Contacts (POCs), Contract Specialist Connor Struckmeyer and Contracting Officer JW Purcell, no later than five (5) business days prior to the site visit. If submitting the document in less than five business (5) days prior, the person may not receive approval for participation. Notification of approval or denial will be provided prior to the date of the site visit. The form and guidance is available as a pdf attachment on http://sam.gov with this solicitation and is titled U.S. Citizen Security Access Form.
FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Security Access Form and legible color copies of two (2) of the following documents: Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with I-551 stamp or attached INS Form I- 94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I- 688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS Form I- 571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN POCs. These documents must be submitted two (2) weeks prior to the site visit. FN requests require approval at the Headquarters U.S. Army Corps of Engineers (HQ USACE) level. Exceptions will be considered on a case-by-case basis but will be limited. The form is available as a pdf attachment on www.sam.gov with this solicitation and is titled Foreign National Security Access Form.
LRN POCs for Registration: For questions and/or concerns regarding the Site Visit, please contact Connor Struckmeyer at connor.a.struckmeyer@usace.army.mil. Please submit all site visit request forms to Connor Struckmeyer at connor.a.struckmeyer@usace.army.mil and JW Purcell at james.w.purcell@usace.army.mil. When you send your site visit request form, please put “W912P523R0001 - (Foreign National or U.S. Citizen) Request Form-(Your Company Name)” in the subject line of the email. Please edit the information in parenthesis to match the request form you submit and your company name.
1.11 POC for Communication: Any communications regarding this procurement must be made in writing to the Nashville Contracting Branch, Attn: Connor Struckmeyer at connor.a.struckmeyer@usace.army.mil. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, telephone, and facsimile numbers to include area code.
Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities are highly discouraged and will not be scheduled.
1.12 Prospective Offerors’ Questions and Requests for Information
Prospective Offerors should submit questions concerning this Solicitation through the Bidder Inquiry function in ProjNet at http://www.ProjNet.org/ProjNet. This is USACE’s standard platform for receiving and responding to questions and requests for information. As noted below, Offerors shall not submit their proposals via ProjNet.
Offerors shall submit their proposals in accordance with the provisions stated in the Solicitation.
To submit and review inquiry items, Offerors will need to be a current registered user or self-register into system.
Instructions to gain access are listed below.
Project: (Wolf Creek Dam) Liquid Oxygen Cryogenic Facility Construction Solicitation Number: W912P523R0001 The Bidder Inquiry Key: NSUY34-C3TN95
Instructions for ProjNet Bidder Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for Future ProjNet Bidder Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all inquiries or add an inquiry. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by LRN’s technical team.
Offerors are requested to review the specification in its entirety and to review the “Bidder Inquiry System” for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to questions from prospective Offerors concerning the Solicitation that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the Solicitation governs. Any changes or revisions to the Solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the Solicitation; or (c) Notice that a response is not necessary.
3. The ability for prospective Offerors to enter questions in reference to the Solicitation will be disabled ten (10) calendar days prior to the closing date stated in the Solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the Solicitation.
1.13 Amendments Prior to Date Submission for Request for Proposals (RFP). The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for submission of proposals. Such revisions and amendments, if any will be announced by an amendment or amendments to this RFP. If the revisions and amendments are of a nature which requires material changes in quantities or prices proposed or both, the date set for receipt of proposals may be postponed by such number of days as in the opinion of the issuing Contracting Officer will enable Offerors to revise their proposal. In such cases, the amendment will include an announcement of the new date for receipt of proposal.
1.14 Notice to Offeror: Use of Class I Ozone-Depleting Substances
a. In accordance with Section 326 of P.L. 102-484, the Government is prohibited from awarding any contract which includes a specification or standard that requires the use of a Class I ozone depleting substance (ODS) identified in Section 601(a) of the Clean Air Act, (42 U.S.C 767a(a)), or that can be met only through the use of such a substance unless such use has been approved, on an individual basis, by a senior acquisitions official who determines that there is no suitable substitute available.
b. To comply with this statute, the Government has conducted a best effort screening of the specifications and standards associated with this acquisition to determine whether they contain any ODS requirements. This requirement has no relationship to ODSs.
c. If the Offeror possesses any special knowledge about any other ODSs required directly or indirectly at any level of contract performance, the U.S. Army would appreciate if such information were surfaced to the Contracting Officer for appropriate action. To preclude delay to the procurement, the Offeror should provide any information as soon as possible after release of this RFP and prior to the submission of proposals to the extent practicable. It should be understood that there is no obligation on the Offeror to comply with the request and that no compensation can be provided for doing so.
2.0 BONDS AND INSURANCE
2.1 BID GUARANTEE. All Offerors shall furnish a bid guarantee. In accordance with FAR 52.228-1, Bid Guarantee, the bidder (or Offeror for this solicitation) shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond (use Standard Form 24) supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3,000,000.00. If using a Bid Bond, it must be submitted on SF 24. The SF 24 can be found at the GSA Forms Library at https://www.gsa.gov/forms.
2.2 INSURANCE. Contractor shall carry Liability and Insurance. See FAR 52.228-5, Insurance – Liability to Third Persons.
2.3 The successful Offeror will, within the time established in the proposal, furnish performance and payment bonds in the amounts indicated in the RFP or the specifications.
a. PERFORMANCE BONDS (Standard Form (SF) 25). Pursuant to FAR 52.228-15, Performance and Payment Bonds—Construction (DEVIATION 2020-O0016), the penal amount of the performance bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received on a SF 25A within ten (10) calendar days after receipt of contract award. The SF 25A can be found at the GSA Forms Library at https://www.gsa.gov/forms.
b. PAYMENT BONDS (SF 25A). Pursuant to FAR 52.228-15, Performance and Payment Bonds— Construction (DEVIATION 2020-O0016), the penal amount of the payment bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received on a SF 25A within ten (10) calendar days after receipt of contract award. The SF 25A can be found at the GSA Forms Library at https://www.gsa.gov/forms.
3.0 SYSTEM FOR AWARD MANAGEMENT (SAM)
In accordance with FAR 52.204-7, System for Award Management, registration is required in the System for Award Management (SAM) database located at www.sam.gov. More specifically, "An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation." (See FAR 52.204-7(b)(1)).
For SAM Customer Service, contact:
Federal Service Desk URL: www.fsd.gov Hours: 8am – 8pm (Eastern Time) U.S. Calls: 866-606-8220 International Calls: 334-206-7828
DSN: 866-606-8220
IMPORTANT NOTICE: Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 calendar days of activation, or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (transitioned from DUNS Number).
The registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
4.0 SMALL BUSINESS PARTICIPATION PLAN (SBPP)
All Offerors (both large and small businesses) are required to complete a Small Business Participation Plan (SBPP) in accordance with DFARS 215.304. Reference section 00 21 00 of this Solicitation for additional submission requirements.
5.0 SUBCONTRACTING PLAN
The successful Offeror (if a large business) shall provide a Small Business Subcontracting Plan that contains all of the elements required by FAR 52.219-9 and DFARS 252.219-7003. The Subcontracting Plan is not a requirement for evaluation in source selection but shall be provided upon request before contract award (if the successful Offeror is a large business). The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).
6.0 WHERE TO SUBMIT & SUBMITTAL DEADLINE
Offerors shall submit their proposals no later than the time and date specified in Block 13 of SF 1442 of this solicitation as follows:
The Offeror’s proposal shall be submitted electronically, via Procurement Integrated Enterprise Environment (PIEE), as described below. The RFP will provide proposal submission instructions and receipt date for proposal submittal. The Offeror’s proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.
The Offeror’s proposal must be received by the Government by the date/time specified in the Solicitation.
6.1 PROPOSAL SUBMISSION: ALL SUBMISSIONS TO THIS RFP SHALL BE SUBMITTED
ELECTRONICALLY THROUGH PIEE. No paper copies, CD-ROMs or facsimile submissions will be accepted.
Electronic Proposal Submissions is required through the Army’s Electronic File Sharing Service in PIEE (https://piee.eb.mil/). The PIEE Application is used to send large files to individuals that would normally be too large to send via email. Information regarding how to set up a vendor registration is included in this link:
https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. On this page, click on the “Vendor User Registration” Doc and it will take you through the process of registering as a vendor.
If you plan on submitting a proposal, be sure to select “SOL-Solicitation” in the drop-down list and choose the “Proposal Manager” role to be given the proper permissions.
Further training is available at the following links:
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml - This link shows information regarding the Solicitation application in PIEE and the different roles available.
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml - This link is for Offerors regarding the Proposal Manager function and instruction on submitting a Proposal.
a. File Size Limitations: Offerors are advised to follow the PIEE instructions for uploading files. PIEE supports delivery of up to 1.9GB per file, with no limit on the number of files, as well as multiple file formats. If needed, Offerors are advised to break the files down into smaller sections in order to upload them into the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
b. File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
- W912P523R0001 – (FIRM NAME) – VOLUME I
- W912P523R0001 – (FIRM NAME) – VOLUME II
Each file name shall begin with the Solicitation number followed by the firm’s name, and a brief file description.
Please see the examples above.
c. File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be the size listed in the submission requirements for each factor. Pages shall be letter sized (larger page sizes (such as 11x17 fold- outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors.
Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor.
d. Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the Solicitation document. The time and date of proposal receipt will be the upload completion/delivery time and date recorded within the PIEE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
e. Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of FAR Provision 52.215-1 Instructions to Offerors – Competitive Acquisition, subparagraph (e), which is incorporated by reference in the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
PROCEDURES FOR SUBMITTAL OF OFFERS
AND
PROPOSAL EVALUATION APPROACH
1.0 Submittal of Offers
1.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein.
However, in order to be effectively and equitably be evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's past performance, scheduling approach, safety management, economy and efficiency, and small business participation plan necessary for successful completion of the project. The requirements stated in this RFP are minimums.
1.2 Offerors shall submit their proposals to the Government no later than the time and date specified in Block 13 of Standard Form 1442 of this solicitation. Detailed submission instructions are listed above in section Instructions to Offerors, paragraph 6.0 Where to Submit and Submittal Deadline and subparagraph 6.1 Proposal Submission.
1.3 Offerors are required to submit a proposal made up of Past Performance, Scheduling Approach, Safety Management, Economy and Efficiency, Small Business Participation Plan, Price, and Pro Forma. All proposal materials shall be submitted via Procurement Integrated Enterprise Environment (PIEE) with a bookmarked table of contents and/or a standard electronic Tab Index. The sections should parallel the submission requirements identified below. Volume I shall be submitted in Portable Document Format (PDF) and shall be either tabbed or bookmarked to reflect the division of Factors in accordance with paragraph 3. Volume II shall be submitted as a separate PDF file and shall also be tabbed or bookmarked.
2.0 Proposal Evaluation Process
2.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of USACE will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical proposals will be reviewed and rated without knowledge of the price offered. The number and identities of Offerors are not revealed to anyone who is not involved in the evaluation and award process or to other Offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is the Best Value Tradeoff (BVTO) Process.
2.2 The evaluation process essentially consists of three (3) parts: (1) proposal compliance review and responsibility determination; (2) past performance, technical, and price evaluations; and (3) best value decision.
2.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications (if applicable) are complete and that a past performance, technical, and price proposal were received.
2.2.2 Past Performance and Technical Evaluations: The SSEB will evaluate and rate the proposals against the RFP requirements. Some factors will be rated using an adjectival-based system. Others will be rated on an “acceptable/unacceptable” basis. Past Performance will be rated based on recency/relevancy and confidence.
2.2.3 Price Evaluation: Cost Engineering, Contracting Officer, and the Source Selection Authority (SSA) will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.
2.2.4 Best Value Decision: After all, above evaluations are complete the SSA performs this assessment by comparing the strengths, weaknesses, and the cost/price of the competing proposals to determine which proposal represents the best value to the Government.
3.0 Proposal Information and Related Evaluation Factors
3.1 Proposals will be evaluated in accordance with the factors listed below in relative order of importance.
Note: To be eligible for award, Factor I – Past Performance, must be rated at least “Neutral Confidence,” and Factors II-VI, must be rated at least “Acceptable.”
All non-cost/price factors, when combined, are approximately equal to cost or price. Offerors are reminded to include their best past performance, technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interest of the Government.
3.2 Volume I – Technical Proposal
3.2.1 Volume I – Factor I – Past Performance 1st
3.2.2 Volume I – Factor II – Technical Approach 2nd
3.2.5 Volume I – Factor III – Small Business Participation Plan 3rd
3.3 Volume II – Price and Pro Forma Information
Tab A – Proposal Data Sheet Not Rated
Tab B – Standard Form (SF) 1442, and Acknowledged Amendments (if any) Not Rated
Tab C – Joint Venture (JV) Agreement (if applicable) Not Rated
Tab D – Section 00100 Price Proposal Not Rated
Tab E – Section 00 45 00 – Representation and Certifications (unless available on www.SAM.gov) Not Rated
Tab F – Proof of Financial Capability Not Rated
Note: Offeror is responsible for ensuring the documents submitted are consistent throughout the proposal.
3.4 Ratings
Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.
Past Performance Relevancy Ratings Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Past Performance Confidence Assessments Rating Description Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available, or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will successfully perform the required effort.
Scheduling Approach, Safety Management and Economy and Efficiency Combined Technical/Risk Ratings Adjectival Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
The following Definition of Risk chart defines the level of risk listed in the above chart: Combined Technical/Risk Ratings:
Definition of Risk Applied to Combined Technical/Risk Ratings Risk Level Description Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost, or degradation of performance.
Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increase the risk of unsuccessful performance to an unacceptable level.
Small Business Participation Plan Ratings Rating Description Acceptable Proposal indicates an adequate approach and understanding of small business objectives.
Unacceptable Proposal does not meet small business objectives.
3.5 Definitions
a. Adverse Past Performance is past performance information that supports a less than satisfactory rating on any evaluation. Adverse past performance that must be addressed with Offerors includes unfavorable comments received from sources such as those received from respondents from past performance questionnaires or interviews that have not been finalized within a formal rating system. A best practice can be to discuss adverse past performance which caused a rating to be lowered to Satisfactory Confidence.
b. Best Value means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirement. See FAR 2.101.
c. Clarifications are limited exchanges between the Government and Offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
d. Communications are exchanges, between the Government and Offerors, after receipt of proposals, leading to establishment of the competitive range. See FAR 15.306(b).
e. Competitive Range – See FAR 15.306(c)
f. Deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
g. Discussions are exchanges (i.e., negotiations) in a competitive environment that are undertaken with the intent of allowing the Offeror to revise its proposal. Discussions take place after establishment of the competitive range. See FAR 15.306(d).
h. Evaluation Notice (EN) is the Procuring Contracting Officer’s (PCO) written notification to the Offeror for purposes of clarifications, communications, or discussions.
i. Performance Confidence Assessment is an evaluation of the likelihood (or Government’s confidence) that the
Offeror will successfully perform the solicitation’s requirements; the evaluation is based upon past performance information.
j. Recency, as it pertains to Past Performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.
k. Relevancy, as it pertains to Past Performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.
l. Risk, as it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor may involve risk of disruption of schedule, degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.
m. Significant Weakness in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
n. Source Selection Authority (SSA) is the official designated to make the source selection decision.
o. Source Selection Decision Document (SSDD) is the document that reflects the SSA’s independent, integrated, comparative assessment and decision.
p. Source Selection Evaluation Board (SSEB) is a group of individuals representing the various functional disciplines relevant to the acquisition that is responsible for evaluating proposals against the solicitation criteria.
q. Strength is an aspect of an Offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
r. Uncertainty any aspect of a non-cost/price factor proposal for which the intent of the Offeror is unclear (e.g.
more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).
s. Weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR
15.001.
4.0 Volume I - Factor I (Past Performance) - Performance Assessments
Due to the type of work associated with this project, the Government anticipates the use of key-subcontractors. As a result, if the Prime Contractor (Offeror identified in Block 14 of the SF1442) intends to subcontract Fabrication, Erection, or Installation of the projects listed below as similar in scope, the Offeror must submit evidence of a firm commitment (i.e., signed agreement or letter of commitment) from the subcontractor to perform if the Offeror is awarded the contract. The submission requirements and evaluation criteria utilized for the prime contractor will also be utilized by the SSEB for evaluation of these key-subcontractors.
Any key-subcontractors identified in the proposal must be used on the project. No substitutions will be accepted, unless otherwise agreed to by the Contracting Officer.
4.1 Submission Requirements:
Each Offeror shall provide descriptions of no more than three (3) past or current construction projects completed, or substantially complete (75% or more), within the last twenty (20) years (from the solicitation issuance date), that are similar to this project in scope and magnitude. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.
Detailed project information shall be provided using the Project Detail Sheet format described at the end of this section. Ensure the proposal clearly describes which work the Offeror and the subcontractors performed.
In order to demonstrate relevant past performance, Offerors must submit detailed information for projects that are similar in scope and magnitude as further defined below.
NOTE: Do not submit more than three (3) projects. Any projects submitted that exceed the three (3) project limit will not be evaluated.
Similar in scope: In order to be considered similar in scope, the submitted projects must include at least three (3) of the A, B, C, or D criteria below. The Offeror’s combined portfolio must include an example of each criterion listed below. Projects that combine multiple scope similarity elements below may be viewed more favorably by the SSEB:
a. Experience with liquid oxygen tank design and installation;
b. Experience with facility design and construction of mechanical and electrical components in compliance with liquid oxygen industry standards including but not limited to NFPA, ASME, ASTM, CGA;
c. Experience with site grading and road construction;
d. Experience with foundation preparation and construction to support heavy industrial equipment loads in excess of 100,000 pounds.
Similar in magnitude: Each project submitted shall be valued greater than $2 million to be considered similar in magnitude, yet at least one (1) project shall be valued greater than $3.5 million.
The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor I, Past Performance.
Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).
Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror’s client requests, questionnaires may be submitted directly to the Government’s point of contact, Connor Struckmeyer at connor.a.struckmeyer@usace.army.mil prior to the proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. If the PPQ is for an ongoing (incomplete) project, the PPQ must be completed after the solicitation issue date. Submission of a PPQ does not preclude the Government from using previously submitted PPQ information in the past performance evaluation. Offerors shall submit CPARS in lieu of a PPQ if applicable.
In addition to the above, the Government is required to use CPARS as a source for past performance, when available. If not available and when necessary, the Government reserves the right to check any or all cited references to verify supplied information and to assess owner and engineer satisfaction in regards to qualifications and past performance. Other sources may include, but are not limited to, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. The Government may not choose to contact all of the identified references/points of contact. This assessment is based on the Offeror’s record of relevant and recent past performance information that pertains to the requirements outlined in the Solicitation.
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. If more than one (1) contractor is listed in Block 14, then a signed Joint Venture Agreement must be submitted with the proposal and the Joint Venture (JV) shall be registered as such in the System for Award Management (SAM). However, each party of the JV must submit their own Unique Entity Identifier (UEI SAM – issued by SAM.gov) with the JV proposal. The past performance of each JV partner will be evaluated based on each partner’s role in cited past work and in the proposed JV role for this project.
NOTE: The Offeror’s Past Performance Proposal, shall be 8-1/2” by 11”. Charts, tables, drawings, and illustrations should be limited to the electronic PDF equivalent of 11” by 17”. Pages should have a one-inch margin on all sides.
Text should be 12- point, Times New Roman. (Captions for drawings and tables may be 10-point).
4.2 Evaluation Criteria:
The SSEB will evaluate the recency, relevancy and quality of the Offeror’s experience as described in the proposal and assign a single confidence rating based on the degree of successful performance of all recent and relevant projects identified. Well-documented performance and completion or significant completion (75% or more complete) of project within the past twenty (20) years (from issuance of the solicitation), that are similar in scope and magnitude for this project will be rated more relevant.
The SSEB will assign a confidence rating to each Offeror based on the degree of successful performance of all recent and relevant projects identified in the proposal in response to paragraph 4.1, Past Performance Submission Requirements discussed above.
The SSEB will evaluate recent and relevant past performance to assess the degree of performance risk involved in accepting each Offeror’s proposal. If the firm is divided into severable segments (e.g., division, group, or unit) the Government will evaluate only the past performance of those segments of the firm(s) that will actually perform the work.
Additionally, submitted past performance projects that are “similar in scope” and “similar in magnitude” and demonstrate experience with one (1) or all of the following, may receive additional consideration:
a. Projects demonstrating experience with the U.S. Army Corps of Engineers (USACE);
b. Projects demonstrating experience with the Tennessee Valley Authority (TVA);
c. Projects demonstrating experience with all four (4) of the above-referenced key scope areas in a single project.
5.0 Volume I - Factor II (Technical Approach)
5.1 Submission Requirements:
The Offeror shall submit a schedule and a narrative, not to exceed twenty (20) pages, the schedule not counting towards the 20-page limit, describing the overall approach to the schedule and technical aspects of the contract work. (Sketches, drawings, and/or figures will not count towards the page limit). At a minimum, the narrative shall include the following:
• Describe how the cryogenic facility foundation will be constructed to achieve the required uniform settlement including monitoring of the foundation settlement;
• Describe your approach to the required site work including excavation, grading, demolition, and road construction;
• Describe your approach to installing liquid oxygen tanks, vaporizers, mechanical piping, and electrical components to ensure compliance with specifications;
• Describe your approach to designing the performance-based portions of the Plans and Specifications:
• Describe how your management team will be…