Barkley Powerhouse, Design & Purchase Trash Screens
Solicitation number
W912P519T1000
Issued by

About this file

Amendment W912P519T1000-0001

View the file

Other files

File Type Posted
W912P519T1000_RTA_TSpecs_AMD-0001.pdf PDF
Price_Schedule_20181204.pdf PDF
W912P519T1000_RTA_TSpecs.pdf PDF
W912P519T1000_RTA_Drawings.pdf PDF
W912P519T1000_21Dec2018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING BRANCH (EJC)

EUGENIA.J.CORDER@USACE.ARMY.MIL

110 NINTH AVE SOUTH, ROOM A405

NASHVILLE TN 37203-3817

W38XDD82909937

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: Barkley Lock, Trash Screens & Frames

The purpose of this amendment is to:

1. Post Q&A;

2. Attach REV Technical Specifications document W912P519T1000_RTA_TSpecs_AMD_0001.pdf (page 25, all changes highlighted in yellow );

3. Extend Quote Due Date from 16 January 2019 at 11:00 AM local time to 22 January 2019 at 11:00 AM local time; and

4. Update FAR clause 52.252-3.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P519T1000

X 9B. DATED (SEE ITEM 11)

21-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jan-2019

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, RM A680

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912P5

FACILITY CODECODE

EMAIL:TEL:

W912P519T1000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS & ANSWERS

Amendment Questions for Barkley Trash Screens:

Project: Barkley Trash Screens

This solicitation is being amended to address the questions asked during the question period.

1. QUESTION: Your Solicitation calls for certain AISC certification that we do not have, do you every make exceptions to these requirements? We build similar structures to these daily with-in very tight tolerances. We have a strong QMS system in place.

ANSWER: Please refer to W912P519T1000_RTA_TSpecs.pdf, Section 05 59 12; Page 9; 1.6.3 Qualification of Structural Steel Fabricator. Contractors submitting a quote in response to this Solicitation must have at least one of the following AISC fabrication certifications:

BU: Certified Building Fabricator (previously noted as acronym "STD") SBR: Certified Bridge Fabricator - Simple IBR: Certified Bridge Fabricator - Intermediate (Major) ABR: Certified Bridge Fabricator - Advanced (Major) CBR: Major Steel Bridges CPT: Certified Component Manufacturer - Bridge HYD: Certified Hydraulic Fabricator

2. QUESTION: Please confirm that there is no trash rack embedded frames (as per drawings Q9-79/661.4 and Q9- 79/662.3) to quote for this bid.

ANSWER: The embedded items depicted in Drawings Q9-79/661.4 and Q9-79/662.3 are outside the scope of this Contract. Those drawings were included in the Solicitation were provided for information only.

3. QUESTION: We are an AISC Certified Steel Fabricator, but do not have the bridge endorsement. Does this not allow us to participate in the project? Would our Certified Steel Fabricator from AISC be acceptable?

ANSWER: Reference the Government’s response to Question No. 1. A bridge endorsement is not necessary.

4. QUESTION: We do not have the AISC certification but that is the standard that we fabricate our projects. Can the actual certificate absolutely needed for proof that that is the standard that we fabricate our products?

ANSWER: Reference the Government’s response to Question No. 1.

No additional questions will be accepted after this amendment.

W912P519T1000

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 16-Jan-2019 11:00 AM to 22-Jan-2019 11:00 AM.

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001 Project: Barkley Lock, Trash Screens & Frames

The purpose of this amendment is to:

1. Post Q&A;

2. Attach REV Technical Specifications document W912P519T1000_RTA_TSpecs_AMD_0001.pdf (page 25, all changes highlighted in yellow);

3. Extend Quote Due Date from 16 January 2019 at 11:00 AM local time to 22 January 2019 at 11:00 AM local time; and

4. Update FAR clause 52.252-3.

(End of Summary of Changes)