W912P519T1000_RTA_TSpecs_AMD-0001.pdf
PDF 165 KB Posted
- Solicitation number
- W912P519T1000
About this file
REV W912P519T1000_RTA_TSpecs_AMD-0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P519T1000-0001.pdf | ||
| Price_Schedule_20181204.pdf | ||
| W912P519T1000_RTA_TSpecs.pdf | ||
| W912P519T1000_RTA_Drawings.pdf | ||
| W912P519T1000_21Dec2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Barkley Trash Rack Barkley Powerhouse WP12P519T1000 Lyon County, Kentucky
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 SCOPE
This section of the Specifications provides general information and requirements. The work consists of furnishing all equipment, labor, and materials required for the fabrication and delivery of new Barkley powerhouse Intake Trash Screens as described in the specifications and drawings.
1.2 INSPECTIONS AND ACCEPTANCE
Not withstanding other provisions of this contract, all materials required under this contract will be inspected and accepted by the Contracting Officer or his authorized representative(s). The Contracting Officer and his authorized representative are the individual(s) solely authorized to reject or approve materials, and order or direct any revision or change to the plans and specifications as presently shown and stated.
1.3 DELIVERIES
All deliveries must be made Monday through Thursday, from 06:30 to 16:00 hours, as specified in Section 05 59 13 FABRICATION OF HYDRAULIC STEEL STRUCTURES, paragraph 1.7 DELIVERY, STORAGE, AND HANDLING.
1.4 NON-DISCLOSURE OF GOVERNMENT INFORMATION
Neither the Contractor, nor Contractor personnel, shall divulge or release data or information developed or obtained under performance of this work statement, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data which bears a restrictive legend, other than as specified in this work statement.
Neither the Contractor nor the Contractor's employees shall disclose or cause to be disseminated, any information concerning the operations of the activity which could result in, or increase the likelihood of, the possibility of a breach of the activities, security or interrupt the continuity of its operation.
All inquiries received by the Contractor for information concerning work performed under this contract shall be referred to the Government for evaluation under the Freedom of Information Act of 1975, Public Law 93-502, 5 U.S.C., Section 552. The determination of whether records will be released will remain with the Government. The Contractor shall assist the COR in compiling information or records for submission upon request by the Government.
The Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any portion of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the COR. All
SECTION 01 00 00 Page 1 documentation showing individuals, names or other personal information will be controlled and protected. The provisions of the Privacy Act of 1974, Public Law 93-579, 5 U.S.C., Section 552a, shall apply.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 00 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11
PART 1 GENERAL
1.1 SCOPE
The scope of this section covers the submittal procedures required by this contract. All required submittals shall be provided in both hard copy and electronic format (PDF). Electronic submittals shall be sent to the Contracting Officer or designated representative via E_mail to the extent possible.
1.2 SUMMARY
The Contracting officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in contract drawings.
Each submittal is to be completed and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves;
test reports; test cylinders; samples; O&M manuals (including parts list);
certifications,; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby.
Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
A Submittal Register showing items of equipment and materials required by the specifications is attached to this section.
1.3 DEFINITIONS
1.3.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Pre-Fabrication Submittals
Submittals which are required prior to or the start of the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, SECTION 01 33 00 Page 1 features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
List of proposed products
Construction progress schedule
Network Analysis Schedule (NAS)
Submittal register
Schedule of prices
Work plan
Quality Control(QC) plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after
SECTION 01 33 00 Page 2 installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
1.3.2 Approving Authority
Office or designated person authorized to approve submittal.
1.3.3 Work
As used in this section, on- and off-site fabrication required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, except those SD-01 Pre-Fabrication Submittals noted above, fabrication, materials, products, equipment, and systems incorporated or to be incorporated in such fabrication.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation arefor information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SECTION 01 33 00 Page 3
SD-01 Pre-Fabrication Submittals
Submittal Register; G
1.5 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.5.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Within the terms of Contract Clause 52.236-21 SPECIFICATIONS AND DRAWINGS FOR FABRICATION, they are considered to be "shop drawings."
1.5.2 Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the Contrat Clause referred to above.
1.6 PREPARATION
1.6.1 Transmittal Form
Use the attached sample transmittal ENG Form 4025-R for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contracto. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted.
Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
Submit one electronic (PDF format) and two hard copies of submittals of shop drawings requiring review and approval only by QC organization and one electronic (PDF format) and two hard copies of shop drawings requiring review and approval by Contracting Officer.
1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions
Submit in compliance with quantity requirements specified for shop drawings.
1.7.3 Number of Copies SD-05 Design Data and SD-07 Certificates
Submit in compliance with quantity requirements specified for shop drawings.
SECTION 01 33 00 Page 4
1.7.4 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports
Submit in compliance with quantity and quality requirements specified for shop drawings other than field test results that will be submitted with QC reports.
1.7.5 Number of Copies of SD-10 Operation and Maintenance Data
Submit one electronic (PDF format) and two hard copies of O&M Data to the Contracting Officer for review and approval.
1.7.6 Number of Copies of SD-01 Pre-Fabrication Submittals and SD-11 Closeout Submittals
Unless otherwise specified, submit one electronic (PDF format) and two hard sets of administrative submittals.
1.8 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.9 SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
SECTION 01 33 00 Page 5
1.10 VARIATIONS
Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to Contract Clause FAR 52.236-21 SPECIFICATIONS AND DRAWINGS and will be considered where advantageous to Government.
1.10.1 Considering Variations
Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals.
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.10.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.
Clearly mark the proposed variation in all documentation.
Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.
The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.10.3 Warranting that Variations are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.10.4 Review Schedule Extension
In addition to normal submittal review period, a period of 10 calendar days will be allowed for consideration by the Government of submittals with variations.
1.11 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
SECTION 01 33 00 Page 6
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.12 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date submittals. one copies of the approved submittal will be retained by the Contracting Officer and one copies of the submittal will be returned to the Contractor. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.
1.12.1 Review Notations
Contracting Officer review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have
SECTION 01 33 00 Page 7 evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.13 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under Contract Clause FAR 52.243-4 CHANGES, is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.14 APPROVED/ACCEPTED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.15 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved
SECTION 01 33 00 Page 8 unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. Contractor to replace such materials or equipment to meet contract requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
1.16 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.17 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:
SECTION 01 33 00 Page 9
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 10
SECTION 01 35 50
PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES
05/24/2016
PART 1 GENERAL
1.1 GENERAL
The entire Project area is not open to the public. Depending upon the level of security threat, some Project areas may or may not be open to the Contractor and Contractor employees. Guidance and forms for project site security requirements are available on the Nashville District Public Website:
http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY (DA)
Army Directive 2014-05 (2014) Policy and Implementation Procedures for Commnon Access Card Credentialing and Installation Access for Uncleared Contractors
DA AR 190-13 (2011) The Army Physical Security Program
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
All contractors and all associated sub-contractors shall comply with applicable District and local security policies and procedures (provided by the Government representative). The contractor shall provide any/all requested information required for background checks, background investigations and/or to meet installation/facility access requirements to be accomplished by the District Security Office. Refer to the next paragraph for current background investigation requirements. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / DA AR 190-13), applicable installation, facility and area commander installation/facility access and
SECTION 01 35 50 Page 1 local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
Background Investigation Requirements: Since this is a delivery and/or supply only, there are no investigation requirements. However, the Contractor(s) will be escorted at all times while inside the restricted area.
1.4 ELECTRONIC MEDIA PROVIDED BY THE CONTRACTOR
The Contractor shall ensure all media, electronic files, etc., it provides to the Government shall be free of viruses, Trojan horses, bots, worms, malware, defects, or any other harmful item of a destructive nature.
1.5 CONDUCT OF CONTRACTOR EMPLOYEES
Meet the requirements of EM 385-1-1, Section 01.C Physical Qualifications of Employees, in providing on-site employees. All Contractor employees and subcontractors shall conduct themselves in a proper manner at all times. No alcoholic or intoxicating beverages or substances or illegal drugs or controlled substances not prescribed by a physician shall be possessed, consumed, and no contractor employee shall be under the influence of any such unauthorized substance while on Government property.
The Contractor shall remove from the site any individual whose continued employment is deemed by the appointed receiving agent to be contrary to the public interest or inconsistent with the best interests of the U.S.
Army Corps of Engineers.
The Contracting Officer or the appointed receiving agent will require the Contractor to immediately remove from the work site anyone who is incompetent or who endangers persons or property or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform the work. Notification to the Contractor will be made in writing if time and circumstances permit. Otherwise, notification will be verbal and will be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract and immediate replacement shall be made as required.
1.6 RELEASE OF SENSITIVE INFORMATION
The Contractor shall not make available to the news media or publicly disclose any data generated or reviewed under this Contract. Any inquiry received by the Contractor for information concerning work performed under this Contract shall be referred to the Government for evaluation under the Freedom of Information Act of 1975, Public Law 93-502, 5 U.S.C., Section
552. The determination of whether records will be released will remain with the Government. The Contractor shall assist the COR in compiling information or records for submission upon request by the government.
Reports and data generated under this Contract shall become the property of the Government and distribution to any other source by the Contractor, unless authorized is prohibited.
SECTION 01 35 50 Page 2
1.7 VEHICLES
1.7.1 Parking of Vehicles
Parking of private and Contractor vehicles shall be restricted to the areas designated by the Government. Vehicles shall be parked no closer than 30 feet from occupied buildings.
1.8 DAMAGE OR LOSS OF CONTRACTOR'S SUPPLIES AND PROPERTY
The Contractor is responsible for taking the action necessary to protect Contractor supplies, materials and equipment, and the personal property of Contractor employees from loss, damage or theft. The Government assumes no responsibility for theft, damage, etc., of the above. All incidents of theft (or suspected theft) of contractor materials, supplies, or equipment from project lands shall be reported to the COR.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 35 50 Page 3
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
11/14
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
One East Wacker Drive, Suite 700 Chicago, IL 60601-1802 Ph: 312-670-2400 Fax: 312-670-5403 Bookstore: 800-644-2400 E-mail: aisc@ware-pak.com Internet: http://www.aisc.org
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
P.O. Box 28518 1711 Arlingate Lane Columbus, OH 43228-0518 Ph: 800-222-2768; 614-274-6003 Fax: 614-274-6899 E-mail: tjones@asnt.org Internet: http://www.asnt.org
AMERICAN WELDING SOCIETY (AWS)
13301 NW 47 Ave Miami, FL 33054
Ph: 888-WELDING, 305-824-1177, 305-826-6192 Fax: 305-826-6195 E-mail: customer.service@awspubs.com Internet: http://www.aws.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org
SECTION 01 42 00 Page 1
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
1901 North Moore Street Arlington, VA 22209-1762 Ph: 703-525-1695 Fax: 703-528-2148 Internet: http://www.safetyequipment.org/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
1 Batterymarch Park Quincy, MA 02169-7471 Ph: 617-770-3000 Fax: 617-770-0700 Internet: http://www.nfpa.org
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
40 24th Street, 6th Floor Pittsburgh, PA 15222 Ph: 412-281-2331 Fax: 412-281-9992 E-mail: info@sspc.org Internet: http://www.sspc.org
U.S. ARMY (DA)
U.S. Army Publishing Directorate Ph: 703-614-3634 Internet: http://www.apd.army.mil
U.S. ARMY CORPS OF ENGINEERS (USACE)
CRD-C DOCUMENTS available on Internet:
http://www.wbdg.org/ccb/browse_cat.php?c=68 Order Other Documents from:
USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.publications.usace.army.mil/ or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
General Services Administration 1275 First St. NE Washington, DC 20417 Ph: 202-501-1231 Internet: http://www.gsaelibrary.gsa.gov/ElibMain/home.do Obtain documents from:
Acquisition Streamlining and Standardization Information System
(ASSIST)
Internet: https://assist.dla.mil/online/start/; account registration required
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road
SECTION 01 42 00 Page 2
College Park, MD 20740-6001 Ph: 866-272-6272 Fax: 301-837-0483 Internet: http://www.archives.gov Order documents from:
Superintendent of Documents U.S.Government Printing Office (GPO) 710 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
SECTION 01 42 00 Page 3
SECTION 05 59 13
FABRICATION OF HYDRAULIC STEEL STRUCTURES
05/17
PART 1 GENERAL
1.1 SCOPE
The work covered by these specifications consists of furnishing all material, equipment supplies and labor to fabricate and deliver the following structure: Barkley Powerhouse Intake Trash Racks. There are four turbine units at Barkley Powerhouse; each unit has three trash rack slots and each slot holds four frames of Trash racks making it 48 frames of Trash Racks in total.
1.2 SINGLE JOB PAYMENT ITEM
1.2.1 FABRICATION OF HYDRAULIC STEEL STRUCTURES
1.2.1.1 Payment
Payment will be made for costs associated with "Fabrication and Delivery Of Barkley Powerhouse Intake Trash Racks", which includes full compensation for furnishing all materials, equipment, and labor required to fabricate, deliver, and install the forty eight Trash Rack frames in accordance with this section.
1.2.1.2 Unit of Measure
Unit of measure: Job.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 303 (2016) Code of Standard Practice for Steel Buildings and Bridges
AISC 325 (2017) Steel Construction Manual
AISC 326 (2009) Detailing for Steel Construction
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ANSI/ASNT CP-189 (2016) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2012) Standard Specification for Pipe, SECTION 05 59 13 Page 1
Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A709/A709M (2017) Standard Specification for Structural Steel for Bridges
ASTM E165/E165M (2012) Standard Practice for Liquid Penetrant Examination for General Industry
ASTM E709 (2015) Standard Guide for Magnetic Particle Examination
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS A3.0M/A3.0 (2010) Standard Welding Terms and Definitions
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.4 SYSTEM DESCRIPTION
Provide a detailed Work Plan for fabrication, including descriptions of maintaining and measuring control dimension, shop facilities, equipment, number of personnel, and related information prior to the Pre-fabrication Conference. Update the Work Plan as conditions warrant. Provide procedures which ensure the safe conduct of the work, careful removal and disposition of materials, protection of property that is to remain undisturbed, and coordination with other work in progress. Include in the procedures a detailed description of the methods and equipment to be used for each operation, and the sequence of operations in accordance with EM 385-1-1 for all onsite work. Fabricate the following structures according to this section of the specifications:
1. Barkley Powerhouse Intake Trash Racks
a. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Do not commence welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and approved. Maintain records of the test results obtained in welding procedure, and welder, welding operator, and tacker performance qualifications.
b. As it is used in these specifications, "The Engineer" refers to the District engineer of record.
c. Schedule a Prefabrication Conference as soon as practicable after
SECTION 05 59 13 Page 2 approval of the preconstruction submittals listed in this section and prior to any fabrication. Include, at a minimum, the following personnel at the Prefabrication Conference, the Prime Contractor, Fabricator, the Fabricator's primary QC representative, the COR, the GQAR, and the Engineer of record for the structure or structures being fabricated. The Prefabrication Conference should occur either at the Fabrication Facilities or a similar location as deemed appropriate.
The format of the prefabrication conference should include a review of these specifications, discussion of the fabricator's QCP, identification of roles and responsibilities including roles and responsibilities of fabrication subcontractors. Submit key welding submittals, including shop drawings, welding procedure specifications, the control plan, and certified testing personnel prior to holding the Prefabrication Conference. The contractor should prepare for this meeting by reviewing plans and specifications and code concerns prior to this meeting and be prepared to discuss any issues regarding the fabrication including WPS qualification requirements and required witnessing of testing. Identify and discuss complicated connections that require prototyping for both welding and inspection. In addition, hold points/witness points will be established during the prefabrication conference.
1.4.1 Weld Tracking Log Template
Submit for approval a weld tracking log template, a minimum of 30 calendar days prior to commencement of fabrication, to identify all necessary components to be addressed in the tracking of all welds for the structures in question. Develop and maintain a weld tracking log as described in the following paragraphs.
1.4.2 Weld Tracking Log
Provide a log capable of individually identifying and tracking every weld on the project. Follow the numbering scheme shown on the shop drawings for member identification. Include the member to be welded, member type (FCM and Non-FCM), type of weld including temporary and tack welds which are not fully consumed, welding position, applicable WPS reference, AWS joint preparation designation, name or stamping designation of welder, welding operator or tacker, date and time of completion of welding and/or tacking (weld time required to designate required hold time prior to NDT), name and date of CWI visual inspection, NDT testing performed, including the type of inspection, date(s) of inspection, inspector name, and the acceptance criteria used, description of defects found and reason for non-compliance, corrective action taken, or whether the weld is acceptable. Match weld identification between the shop drawings and weld tracking log. Continually maintain the weld tracking log. Ensure the weld tracking log, including draft copies of NDT testing, is available on the shop floor during any inspection. Provide a bound, completed log for each structure included in the Fabrication Record upon completion of the fabrication of each structure.
1.4.3 Quality Control and Material Tracking
Provide structural material fabricated and assembled meeting the requirements specified in this document and on the contract drawings.
Before the start of work, the fabricator is to supply a Quality Control Plan (QCP) to the Engineer for approval. Ensure the QCP describes the methods, equipment, and procedures utilized to ensure quality control.
SECTION 05 59 13 Page 3
The Engineer will use the AASHTO/NSBA, "Steel Bridge Fabrication QC/QA Guide Specification," as the basis for approving the QCP.
Submit a Material Tracking Log Template. Identify how all material is tracked in the fabrication shop from receiving through complete assembly in the material tracking log template. Use low stress die stamps for the identification coding of material. Stamp each component with low-stress stamping to include the project number, part number, and additional required information to permit tracking of material. Use material travelers to conform with the material tracking log and quality control plan.
The contractor/fabricator has the responsibility to ensure that all work performed complies with the QCP and generate Non Conformance Reports (NCR's)for all work deemed to not meet quality control standards. If the Government determines that fabrication work does not comply with the QCP or that fabrication does not follow approved fabrication procedures, the Government will deem the materials as non-conforming. If the Government finds non-conforming work, the prime contractor is required to direct the fabricator/subcontractor to immediately correct the procedure, conduct additional tests, and submit a written non-conformance report containing data required by the Government to ensure compliance with the QCP.
Perform additional testing as required by the Government at no additional cost to the Government.
Submit Material Test Reports or Certified Test Reports for all material used in fabrication prior to incorporation into the structure.
1.4.4 Welding Procedure Specifications (WPS)
Submit a Welding Procedure Specification (WPS) for each weld, including prequalified welds, in accordance with paragraph Welded Connections before fabrication is commenced. Individually identify and reference Welding Procedure Specifications on the shop drawings. In case of conflict between this specification and AWS D1.1M/D1.1 as applicable, this specification governs.
1.4.5 NDT Written Practice
Establish the minimum requirements for education, training, experience, examination and certification of personnel responsible for conducting nondestructive tests while in the employment of the contracted company within the Written Practice. It applies to all persons conducting nondestructive tests that are required to be certified to the provisions of ANSI/ASNT CP-189. Additionally the methods of nondestructive testing are to be outlined and described in the written practice and explanation as to how they are used in accordance with the applicable codes, standards and specifications. In addition to the written practice, submit NDT Equipment Calibration Records for all NDT equipment used by both the fabricator and any subcontractors performing NDE.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. "DO" signifies the submittal will be sent to the Technical Lead in the District Office and reviewed by the appropriate staff. Submit the following in accordance
SECTION 05 59 13 Page 4 with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Pre-Fabrication Submittals
Quality Control Plan (QCP); G, DO Material Tracking Log Template; G Welding Procedure Specifications (WPS); G, DO
Heat Straightening Procedure; G Weld Tracking Log Template; G
Non Conformance Report Form Template; G, DO Non Conformance Report; G, DO NDT Written Practice; G, DO
SD-02 Shop Drawings
Shop Drawings; G, DO Assembly and Fabrication Sequencing Plan; G, DO Fabrication Quality Control Reports Delivery/Shipping Plan; G, DO
SD-03 Product Data
Materials Disposition Record SD-06 Test Reports
Certified Test Reports; G, DO Weld Tracking Log; G, DO Witness Points Non Conformance Report
SD-07 Certificates
Certified Welder Performance Qualifications (WPQ); G Certified Weld Inspector Qualifications (CWI); G Certified Procedure Qualification Records (PQR); G, DO Qualification of Structural Steel Fabricator; G, DO
SD-09 Manufacturer's Field Reports
Control Dimensions; G, DO Fabrication Record; G, DO
1.6 QUALITY ASSURANCE
Establish Witness Points for the Initial QA Inspection, Intermediate QA Inspections, and Final Inspection as follows. Start the Initial QA Inspection after the Government has determined that there is substantial completion of components that comprise a reasonable sampling of each significant FCM and non-FCM details. Determine the extent of completion and details and the date of the Initial QA Inspection at the Prefabrication Conference by the Government after discussion with the Contractor. At that time, produce a detailed schedule showing the progression of work and completion of components. This schedule is to be updated weekly and provided by e-mail to the Contracting Officer. Give the Contracting Officer two weeks notice prior to the predetermined date for the Initial QA Inspection, including adjustments for changes in schedule. Intermediate QA Inspections will be conducted on an as needed
SECTION 05 59 13 Page 5 basis and at the discretion of the Government. Provide unpainted components for each QA NDT and Visual Inspection. At these stages of construction, give the Contracting Officer three calendar days to inspect the structure. After the Contracting Officer and the Engineer of Record have inspected the structure, make any changes required to the structure as directed by the Contracting Officer before proceeding with any additional welding. Proceed with the construction until the next witness point is reached, unless it is waived in writing by the Contracting Officer. Each structure fabricated is subject to a Final Fabrication Inspection prior to painting. Schedule the Final Fabrication Inspection of each structure with the Contracting Officer and the Engineer of Record. Give the Contracting Officer a minimum notice of two weeks prior to the Final Fabrication Inspection.
1.6.1 Qualification of Welders and Welding Operators
Submit welder, welding operator and tacker qualification certification for each welder, welding operator or tack welder to the Government Representative/Contracting Officer/ Engineer and approved before fabrication is commenced in accordance with paragraph Welded Connections.
Submit welder and welding operator qualification test records on forms similar or equivalent to the sample forms in AWS D1.1/D1.1M. Ensure welder qualifications are approved by a CWI meeting the specified minimum qualifications of these specifications. Welders, welding operators, and tack welders are limited to welding procedures for which they are certified. Qualify welders according to AWS D1.1. Ensure all qualifications are current prior to commencing any work. Submit a log for each welder showing that he/she is current in the process and procedures being proposed for this work. Test welds are to be prepared, welded, and tested in accordance with the requirements of AWS D1.1/D1.1M. Before assigning any welder, welding operator, or tacker to work under this contract, submit the names of the welders, welding operators, and tackers to be employed, and certification that each individual is qualified as specified. State the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Keep the certification current for the duration of the contract.
1.6.2 Inspector Qualifications
Qualify all inspectors performing structural steel inspection in accordance with these specifications, according to the requirements of AWS QC1. Provide an AWS Certified Welding Inspector (CWI) as the primary point of contact for quality control of welding. When several CWI and NDT technicians are working, designate one primary individual as having primary responsibility for all quality control The CWI who serves as the primary point of contact must provide evidence of having initially tested for certification in accordance with AWS D1.1/D1.1M or possesses an AWS D1.1/D1.1M endorsement. Alternately the CWI may be an SCWI to serve as this primary point of contact. Do not utilize non-certified inspectors or certified associate weld inspectors (CAWI) for inspection under these specifications. Qualify all personnel who perform NDT in accordance with:
ANSI/ASNT CP-189 NDT Level II or III. Inspectors who are Level III ASNT NDT certified are required to supervise all personnel performing NDT. An ASNT Level III may conduct tests if that person provides documentation of having passed a Level II practical examination within the last three (3) years.
SECTION 05 59 13 Page 6
1.6.3 Qualification of Structural Steel Fabricator
The fabricating plant and fabricator shall be certified under the AISC (American Institute of Steel Construction) Quality Certification Program with one of the following certifications:
BU: Certfied Building Fabricator CPT: Certified Bridge and Highway Component Manufacturer SBR: Bridge Fabricator - Simple IBR: Certified Bridge Fabricator - Intermediate ABR: Certified Bridge Fabricator - Advanced HYD: Certified Hydraulic Steel Structures Fabricator and possess five 5 years documented experience on projects of similar scope. Similar scope consists of having fabricated structures of similar size including total weight, member thicknesses and dimensions, geometry, tolerances, and handling requirements. Submit copies of the AISC certificate indicating that the fabrication plant meets the specified structural steelwork category and documented experience.
1.6.4 Quality Assurance Testing by the Government
Material component parts may be subjected to any form of nondestructive testing, as directed by the Contracting Officer. This may include radiography, ultrasonic, magnetic partical, or any other test that is capable of thouroughly investigating the part in question. The cost of such investigation will be borne by the Government.