Technical Specifications required for this solicitation. All equipment, labor, and materials required for the procurement and delivery of a new Emergency Stand-By Diesel Generator must be in accordance with the attached Technical Specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P519T0050_REFERENCE_DRAWINGS.PDF | ||
| W912P519T0050_P0002_Amendment.pdf | ||
| W912P519T0050_P0001_Amendment.pdf | ||
| Site_Visit_Registration_Form.pdf | ||
| W912P519T0050_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps Of Engineers Nashville District
Emergency Generator Replacement
Cordell Hull Powerhouse Cumberland River Smith County, Tennessee
Technical Specifications
Ready to Advertise (RTA)
June 2019
Solicitation No. TBD
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
Emergency Generator Replacement Cordell Hull Powerhouse RTA Smith County, Tennessee
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 35 50 PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
DIVISION 26 - ELECTRICAL
26 32 14 DIESEL-GENERATOR SET, STATIONARY 250 KW, EMERGENCY
STAND-BY APPLICATION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 SCOPE
1.2 INSPECTIONS AND ACCEPTANCE
1.3 DELIVERIES
1.4 NON-DISCLOSURE OF GOVERNMENT INFORMATION
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 00 00 Page 1
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 SCOPE
This section of the Specifications provides general information and requirements. The work consists of furnishing all equipment, labor, and materials required for the procurement and delivery of a new Emergency Stand-By Diesel Generator at Cordell Hull Power Plant, as described in Section 26 32 14 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS.
1.2 INSPECTIONS AND ACCEPTANCE
Not withstanding other provisions of this contract, all materials required under this contract will be inspected and accepted by the Project Representative or his authorized representative(s). The Project Representative and his authorized representative are the individual(s) solely authorized to reject or approve materials, and order or direct any revision or change to the plans and specifications as presently shown and stated.
1.3 DELIVERIES
All deliveries must be made Monday - Thursday 06:30 - 16:00 to:
Cordell Hull Powerhouse 150 Corps Lane Carthage, TN 37030
The Government will inspect and accept (or reject) all deliveries. The Government will off-load and store all delivered items. Items shall be arranged on the delivery vehicles such that no damage occurs during shipping. All sling lifting lugs shall be directed up.
The Contractor must notify site personnel at phone number (615)-735-1023, seven calendar days prior to any shipment to ensure proper personnel and equipment are available for inspection and unloading. The notification shall describe in detail the proposed method of delivery and shall include, but not be limited to the following:
a. Type and size of truck and/or trailer to be used for delivery.
b. Cranes and other lifting and positioning equipment that will be required.
c. Packaging of components.
d. Blocking.
SECTION 01 00 00 Page 2
1.4 NON-DISCLOSURE OF GOVERNMENT INFORMATION
Neither the Contractor, nor Contractor personnel, shall divulge or release data or information developed or obtained under performance of this work statement, except to authorized Government personnel or upon written approval of the Project Representative. The Contractor shall not use, disclose, or reproduce proprietary data which bears a restrictive legend, other than as specified in this work statement.
Neither the Contractor nor the Contractor's employees shall disclose or cause to be disseminated, any information concerning the operations of the activity which could result in, or increase the likelihood of, the possibility of a breach of the activities, security or interrupt the continuity of its operation.
All inquiries received by the Contractor for information concerning work performed under this contract shall be referred to the Government for evaluation under the Freedom of Information Act of 1975, Public Law 93-502, 5 U.S.C., Section 552. The determination of whether records will be released will remain with the Government. The Contractor shall assist the Project Representative in compiling information or records for submission upon request by the Government.
The Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any portion of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the Project Representative. All documentation showing individuals, names or other personal information will be controlled and protected. The provisions of the Privacy Act of 1974, Public Law 93-579, 5 U.S.C., Section 552a, shall apply.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 00 00 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SCOPE
1.2 SUMMARY
1.3 DEFINITIONS
1.3.1 Submittal Descriptions (SD)
1.3.2 Approving Authority
1.3.3 Work
1.4 SUBMITTALS
1.5 SUBMITTAL CLASSIFICATION
1.5.1 Government Approved G
1.5.2 Information Only
1.6 PREPARATION
1.6.1 Transmittal Form
1.6.2 Electronic File Format
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
1.7.2 Number of Copies of SD-03 Product Data and SD-08
Manufacturer's Instructions
1.7.3 Number of Copies SD-05 Design Data and SD-07 Certificates
1.7.4 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's
Field Reports
1.7.5 Number of Copies of SD-10 Operation and Maintenance Data
1.7.6 Number of Copies of SD-01 Pre-Fabrication Submittals and SD-11
Closeout Submittals
1.8 INFORMATION ONLY SUBMITTALS
1.9 VARIATIONS
1.9.1 Considering Variations
1.9.2 Proposing Variations
1.9.3 Warranting That Variations Are Compatible
1.9.4 Review Schedule Is Modified
1.10 SUBMITTAL REGISTER
1.10.1 Use of Submittal Register
1.10.2 Contractor Use of Submittal Register
1.10.3 Approving Authority Use of Submittal Register
1.10.4 Copies Delivered to the Government
1.11 SCHEDULING
1.12 GOVERNMENT APPROVING AUTHORITY
1.12.1 Review Notations
1.13 DISAPPROVED OR REJECTED SUBMITTALS
1.14 APPROVED/ACCEPTED SUBMITTALS
1.15 APPROVED SAMPLES
1.16 WITHHOLDING OF PAYMENT
1.17 STAMPS
PART 2 PRODUCTS
SECTION 01 33 00 Page 1
PART 3 EXECUTION
ATTACHMENTS:
ENG Form 4025
SUBMITTAL REGISTER
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SCOPE
The scope of this Section covers the submittal procedures required by this contract. All required submittals shall be provided in electronic format (PDF). Electronic submittals shall be sent to the Project Representative or designated representative via E-Mail to the extent possible.
1.2 SUMMARY
The Project Representative may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.3 DEFINITIONS
1.3.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the
SECTION 01 33 00 Page 3 product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Text of posted operating instructions.
SD-10 Operation and Maintenance Data
SECTION 01 33 00 Page 4
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
1.3.2 Approving Authority
Office or designated person authorized to approve submittal.
1.3.3 Work
As used in this section, off-site fabrication required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Fabrication Submittals noted above, fabrication, materials, products, equipment, and systems incorporated or to be incorporated in such fabrication.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SD-03 Product Data
Submittal Register; G
1.5 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.5.1 Government Approved G
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Project Representative.
Within the terms of the contract, they are considered to be "shop drawings."
1.5.2 Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.6 PREPARATION
1.6.1 Transmittal Form
Use the attached sample transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be
SECTION 01 33 00 Page 5 furnished to the Contractor. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.6.2 Electronic File Format
Provide submittals other than material samples in electronic formats. The electronic submittal file must be compiled as a single, complete document, to include the Transmittal Form described in paragraph 1.6.1 Transmittal Form. The electronic submittal file must be named specifically according to its contents (e.g. 01 45 01-1.2_Quality Control Plan.pdf).
Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Project Representative. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Email electronic submittal documents fewer than 10MB to an email address as directed by the Project Representative. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:
https://safe.amrdec.army.mil/safe/
Provide hard copies of submittals as specified in this or other specification sections.
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
Submit one electronic (PDF format) and two hard copies of submittals of shop drawings requiring review and approval only by QC organization and one electronic (PDF format) and two hard copies of shop drawings requiring review and approval by Project Representative.
1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions
Submit in compliance with quantity requirements specified for shop drawings.
1.7.3 Number of Copies SD-05 Design Data and SD-07 Certificates
Submit in compliance with quantity requirements specified for shop drawings.
1.7.4 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports
Submit in compliance with quantity and quality requirements specified for shop drawings other than field test results that will be submitted with QC reports.
SECTION 01 33 00 Page 6
1.7.5 Number of Copies of SD-10 Operation and Maintenance Data
Submit one electronic (PDF format) and two hard copies of O&M Data to the Project Representative for review and approval.
1.7.6 Number of Copies of SD-01 Pre-Fabrication Submittals and SD-11 Closeout Submittals
Unless otherwise specified, submit one electronic (PDF format) and two hard sets of administrative submittals.
1.8 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Project Representative is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Project Representative from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.9 VARIATIONS
Variations from contract requirements will be considered where advantageous to the Government and require both Designer of Record (DOR) and Government approval.
1.9.1 Considering Variations
Discussion with Project Representative prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals.
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.9.2 Proposing Variations
When proposing variation, deliver written request to the Project Representative, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.
The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
SECTION 01 33 00 Page 7
1.9.3 Warranting That Variations Are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.9.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 5 working days will be allowed for consideration by the Government of submittals with variations.
1.10 SUBMITTAL REGISTER
Prepare and maintain SUBMITTAL REGISTER, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.10.1 Use of Submittal Register
Submit submittal register. Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register:
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.10.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register or equivalent fields in program utilized by Contractor with each submittal
SECTION 01 33 00 Page 8 throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.10.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.10.4 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government.
1.11 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Project Representative does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
e. Except as specified otherwise, allow review period, beginning with
SECTION 01 33 00 Page 9 receipt by approving authority, that includes at least 30 working days for Project Representative approval. Period of review for submittals with Project Representative approval begins when Government receives submittal from Contractor.
f. Period of review for each resubmittal is the same as for initial submittal.
1.12 GOVERNMENT APPROVING AUTHORITY
When approving authority is Project Representative, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. One copy of the approved submittal will be retained by the Project Representative and one copy of the submittal will be returned to the Contractor. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.
1.12.1 Review Notations
Project Representative review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" "or approved except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.13 DISAPPROVED OR REJECTED SUBMITTALS
Contractor shall make corrections required by the Project Representative.
SECTION 01 33 00 Page 10
If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the Project Representative. Contractor is responsible for the dimensions and design of connection details and execution of work.
Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.14 APPROVED/ACCEPTED SUBMITTALS
The Project Representative's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of fabrication, materials, detailing and other information are satisfactory.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory fabrication of all work.
After submittals have been approved or accepted by the Project Representative, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.15 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Project Representative for testing. Samples failing to meet contract requirements will automatically void previous approvals.
Contractor to replace such materials or equipment to meet contract requirements.
Approval of the Contractor's samples by the Project Representative does not
SECTION 01 33 00 Page 11 relieve the Contractor of his responsibilities under the contract.
1.16 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.17 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 12
SU
BM
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
PA
G
ES
R
TA
C or de ll
H ul l P ow er ho us e
Em er ge nc y G en er at or
R ep la ce m en t
SD
-0
Pr od uc t D at a 1.
G
Su bm itt al
R eg is te r
SD
-0
Sh op
D ra w in gs 1.
5.
G E
/M D et ai le d
D ra w in gs
SD
-0
Pr od uc t D at a
2.
M an uf ac tu re r's C at al og G
In st ru ct io ns
G en er al
In st al la tio n
2.
5.
G
E /M
Va ul t F ue l T an k 2.
7.
1.
G
E /M
R aw
W at er C oo lin g Pu m p
2.
G E
/M Lo ad B an k
2.
G E
/M G en er at or
2.
G E
/M C om pr es se d Ai r S ta rti ng
S ys te m
2.
G E
/M C ab le
A nd
W ire
2.
5.
1.
G E
/M M ai n
Fu el
P um p
SD
-0
D es ig n
D at a 2.
G
So un d Li m ita tio ns
Po w er F ac to r 2.
.4
Ti m e- D el ay o n
Al ar m s
1.
3.
Vi br at io n
Is ol at io n 2.
7.
G E
/M H ea t E xc ha ng er
2.
G E
/M C oo lin g Sy st em
SD
-0
Te st R ep or ts Fa ct or y Pe rfo rm an ce
T es ts G
E /M
O ns ite In sp ec tio n an d
Te st s
SD
-0
C er tif ic at es
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
SU
BM
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
PA
G
ES
R
TA
C or de ll
H ul l P ow er ho us e
Em er ge nc y G en er at or
R ep la ce m en t
1.
3.
Vi br at io n
Is ol at io n Pr ot ot yp e
Te st s 1.
3.
R el ia bi lit y an d
D ur ab ilit y 2.
Em is si on s
2.
So un d lim ita tio ns 2.
.1
C ur re nt
B al an ce
2.
M at er ia ls a nd E qu ip m en t 2.
Fa ct or y In sp ec tio n an d
Te st s In sp ec tio ns
2.
C oo lin g
Sy st em
SD
-1
O pe ra tio n an d M ai nt en an ce D at a
1.
7.
G
O pe ra tio n M an ua l 1.
7.
G M ai nt en an ce M an ua l 1.
7.
Ex tra
M at er ia ls
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
F H
UW
LI
WK
D W
WK
H D E R Y H V X E P
LW
WH
G
LW
H P V K D Y H E H H Q
UH
Y
LH
Z H G
LQ
G H
WD
LO
D Q G D
UH
F R
UU
H F W D Q G
LQ
V
WU
LF
W F R Q
IR
UP
D Q F H Z
LW
K
WK
H
F R Q
WU
D F W G
UD
Z
LQ
J V D Q G V S H F
LI
LF
D
WL
R Q V H F H S W D V R
WK
H U Z
LV
H
V
WD
WH
G
,6 ,6
,7
,6 ,6 ,7
,7
,2 R Y H U R Q O\
R Q H V H F
WL
R Q Z
LW
K
H D F K
WU
D Q V P
LW
WD
O�
,7 ,2
LV
W E ,W H P
R
,7 ,1 ,3
�5 H D G
LQ
V
WU
X F
WL
R Q V R Q
WK
H
UH
Y H
UV
H V
LG
H S
UL
R U
WR
LQ
LW
LD
WL
Q J
WK
LV
IR
UP
,2 ,1 ,7
�7 K
LV
V H F
WL
R Q Z
LO
O E H
LQ
LW
LD
WH
G E
WK
H F R Q
WU
D F
WR
U�
,7
,7 ,1 ,7
,2 ,2
,7
D
,3 ,2 ,7 ,7
�7 S H V L] H P R G H O Q X P E H U� H
WF
E
,1
�6 H H
LQ
V
WU
X F
WL
R Q Q R
F
G
H
,1
I�
J
,2
�6 H H
LQ
V
WU
X F
WL
R Q
R
K
L�
�5
�3
UR
S R Q H Q W�
,7 ,2 ,6
,6
,7 ,6
,2
,1 ,2
H F
WL
R Q Z
LO
O E H
LQ
LW
LD
WH
G E
WK
H R Q
WU
D F
WR
U
LQ
WK
H
UH
T X
LU
H G Q X P E H U R I F R S
LH
V
D F K
WU
D Q V P
LW
WD
O V K D
OO
E H Q X P E H
UH
G F R Q V H F X
WL
Y H O\
LQ
WK
H V S D F H S
UR
Y
LG
H G
IR
U
UD
Q V P
LW
WD
O R K
LV
Q X P E H U�
LQ
D G G
LW
LR
Q
WR
WK
H F R Q
WU
D F W Q X P E H U� Z
LO
O
IR
UP
D V H
UL
D O
Q X P E H U
IR
U
LG
H Q
WL
I\
LQ
J H D F K V X E P
LW
WD
O�
R U Q H Z
V X E P
LW
WD
OV
R U
UH
V X E P
LW
WD
OV
P D
UN
WK
H D S S
UR
S
UL
D
WH
E R R Q
UH
V X E P
LW
WD
OV
LQ
V H
UW
WU
D Q V P
LW
WD
O Q X P E H U R I
OD
V W V X E P
LV
V
LR
Q D V
Z H
OO
D V
WK
H Q H Z
V X E P
LW
WD
O Q X P E H U�
K H ,W H P
R Z
LO
O E H
WK
H V D P H ,W H P
R D V
LQ
G
LF
D
WH
G R Q
�5
IR
U H D F K H Q
WU
R Q
WK
LV
IR
UP
X E P
LW
WD
OV
UH
T X
LU
LQ
J H S H G
LW
LR
X V K D Q G
OL
Q J Z
LO
O E H V X E P
LW
WH
G R Q D V H S D
UD
WH
IR
UP
H S D
UD
WH
WU
D Q V P
LW
WD
O
IR
UP
Z
LO
O E H X V H G
IR
U V X E P
LW
WD
OV
X Q G H U V H S D
UD
WH
V H F
WL
R Q V R I
WK
H V S H F
LI
LF
D
WL
R Q V
F K H F N V K D
OO
E H S
OD
F H G
LQ
WK
H D
UL
D
WL
R Q F R
OX
P Q Z K H Q D V X E P
LW
WD
O
LV
Q R W
LQ
D F F R
UG
D Q F H Z
LW
K
WK
H S
OD
Q V D Q G V S H F
LI
LF
D
WL
R Q V D
OV
R D Z
UL
WW
H Q V
WD
WH
P H Q W
WR
WK
D W H
II
H F W
V K D
OO
E H
LQ
F
OX
G H G
LQ
WK
H V S D F H S
UR
Y
LG
H G
IR
U H P D
UN
V
R
UP
LV
V H
OI
�W
UD
Q V P
LW
WD
O�
OH
WW
H U R I
WU
D Q V P
LW
WD
O
LV
Q R W
UH
T X
LU
H G
K H Q D V D P S
OH
R I P D
WH
UL
D O R U D Q X
ID
F
WX
UH
U
V H
UW
LI
LF
D
WH
R I R P S
OL
D Q F H
LV
WU
D Q V P
LW
WH
G
LQ
G
LF
D
WH
D P S
OH
R U H
UW
LI
LF
D
WH
LQ
F R
OX
P Q F H F
WL
R Q
�6
UP
R
US
V R I Q J
LQ
H H
UV
D S S
UR
Y
LQ
J D X
WK
R
UL
W\
Z
LO
O D V V
LJ
Q D F
WL
R Q F R G H V D V
LQ
G
LF
D
WH
G E H
OR
Z
LQ
V S D F H S
UR
Y
LG
H G
LQ
H F
WL
R Q F R
OX
P Q L
WR
H D F K
LW
H P
V X E P
LW
WH
G ,Q
D G G
LW
LR
Q
WK
H Z
LO
O H Q V X
UH
H Q F
OR
V X
UH
V D
UH
LQ
G
LF
D
WH
G D Q G D
WW
D F K H G
WR
WK
H
IR
UP
S
UL
R U
WR
UH
WX
UQ
WR
WK
H F R Q
WU
D F
WR
U�
K H R Q
WU
D F
WR
U Z
LO
O D V V
LJ
Q D F
WL
R Q F R G H V D V
LQ
G
LF
D
WH
G E H
OR
Z
LQ
H F
WL
R Q F R
OX
P Q J
WR
H D F K
LW
H P
V X E P
LW
WH
G
,1 ,2 ,9 ,7 ,7
S S
UR
Y H G D V V X E P
LW
WH
G
S S
UR
Y H G H F H S W D V Q R
WH
G R Q G
UD
Z
LQ
J V
S S
UR
Y H G H F H S W D V Q R
WH
G R Q G
UD
Z
LQ
J V
H
IH
U
WR
D
WW
D F K H G V K H H W
UH
V X E P
LV
V
LR
Q
UH
T X
LU
H G
LO
O E H
UH
WX
UQ
H G E V H S D
UD
WH
F R
UU
H V S R Q G H Q F H
S S
UR
Y D O R I
LW
H P V G R H V Q R W
UH
OL
H Y H
WK
H F R Q
WU
D F
WR
U
IU
R P
F R P S O\
LQ
J Z
LW
K D
OO
WK
H
UH
T X
LU
H P H Q
WV
R I
WK
H F R Q
WU
D F W S
OD
Q V D Q G V S H F
LI
LF
D
WL
R Q V
�5 H Y H
UV
H R I R
UP
�5
LV
D S S
UR
Y H G �6 H H D
WW
D F K H G
H F H
LS
W D F N Q R Z
OH
G J H G
H F H
LS
W D F N Q R Z
OH
G J H G G R H V Q R W F R P S O\
D V Q R
WH
G Z
LW
K F R Q
WU
D F W
UH
T X
LU
H P H Q
WV
WK
H U �6
S H F
LI
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 50
PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES
PART 1 GENERAL
1.1 GENERAL
1.2 REFERENCES
1.3 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
1.4 ELECTRONIC MEDIA PROVIDED BY THE CONTRACTOR
1.5 CONDUCT OF CONTRACTOR EMPLOYEES
1.6 RELEASE OF SENSITIVE INFORMATION
1.7 VEHICLES
1.7.1 Parking of Vehicles
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 35 50 Page 1
SECTION 01 35 50
PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES
PART 1 GENERAL
1.1 GENERAL
The entire Project area is not open to the public. Depending upon the level of security threat, some Project areas may or may not be open to the Contractor and Contractor employees. Guidance and forms for project site security requirements are available on the Nashville District Public Website:
http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY (DA)
Army Directive 2014-05 (2014) Policy and Implementation Procedures for Commnon Access Card Credentialing and Installation Access for Uncleared Contractors
DA AR 190-13 (2011) The Army Physical Security Program
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
All Contractor and associated sub-contractor employees shall comply with all applicable project and local security policies and procedures (provided by the district representative). The Contractor must also provide all information required for background checks to meet installation/facility access requirements to be accomplished by the District Security Management Office. Contractor workforce must comply with all personal identity verification requirements (FAR Clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / DA AR 190-13), applicable installation, facility and area commander installation/facility access and
SECTION 01 35 50 Page 2 local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
Background Investigation Requirements: Since the information provided that delivery will be outside of restricted areas where vetted employees will take possession, there are no investigation requirements at this time.
Coordination should be made with District Security Office personnel if there are any changes to the procedures.
1.4 ELECTRONIC MEDIA PROVIDED BY THE CONTRACTOR
The Contractor shall ensure all media, electronic files, etc., it provides to the Government shall be free of viruses, Trojan horses, bots, worms, malware, defects, or any other harmful item of a destructive nature.
1.5 CONDUCT OF CONTRACTOR EMPLOYEES
Meet the requirements of EM 385-1-1, Section 01.C Physical Qualifications of Employees, in providing on-site employees. All Contractor employees and subcontractors shall conduct themselves in a proper manner at all times.
No alcoholic or intoxicating beverages or substances or illegal drugs or controlled substances not prescribed by a physician shall be possessed, consumed, and no contractor employee shall be under the influence of any such unauthorized substance while on Government property.
The Contractor shall remove from the site any individual whose continued employment is deemed by the appointed receiving agent to be contrary to the public interest or inconsistent with the best interests of the U.S. Army Corps of Engineers.
The Project Representative or the appointed receiving agent will require the Contractor to immediately remove from the work site anyone who is incompetent or who endangers persons or property or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform the work. Notification to the Contractor will be made in writing if time and circumstances permit. Otherwise, notification will be verbal and will be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract and immediate replacement shall be made as required.
1.6 RELEASE OF SENSITIVE INFORMATION
The Contractor shall not make available to the news media or publicly disclose any data generated or reviewed under this Contract. Any inquiry received by the Contractor for information concerning work performed under this Contract shall be referred to the Government for evaluation under the Freedom of Information Act of 1975, Public Law 93-502, 5 U.S.C., Section
552. The determination of whether records will be released will remain with the Government. The Contractor shall assist the Project Representative in compiling information or records for submission upon request by the government. Reports and data generated under this Contract shall become the property of the Government and distribution to any other source by the Contractor, unless authorized is prohibited.
SECTION 01 35 50 Page 3
1.7 VEHICLES
1.7.1 Parking of Vehicles
Parking of private and Contractor vehicles shall be restricted to the areas designated by the Government. Vehicles shall be parked no closer than 30 feet from occupied buildings.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 35 50 Page 4
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 42 00 Page 1
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
1791 Tullie Circle, NE Atlanta, GA 30329 Ph: 800-527-4723 or 404-636-8400 Fax: 404-321-5478 E-mail: ashrae@ashrae.org Internet: http://www.ashrae.org
ASME INTERNATIONAL (ASME)
Two Park Avenue, M/S 10E New York, NY 10016-5990 Ph: 800-843-2763 Fax: 973-882-1717 E-mail: customercare@asme.org Internet: http://www.asme.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org
ELECTRICAL GENERATING SYSTEMS ASSOCIATION (EGSA)
1650 South Dixie Highway, Suite 400 Boca Raton, FL 33432-7462 Ph: 561-750-5575 Fax: 561-395-8557
SECTION 01 42 00 Page 2
Internet: http://www.egsa.org
FM GLOBAL (FM)
270 Central Avenue P.O. Box 7500 Johnston, RI 02919-4923 Ph: 877-364-6726 Fax: 401-275-3029 E-mail: servicedesk.myrisk@fmglobal.com Internet: http://www.fmglobal.com
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
445 and 501 Hoes Lane Piscataway, NJ 08854-4141 Ph: 732-981-0060 or 800-701-4333 Fax: 732-562-9667 E-mail: onlinesupport@ieee.org Internet: http://www.ieee.org
INTERNATIONAL CODE COUNCIL (ICC)
500 New Jersey Avenue, NW 6th Floor, Washington, DC 20001 Ph: 800-786-4452 or 888-422-7233 E-mail: order@iccsafe.org Internet: www.iccsafe.org
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
127 Park Street, NE Vienna, VA 22180-4602 Ph: 703-281-6613 E-mail: info@mss-hq.com Internet: http://mss-hq.org/Store/index.cfm
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
1300 North 17th Street, Suite 900 Arlington, VA 22209 Ph: 703-841-3200 Internet: http://www.nema.org/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
1 Batterymarch Park Quincy, MA 02169-7471 Ph: 617-770-3000 Fax: 617-770-0700 Internet: http://www.nfpa.org
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
400 Commonwealth Drive Warrendale, PA 15096 Ph: 724-776-4970 Fax: 877-606-7323 E-mail: customerservice@sae.org Internet: http://www.sae.org
U.S. ARMY (DA)
U.S. Army Publishing Directorate Ph: 703-614-3634 Internet: http://www.apd.army.mil
SECTION 01 42 00 Page 3
U.S. ARMY CORPS OF ENGINEERS (USACE)
CRD-C DOCUMENTS available on Internet:
http://www.wbdg.org/ccb/browse_cat.php?c=68 Order Other Documents from:
USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.publications.usace.army.mil/ or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx
UNDERWRITERS LABORATORIES (UL)
2600 N.W. Lake Road Camas, WA 98607-8542 Ph: 877-854-3577 E-mail: CEC.us@us.ul.com Internet: http://www.ul.com/ UL Directories available through IHS at http://www.ihs.com
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
SECTION 01 42 00 Page 4
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 32 14
DIESEL-GENERATOR SET, STATIONARY 250 KW, EMERGENCY STAND-BY APPLICATION
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SYSTEM DESCRIPTION
1.3.1 Engine-Generator Parameter Schedule
1.3.2 Power Rating
1.3.3 Transient Response
1.3.4 Vibration Isolation
1.3.4.1 Vibration Limitations
1.3.4.2 Torsional Analysis
1.3.4.3 Performance Data
1.3.5 Reliability and Durability
1.3.6 Fuel Consumption
1.3.7 Starting Time Requirements
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Conformance to Codes and Standards
1.5.2 Experience
1.5.3 Seismic Requirements
1.5.3.1 Equipment Requirements
1.5.3.2 Non-Rigid or Flexibly-Mounted Equipment
1.5.4 Detailed Drawings
1.6 DELIVERY, STORAGE AND HANDLING
1.7 MAINTENANCE SERVICE
1.7.1 Operation Manual
1.7.2 Maintenance Manual
1.7.3 Service
1.7.4 Extra Materials
1.8 WARRANTY
1.8.1 Two Year Standby (ISO 8528-1: ESP) Generator Set Warranty
1.8.2 General Materials
PART 2 PRODUCTS
2.1 NAMEPLATES
2.2 SAFETY DEVICES
2.3 MATERIALS AND EQUIPMENT
2.3.1 Circuit Breakers
2.3.2 Filter Elements (Fuel-oil, Lubricating-oil, and Combustion-air)
2.3.3 Pipe (Fuel/Lube-oil, Compressed-Air, Coolant and Exhaust)
2.3.4 Pipe Flanges and Fittings
2.3.4.1 Pipe Flanges and Flanged Fittings
2.3.4.2 Pipe Welding Fittings
2.3.4.3 Threaded Fittings
2.3.4.4 Valves
2.3.4.5 Gaskets
2.3.5 Pipe Hangers
SECTION 26 32 14 Page 1
2.3.6 Electrical Enclosures
2.3.6.1 General
2.3.6.2 Panelboards
2.3.7 Electric Motors
2.3.8 Motor Controllers
2.4 ENGINE
2.5 FUEL SYSTEM
2.5.1 Pumps
2.5.1.1 Main Fuel Pump
2.5.2 Fuel Filter
2.5.3 Relief/Bypass Valve
2.5.4 Vault Fuel Tank
2.5.4.1 Capacity
2.5.4.2 Local Fuel Fill
2.5.4.3 Fuel Level Controls
2.6 LUBRICATION
2.6.1 Lube-Oil Filter
2.6.2 Lube-Oil Sensors
2.7 COOLING SYSTEM
2.7.1 Engine Coolant Pumps
2.7.1.1 Raw Water Cooling Pump
2.7.2 Heat Exchanger
2.7.2.1 Shell and U-Tube Type Heat Exchanger
2.7.3 Expansion Tank
2.7.4 Temperature Sensors
2.8 SOUND LIMITATIONS
2.9 AIR INTAKE EQUIPMENT
2.10 EXHAUST SYSTEM
2.10.1 Flexible Sections and Expansion Joints
2.10.2 Exhaust Muffler
2.10.3 Exhaust Piping
2.11 EMISSIONS
2.12 COMPRESSED AIR STARTING SYSTEM
2.12.1 DC Electric Starting System
2.12.2 Motor Starting
2.12.3 Controls
2.12.4 Capacity
2.12.5 Battery
2.12.6 Battery Charger
2.12.7 Starting Aids
2.12.7.1 Jacket-Coolant Heaters
2.13 GOVERNOR
2.14 GENERATOR
2.14.1 Current Balance
2.14.2 Voltage Balance
2.14.3 Waveform
2.15 EXCITER
2.16 CABLE AND WIRE
2.17 VOLTAGE REGULATOR
2.17.1 Digital Voltage Regulator
2.18 GENERATOR ISOLATION AND PROTECTION
2.18.1 Panelboards
2.18.2 Devices
2.18.2.1 Thermal-Overload Protection
2.18.2.2 General
2.18.2.3 Construction
2.18.2.4 Ratings
2.18.2.5 Manual/Automatic Selection
2.18.2.6 MOLDED-CASE CIRCUIT BREAKERS
SECTION 26 32 14 Page 2
2.18.2.6.1 General
2.18.2.6.2 Construction
2.18.2.6.3 Ratings
2.18.2.6.4 Thermal-Magnetic Trip Elements
2.18.2.6.5 Solid-State Trip Elements
2.19 SAFETY SYSTEM
2.19.1 Visual Alarm Signal
2.19.2 Alarms and Action Logic
2.19.2.1 Shutdown
2.19.2.2 Problem
2.19.3 Local Alarm Panel
2.19.3.1 Engine Alarm/Shutdown
2.19.3.2 Generator Alarm/Shutdown
2.19.3.3 Voltage Regulator Alarm/Shutdown
2.19.4 Time-Delay on Alarms
2.20 ENGINE-GENERATOR SET CONTROLS, CONTROLLER AND INSTRUMENTATION
2.20.1 Environmental Controls
2.20.2 Functional Requirements
2.20.3 Digital Monitoring Capability and Metering
2.20.3.1 Engine
2.20.3.2 Generator
2.20.3.3 Voltage Regulation
2.20.4 Inputs and Outputs
2.20.4.1 Programmable Digital Inputs
2.20.4.2 Programmable Relay Outputs
2.20.4.3 Programmable Discrete Outputs
2.20.5 Maintenance
2.21 PANELS
2.21.1 Enclosures
2.21.2 Electronic
2.21.3 Parameter Display
2.22 SURGE PROTECTION
2.23 AUTOMATIC ENGINE-GENERATOR-SET SYSTEM OPERATION
2.23.1 Main Transformer Differential Fault
2.24 MANUAL ENGINE-GENERATOR SET SYSTEM OPERATION
2.25 BASE
2.26 THERMAL INSULATION
2.27 PAINTING AND FINISHING
2.28 LOAD BANK
2.29 FACTORY INSPECTION AND TESTS
2.30 ON-SITE TRAINING
PART 3 NOT IN USE
SECTION 26 32 14 Page 3
SECTION 26 32 14
DIESEL-GENERATOR SET, STATIONARY 250 KW, EMERGENCY STAND-BY APPLICATION
PART 1 GENERAL
1.1 SCOPE
Provide materials, equipment, labor, hardware, and miscellaneous items specified herein and services necessary for the procurement of an Emergency Stand-By Diesel Generator with a water/water tube heat exchanger properly sized for the engine. The engine-generator shall be installed in the existing Cordell Hull Power Plant diesel generator room. To gain access to the diesel generator room the generator set shall be lowered through a 14'-0" x 10'-0" access hatch to elevation 491.0 and guided to the existing diesel generator room. Access to this room is through 6 foot wide double door.
Provide a Simplex Dynamite 300kW portable load bank or approved equal. The load bank shall be a completely self-contained, freestanding, portable unit which includes all resistive load elements, load control devices, load element branch circuit fuse protection, system protection devices, UL listed and NEMA type enclosure.
Any items not specified in detail by the Contract/Specifications but which are incidental to or necessary for the complete assembly and proper operation of work described herein or reasonably implied, shall be furnished as if called for in detail by the Contract/Specifications.
Discrepancies or ambiguities occurring in the Contract/Specification must be reported prior to the submission of the bid proposal. Submission of the bid without clarification will reflect acceptance of the Contract/Specification as written. Failure to verify the existing conditions and equipment shall not relieve the contractor from responsibility for the satisfactory operation of the equipment.
Th…