Solicitation Amendment W912P519T0050 P0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD91066129
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
W912P519T0050 - Cordell Hull Pow er House, Emergency Diesel Generators
This solicitation is being amended to answ er questions received during the question period, provide a new question and answ er period, provide reference draw ings, and extend quote due date. Questions are due by September 3, 2019 12:00 pm central time, and the quote due date is extended to September 10, 2019 at 12:00 pm central time.
FAR clause 52.252-3 has been updated.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P519T0050
X 9B. DATED (SEE ITEM 11)
07-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2019
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P519T0050
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 30-Aug-2019 01:00 PM to 10-Sep-2019 12:00 PM.
The following have been added by full text:
QUESTIONS AND ANSWERS
Question 1: Are there any drawings available for this project?
Answer 1: Yes, they are for reference only as many changes have been made since the drawings were made.
Question 2: Will there be a site visit?
Answer 2: Yes, however, the site visit date has passed.
Question 3: Is installation a part of this requirement?
Answer 3: This Contract is a supply contract with all installation being performed by Government personnel.
Question 4: In reference to Section 26 32 14 – 1.3.6., Fuel Consumption, of the Technical Specifications, what is the maximum fuel consumption to meet in gallons per hour?
Answer 4: Gallons per hour can be obtained from the following (simplified) calculations:
(1) Net kW * Runtime in Hours (at full rated load or maximum fuel consumption load if not at full rated load)
= kWh Produced;
(2) kWh Produced * Maximum Fuel Consumption in Lbs. per kWh (Para. 1.3.6) = Lbs. of Fuel Consumed
(3) Lbs. of Fuel Consumed / Fuel Weight per Gallon = Gallons of Fuel Consumed during Runtime in Hours
(4) Gallons of Fuel Consumed during Runtime / Runtime in Hours = Gallons of Fuel per Hour
Question 5: Section 26 32 14 – 1.3.7., Starting Requirements, of the Technical Specifications references the generator breaker being closed when rated voltage and frequency have been achieved. What closes the breaker when rated voltage and frequency are reached and is the open/close of the breaker from an external signal or from the generator set control panel any time the rated voltage and frequency is reached?
Answer 5: See SECTION 26 32 14, paragraph 2.23 “AUTOMATIC ENGINE-GENERATOR-SET SYSTEM
OPERATION” and paragraph 2.20 “ENGINE-GENERATOR SET CONTROLS, CONTROLLER, AND
INSTRUMENTATION.
Question 6: Section 26 32 14 – 2.5.4 Vault Fuel Tank, of the Technical Specifications calls out to be Hoover Vault
Tank or an approved equal with UL 142 listing. Hoover Vault Tanks are UL 2085 listed tanks, which are much more expensive than UL 142 listed fuel tanks. UL 2085 tanks are insulated fire rated tanks where UL 142 listed tanks are not. Containment Systems has a GenCube tank that is similar to the Hoover Vault Tank, but is UL 142 listed and not
UL 2085 listed. Will you need the UL 142 tank to be supplied or the UL 2085?
Answer 6: The Containment Systems Hoover Vault ® Tank is default UL 2085 listed with the option to have additional protection to make it both UL 2085 listed and UL 142 listed. The intention is for the provided fuel tank to be both UL 2085 listed and UL 142 listed.
Question 7: Are there any pictures available of the Generator room? Is this an indoor installation? Are outdoor enclosures required?
Answer 7: A pre-bid site visit was held in lieu of pictures being provided. The generator will be installed indoors by Government personnel. Outdoor enclosures are not required, though indoor NEMA enclosures are required.
Question 8: For the Starting System, both batteries and air start are mentioned within the technical specifications.
Which one is the actual requirement or are both required?
Answer 8: Both compressed air start and battery start are required.
Question 9: For the Exhaust System, we are unable to determine the extent of the exhaust system which needs to be provided for the Generator. Can you provide more details on its components and how much of the exhaust system is the Generator provider is responsible for?
Answer 9: The existing exhaust duct will need to be modified as required for the new generator. The generator manufacturer is only required to provide their standard products. The Contractor will provide additional duct sections as required for the installation of all exhaust components and for connection to existing embedded sections.
New exhaust system is to reuse the existing embedded portions (and reuse portions beyond the generator room that lead outside) of the exhaust system. That is, the generator provided will need to be compatible with existing embedded portions of the existing exhaust system.
Question 10: The basis of design appears to be the Caterpillar C9 Genset. Have you been using the marine grade
Genset as your basis, or were you able to obtain a design change on the standard land based C9 to accommodate the heat exchanger and air start?
Answer 10: The marine grade genset was used as the basis for this design. This accommodated the air start and heat exchanger while maintaining the vendor warranty for the product.
Question 11: Can drawings of the fuel tank vault and corresponding fuel piping be provided, since the hatch could not be opened for the pre-bid?
Answer 11: Drawings will be provided of the fuel tank vault and corresponding fuel piping for reference only.
These drawings are considered to be unreliable as numerous changes have been made to the project-site since the drawings were made/updated. The specifications shall govern; see SECTION 26 32 14, paragraph 2.5.4 “Vault Fuel
Tank” for size restrictions and the remainder of the SECTION for additional requirements and information.
Question 12: Is insulation for the exhaust system to be provided with the new portions of the exhaust system?
Answer 12: Insulation is to be provided in accordance with SECTION 26 32 14, paragraphs 2.10.3 & 2.26 (as well as any other applicable paragraphs/SECTIONS).
Question 13: Where does the load bank to be provided tie into the generator system? That is, is it tied into the generator locally or is there a tie-in point elsewhere?
Answer 13: The load bank is tied-in locally in the generator room.
Question 14: What is the extent of the raw water piping to be required for supply, given that a new raw water pump is required for supply? What brand of fittings are to be used for the raw water piping? Is thermal insulation required for the new raw water piping?
Answer 14: The raw water piping and fittings to be supplied is from the new raw water pump to the new generator in the same arrangement as existing. Piping is to be sized appropriately to industry standard to supply the required cooling to the new generator, but shall be no smaller than existing. Preferred brand for pipe fittings is Victaulic. The existing piping has thermal insulation, thus replacement thermal insulation is required to be provided.
Question 15: What is the horsepower rating of the existing raw water pump?
Answer 15: The new raw water pump is to deliver water sufficient to cool the new generator under the worst-case scenario (highest ambient temperature, highest fluid temperature, maximum load). Highest ambient temperature and highest fluid temperature are given in SECTION 26 32 14, paragraph 2.7. The new pump may need to be larger than the existing to accommodate the new generator, but shall be no smaller than the existing pump. The existing pump has a rating of 3 horsepower, according to its nameplate.
Question 16: Will the generator be used for anything but emergency standby status (for emissions purposes)?
Answer 16: The generator is only intended for emergency standby service.
Question 17: What is the minimum water temperature of the raw water?
Answer 17: The maximum water temperature of the raw water is to be used to size the cooling system for the new generator and is given in the specifications (see Answer 15 for spec. paragraph). The minimum water temperature of the raw water is similar to the minimum lake temperature at approximately 55 degrees Fahrenheit.
Question 18: Will the Government be offloading the delivered equipment?
Answer 18: Yes. See SECTION 01 00 00, paragraph 1.3 “DELIVERIES” for more details, including mandatory delivery coordination contact information and delivery address. Note: Personnel will likely not be available to unload deliveries on: Fridays, Federal holidays, and weekends; further details can be obtained from authorized personnel when nearing the delivery timeframe.
Question 19: Were there reference drawings provided during the pre-bid site visit?
Answer 19: Yes. The following drawings (reference only – considered unreliable) were provided for viewing only:
Q16-79/53.2, Q16-79/57.2, Q16-79/110.2, and Q16-79/582.2. These drawings are provided with some additional reference drawings in response to these questions.
Question 20: When discussing the fuel tank, it was pointed out the tank is in a sealed concrete vault. So there was no way to take measurements to ensure that a replacement will fit, if it is even going back to that location. We were given the technical specifications for the old fuel tank would be posted. Are these available yet?
Answer 20: Reference drawings are to be provided with the information that we have on the fuel tank and piping.
The physical dimensions of the fuel tank shall not exceed the dimensions noted in SECTION 26 32 14, paragraph
2.5.4.
Question 21: Will the new fuel tank go back into the vault or will it be relocated? If it is going back into the vault, where will be the location of the temporary fuel tank? If it will be permanently relocated, what location will it be placed and will new fuel lines be required?
Answer 21: The new fuel tank will be going into the same place as existing tank, that is, in the vault. Temporary fuel tank or lack thereof is NOT a part of this contract. Fuel lines from the new generator to the new tank are part of this effort.
Question 22: What is the exact size of the exhaust pipe?
Answer 22: See provided reference drawings for the information we have. New exhaust ducting will need to be compatible as mentioned in Answer 9.
The following have been modified:
QUOTE INSTRUCTIONS REVISION
QUOTE INSTRUCTIONS
1. DESCRIPTION OF WORK: This is a Total Small Business Set-Aside for the furnishing all equipment, labor, and materials required for the procurement and delivery of a new Emergency Stand-By Diesel Generator in accordance with the attached Technical Specifications. Price must include all shipping and fees associated with the delivery of the generator.
2. TYPE OF CONTRACT: The Government intends to award a Firm-Fixed Price supply contract.
3. BASIS FOR SELECTION OF AWARD: Award shall be made to the lowest priced offeror who is found to be responsible. Quote must include cut-sheets on generator system, meet or exceed the technical specifications and delivery schedule to be considered for award.
4. PLACE OF DELIVERY: Cordell Hull Power House, Carthage, TN
5. DELIVERY DATE: Generator shall be delivered 120 calendar days after contract award.
6. POC FOR COMMUNICATIONS: Any communications regarding this procurement before award must be made in writing to the Contracting Branch, Attn: Stephanie Richardson at email stephanie.a.richardson@usace.army.mil. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, and telephone number to include area code.
QUESTIONS: Questions must be submitted to Stephanie Richardson at email stephanie.a.richardson@usace.army.mil by September 3, 2019 at 12:00 p.m. Central Time.
Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities are highly discouraged and will not be allowed.
7. QUOTE SUBMISSION:
a. Quotes can be emailed to Stephanie Richardson at email stephanie.a.richardson@usace.army.mil or mailed to:
U.S. ARMY CORPS OF ENGINEERS
NASHVILLE CONTRACTING BRANCH (CELRN-RC-N)
ATTN: STEPHANIE RICHARDSON
110 NINTH AVE SOUTH, ROOM A405
NASHVILLE, TN 37203
b. The quote shall include the following elements to be considered for award:
(1) SF 1449: Filled out by the vendor for: Block 17a, Block 17b (if applicable), Block 30a, Block 30b, and
Block 30c.
(2) Acknowledge all SF 30s, Amendment of Solicitation (if applicable).
(3) Cut-sheets on generator system.
(4) CLIN: To include the Total Price for Contract Line Item Number 0001.
(5) In accordance with FAR 52.204-7, System for Award Management, registration is required in the System for Award Management (SAM) database located at www.sam.gov. More specifically, "An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation."
(See FAR 52.204-7(b)(1)).
For SAM Customer Service, contact:
Federal Service Desk
URL: www.fsd.gov
Hours: 8am - 8pm (Eastern Time)
US Calls: 866-606-8220
International Calls: 334-206-7828
DSN: 866-606-8220
IMPORTANT NOTICE: Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity
Identifier (known as DUNS).
The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage
(www.sam.gov).
(6) Provide business Unique Entity Identifier Number (previously known as DUNS):
_______________________________ (phone 800-333-0505 for DUNS).
(7) Provide business CAGE code: _________________________________
(8) Tax Identification Number: ___________________________________
8. APPARENT SUCCESSFUL OFFEROR: The following may be requested from the apparent successful offeror prior to actual award of the contract:
a. A minimum of one (1) banking reference for their firm and a minimum of three (3) past performance references for similar contracted work.
(1) The banking reference should include the financial institution’s legal name, complete physical address, a point-of-contact (POC) at the financial institution, the POC’s telephone number, and email address.
http://www.fsd.gov/ http://www.sam.gov/
(2) The past performance references should include firm’s name, the contract number, the contract period of performance and/or contract completion date, the contract’s aggregate value, a brief description of the project, a POC, the POC’s telephone number, and email address.
9. CONTRACTOR FEEDBACK: Help us in BUILDING STRONG. Please provide us with your feedback, comments and recommendations for improvement by visiting our Interactive Customer Evaluation (ICE) website at:
http://ice.disa.mil/index.cfm?fa=card&service_provider_id=110826&site_id=856&service_category_ID=14
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001
W912P519T0050 - Cordell Hull Power House, Emergency Diesel Generators
This solicitation is being amended to add site visit information to Quote Instructions and extend the quote due date to allow the Government time to answer questions received during the question period. Site visit is scheduled for
August 21st at 10:00 a.m. Central Time. The quote due date is extended to 30 August 2019 at 1:00 pm central time.
See attached revised Quote Instructions. The changes are highlighted in yellow. FAR clause 52.237-1, Site Visit has been added.
Amendment 0002
W912P519T0050 - Cordell Hull Power House, Emergency Diesel Generators
This solicitation is being amended to answer questions received during the question period, provide a new question and answer period, provide reference drawings, and extend quote due date. Questions are due by September 3, 2019
12:00 pm central time, and the quote due date is extended to September 10, 2019 at 12:00 pm central time.
FAR clause 52.252-3 has been updated.
(End of Summary of Changes) http://ice.disa.mil/index.cfm?fa=card&service_provider_id=110826&site_id=856&service_category_ID=14