About this file

This document is an amendment to a solicitation for structural metal fabrications. The amendment extends the quote date from August 13, 2020 to August 17, 2020. It also provides answers to two questions from industry regarding furnished items and warranty applicability. The related federal contract opportunity is for fabrication of Wilson Main Lock culvert valve strut arms for the Department of the Army Corps of Engineers Engineering District Nashville. The solicitation, technical specifications, and technical plans provide instructions for the required fabrication work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD00920178

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: Wilson Strut Arm Fabrication The purpose of this amendment is to:

1) Extend the Quote Date from 13-August-2020 1:00 PM to 17-August-2020 1:00 PM;

2) Post Questions and Answ ers;

3) Update FAR Clause 52.252-3.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P520Q0029

X 9B. DATED (SEE ITEM 11)

27-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Aug-2020

CODE

CELRN-RC-N CONTRACTING BRANCH

110 9TH AVE SOUTH, A405

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P520Q0029

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q & A (AMENDMENT 0002)

1.Industry Question/Comment: In reference with T-Spec Section 05 50 14, Paragraph 1.1.2 Government Furnished Items- All furnished components are finished complete without paint, correct?

Answer: For bidding purpose, the government furnished items are finished complete without paint and shall need to be painted in accordance with the contract specifications, Section 09 97 02 - PAINTING:

HYDRAULIC STRUCTURES.

2. Industry Question/Comment: In reference with T-Spec Section 05 50 14, Paragraph 3.9 Warranty- The warranty on items furnished by Government applies to others, not the supplier or awardee of new items, correct?

Answer: Correct.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Aug-2020 01:00 PM to 17-Aug-2020 01:00 PM.

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001

Project: Wilson Strut Arm Fabrication The purpose of this amendment is to:

1) Extend the Quote Date from 10-August-2020 1:00 PM to 13-August-2020 1:00 PM;

2) Post Questions and Answers;

3) Add FAR Clause 252.201-7000 Contracting Officer's Representative;

4) Revised technical specifications: Section 05 50 14 STRUCTURAL METAL FABRICATIONS. Remove Section 05 50 14 in its entirety (16 pages), and replace with revised Section 05 50 14 (17 pages);

5) Revised Technical Plan, Drawing 64W315;

6) Insert FOR INFORMATION ONLY DRAWING 64N306 Operating Machinery General Arrangement;

7) Add FAR Clause 52.252-3 Alterations in Solicitation.

Amendment 0002

W912P520Q0029

Project: Wilson Strut Arm Fabrication

The purpose of this amendment is to:

1) Extend the Quote Date from 13-August-2020 1:00 PM to 17-August-2020 1:00 PM;

2) Post Questions and Answers;

3) Update FAR Clause 52.252-3.

(End of Summary of Changes)