W912P518B0007_0002_TSpecs_ReplacementPages.pdf
PDF 182 KB Posted
- Attached to
- Dale Hollow Elevator Modernization
- Solicitation number
- W912P518B0007
About this file
Technical Specifications changed pages
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fr ei ght El evat or Moder ni zat i on Dal e Hol l ow Power pl ant W912P518B0007 Amendment No. 0002 Cl ay Count y, Tennessee
1. 2. 3 Asbest os Abat ement
Asbest os abat ement wor k shal l be as speci f i ed i n Sect i on 02 82 14 ASBESTOS
ABATEMENT WORK.
1. 2. 3. 1 Payment
Payment wi l l be made at t he 1 Job pr i ce f or " Asbest os Abat ement , " whi ch i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor r equi r ed t o r emove al l asbest os cont ai ni ng mat er i al s. Thi s wi l l i ncl ude consi der at i on f or al l cost s associ at ed wi t h bul k sampl i ng, t est i ng, submi t t al pr epar at i on, asbest os wor k mobi l i zat i on and demobi l i zat i on, di sposal of ACM, and ser vi ces of cer t i f i ed asbest os abat ement and ai r moni t or i ng per sonnel .
1. 2. 3. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 2. 4 New Equi pment
New Equi pment shal l be pr ovi ded as speci f i ed i n Sect i on 14 21 13 ELECTRI C TRACTI ON FREI GHT ELEVATORS and Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON
SYSTEM.
1. 2. 4. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h el evat or moder ni zat i on as speci f i ed i n Sect i on 14 21 13 ELECTRI C TRACTI ON FREI GHT ELEVATORS and 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM. Payment wi l l be made at t he 1 Job pr i ce f or " New Equi pment " . Thi s pr i ce shal l i ncl ude consi der at i on f or al l r equi r ed l abor , mat er i al s, and equi pment f or el evat or moder ni zat i on wor k t hat i s not al r eady i ncl uded i n ot her payment i t ems.
1. 2. 4. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 2. 5 Ret ai ni ng Equi pment
Per f or m equi pment r econdi t i oni ng i n accor dance wi t h Sect i on 14 21 13
ELECTRI C TRACTI ON FREI GHT ELEVATORS.
1. 2. 5. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h equi pment r econdi t i oni ng as speci f i ed i n Sect i on 14 21 13 ELECTRI C TRACTI ON FREI GHT ELEVATORS.
Payment wi l l be made at t he 1 Job pr i ce f or al l i t ems t o be r econdi t i oned as l i s t ed bel ow:
a. Hoi st way door s, hoi st way ent r ance f r ames and hoi st way ent r ance sills.
b. Pi t l adder , pi t r ai l - t o- r ai l channel s.
c. Ot her equi pment as speci f i ed i n Sect i on 14 21 13.
These pr i ces shal l i ncl ude consi der at i on f or al l r equi r ed l abor , mat er i al s, and equi pment t o per f or m each r econdi t i oni ng.
SECTI ON 01 22 00 Page 3
SECTI ON TABLE OF CONTENTS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
ELECTRI C TRACTI ON FREI GHT ELEVATORS
PART 1 GENERAL
1. 1 SCOPE
1. 1. 1 El ect r i cal Equi pment
1. 1. 2 Asbest os Abat ement
1. 1. 3 Lead Pai nt Abat ement
1. 2 NEW EQUI PMENT
1. 3 RETAI NI NG EQUI PMENT
1. 4 NON- PROPRI ETARY EQUI PMENT
1. 5 " FOR I NFORMATI ON ONLY" DRAWI NGS AND ATTACHMENTS
1. 6 REFERENCES
1. 7 SUBMI TTALS
1. 7. 1 Shop Dr awi ng Requi r ement s
1. 7. 2 Pr oduct Dat a Requi r ement s
1. 7. 3 Desi gn Dat a
1. 7. 4 Wel der s ' Requi r ement s
1. 7. 5 Oper at i on & Mai nt enance Cont r ol Pr ogr am ( MCP)
1. 8 QUALI TY ASSURANCE
1. 8. 1 Qual i f i cat i on
1. 8. 1. 1 El evat or Cont r act or ' s El evat or Techni c i ans
1. 8. 2 Manuf act ur er s ' Techni cal Suppor t
1. 8. 3 Oper at i on and Mai nt enance Dat a
1. 8. 4 Wi r i ng Di agr ams
1. 8. 5 Machi ne Room Cabi net
1. 9 NEW I NSTALLATI ON SERVI CE
1. 9. 1 Adj ust ment s
1. 10 FI RE PROTECTI ON SYSTEM
1. 10. 1 Fi r e Al ar m I ni t i at i ng Devi ces
1. 10. 2 Fi r e Spr i nkl er s
1. 11 DELI VERY, STORAGE, AND HANDLI NG
1. 12 WORKI NG HOURS
PART 2 PRODUCTS
2. 1 ELEVATOR DESCRI PTI ON
2. 1. 1 El evat or Desi gn Par amet er s
2. 1. 2 Cab Encl osur e and Hoi st way Ent r ance Assembl i es
2. 1. 2. 1 Car Fr ame
2. 1. 2. 2 Fl oor Pl at f or m
2. 1. 2. 3 Wal l s
2. 1. 2. 4 Car Gat e
2. 1. 2. 5 Per f or at ed Met al Top
2. 1. 2. 6 Car I nspect i on St at i on
2. 1. 2. 7 Top of Car Handr ai l
2. 1. 2. 8 El evat or Posi t i on Sensor
2. 1. 2. 9 Hoi st way ( Fr ei ght ) Door s, Fr ame and Accessor i es
2. 1. 2. 9. 1 Hoi st way Door s and Fr ame
2. 1. 2. 9. 2 Hoi st way Door Accessor i es
SECTI ON 14 21 13 Page 1
2. 1. 2. 9. 3 Hoi st way Door s and Car Gat e Oper at i on and Sequenci ng
2. 1. 3 Gover nor
2. 2 AUTOMATI C SI MPLEX SELECTI VE/ COLLECTI VE ELEVATOR OPERATI ON
2. 2. 1 El evat or Cal l Regi st r at i on
2. 2. 2 Oper at i on
2. 2. 3 Emer gency St op Swi t ch
2. 2. 4 Non- St op Swi t ch
2. 2. 5 Ser vi ce- Demand Bel l
2. 2. 6 Car Di spat ch
2. 2. 7 Fi r e Det ect i on Syst em
2. 3 SPECI AL OPERATI ON AND CONTROL
2. 3. 1 Keys f or El evat or Key Swi t ches
2. 3. 2 Fi r ef i ght er s ' Emer gency Oper at i on ( FEO)
2. 3. 2. 1 Fi r ef i ght er s ' Emer gency Oper at i on ( FEO) Key Box
2. 3. 3 Hoi st way Access Oper at i on
2. 3. 4 Fi r ef i ght er s ' Ser vi ce
2. 3. 5 Smoke Det ect or s
2. 3. 6 Car Oper at i ng Devi ce
2. 3. 7 Hoi st way Access Swi t ches
2. 3. 8 I ndependent Ser vi ce
2. 3. 9 El evat or Oper at i on
2. 3. 9. 1 Sel ect i ve Col l ect i ve Aut omat i c Oper at i on
2. 3. 10 Par ki ng Swi t ch
2. 4 ELEVATOR DRI VE MACHI NE, HOI ST MOTOR, AND DRI VE MOTOR
2. 4. 1 Over head Gear ed Tr act i on Machi ne
2. 4. 2 Manuf act ur er ' s Fact or y Tr ai ni ng and Techni cal Suppor t
2. 4. 3 Ascendi ng Car Over speed and Uni nt ended Car Movement Pr ot ect i on
2. 5 CONTROL EQUI PMENT
2. 5. 1 Per f or mance
2. 5. 2 Mot or Cont r ol Equi pment
2. 5. 2. 1 Sol i d- St at e Mot or Dr i ve ( VFD)
2. 5. 3 El evat or Mi cr opr ocessor Cont r ol l er
2. 5. 3. 1 El evat or Cont r ol l er I nt er f ace Cabi net
2. 5. 3. 1. 1 El evat or Mi cr opr ocessor Human I nt er f ace
2. 5. 3. 2 Sof t war e and Document at i on
2. 5. 3. 3 El evat or Cont r ol l er Cer t i f i cat i on
2. 5. 4 Ter mi nal St op Devi ces
2. 5. 5 Level i ng Devi ces
2. 6 OPERATI NG PANELS, SI GNAL FI XTURES, AND COMMUNI CATI ONS CABI NETS
2. 6. 1 Car and Hal l St at i on and Door Oper at i ng But t ons
2. 6. 1. 1 Hal l St at i on Door - Oper at i ng But t ons
2. 6. 2 Fr ei ght Car - Oper at i ng Panel
2. 6. 2. 1 Oper at or Cont r ol s
2. 6. 2. 2 Ser vi ce Cont r ol s
2. 6. 2. 3 Cer t i f i cat e Wi ndow
2. 6. 2. 4 Emer gency Si gnal i ng Devi ces
2. 6. 3 El evat or I n- Car Posi t i on I ndi cat or s
2. 6. 4 Hal l Cal l Landi ng Fi xt ur es
2. 6. 4. 1 Desi gnat ed Landi ng Hal l Cal l Fi xt ur e
2. 6. 4. 1. 1 Locat i on of COMMUNI CATI ON MEANS FAI LURE ( CMF) Vi sual
Signal
2. 6. 5 Emer gency or St andby Power
2. 7 CAR DOOR EQUI PMENT
2. 7. 1 Car Door Oper at or
2. 7. 2 I nf r a- r ed Cur t ai n Uni t
2. 8 FREI GHT ELEVATOR GUI DES, PLATFORM, AND ENCLOSURE
2. 8. 1 Gui des
2. 8. 2 Car Shel l Ret ur n Panel s, Door s, Ent r ance Col umns, and Tr ansom
2. 8. 3 Car Encl osur e Top
SECTI ON 14 21 13 Page 2
2. 8. 4 Car Gat e
2. 8. 5 Car Ent r ance Si l l
2. 8. 6 I n- Car Hor i zont al Buck- Boar d Wal l Pr ot ect i on
2. 8. 7 Cab Fi ni sh Fl oor
2. 8. 8 Car Fan
2. 8. 9 Car Li ght i ng
2. 8. 10 Top- of - Car I nspect i on Oper at i on
2. 8. 11 Count er wei ght s
2. 9 FREI GHT ELEVATOR HOI STWAY DOORS AND ENTRANCES
2. 9. 1 Oper at i on
2. 9. 2 Hoi st way Door s
2. 9. 3 Hoi st way Door Mechani cal Oper at i ng Component s
2. 9. 4 Hoi st way Door I nt er l ocks
2. 9. 5 Hoi st way Ent r ance Fr ames
2. 9. 6 Hoi st way Ent r ance Si l l s
2. 10 HOI STWAY EQUI PMENT
2. 10. 1 Car and Count er wei ght Gui de Rai l s and Fast eni ngs
2. 10. 2 Pi t Equi pment
2. 10. 3 Buf f er s
2. 10. 4 Pi t " STOP" Swi t ch
2. 10. 5 Tr avel i ng Cabl es
2. 10. 6 Hoi st way Pi t Ladder
2. 11 CLEANI NG AND PAI NTI NG
2. 11. 1 Cl eani ng
2. 11. 2 Pai nt i ng
2. 11. 3 Par t s or Sur f aces Not Pai nt ed
PART 3 EXECUTI ON
3. 1 I NSTALLATI ON
3. 1. 1 St r uct ur al Member s and Fi ni sh Mat er i al s
3. 1. 2 Mi scel l aneous Requi r ement s
3. 1. 3 Roof Access
3. 2 FI ELD QUALI TY CONTROL
3. 3 ACCEPTANCE I NSPECTI ON, TESTI NG AND COMMI SSI ONI NG
3. 3. 1 Accept ance I nspect i on Suppor t
3. 3. 2 Test i ng Mat er i al s and I nst r ument s
3. 3. 3 Fi el d Test s
3. 3. 3. 1 Endur ance Test s
3. 3. 3. 2 Speed Test s
3. 3. 3. 3 Level i ng Test s
3. 3. 3. 4 Temper at ur e Ri se Test s
3. 3. 3. 5 Bal anced Load Test
3. 3. 3. 6 Mot or Amper e Test s
3. 3. 3. 7 El evat or Per f or mance and Ri de Qual i t y Test i ng
3. 3. 3. 8 Gover nment Test I nvol vement
3. 3. 3. 9 Test Repor t s
3. 4 OPERATI ON AND MAI NTENANCE TRAI NI NG
3. 5 CLOSEOUT PROJECT
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 14 21 13 Page 3
SECTI ON 14 21 13
ELECTRI C TRACTI ON FREI GHT ELEVATORS
PART 1 GENERAL
1. 1 SCOPE
Pr ovi de mat er i al s, equi pment , l abor , har dwar e, mi scel l aneous i t ems and ser vi ces necessar y f or t he compl et e and saf e moder ni zat i on of one ( 1) exi st i ng f r ei ght el evat or at Dal e Hol l ow Power pl ant . Unl ess ot her wi se not ed i n par agr aph " Ret ai ned Equi pment " , al l par t s of cur r ent el evat or syst em shal l be r emoved and r epl aced compl et el y.
Any i t ems not speci f i ed i n det ai l s by t he Cont r act / Speci f i cat i on but whi ch ar e i nci dent al t o or necessar y f or t he compl et e i nst al l at i on and pr oper oper at i on of t he wor k descr i bed her ei n or r easonabl y i mpl i ed, shal l be f ur ni shed as i f cal l ed f or i n det ai l s by t he Cont r act / Speci f i cat i on.
Bi dder s must r epor t di scr epanci es or ambi gui t i es occur r i ng i n t he Cont r act / Speci f i cat i on pr i or t o t he submi ssi on of t he bi d pr oposal .
Submi ssi on of t he bi d wi t hout c l ar i f i cat i on wi l l r ef l ect accept ance of t he Cont r act / Speci f i cat i on as wr i t t en. Fai l ur e t o ver i f y t he power suppl y, exi st i ng condi t i on and equi pment shal l not r el i eve t he cont r act or f r om r esponsi bi l i t y f or t he sat i sf act or y oper at i on of t he equi pment .
Bi dder s wi l l have t o i ncl ude t he cost f or any necessar y el ect r i cal modi f i cat i ons f or pr oper oper at i on of t hei r equi pment .
New equi pment shal l be made of cor r osi on- r esi st ant mat er i al s ( gal vani zed, st ai nl ess st eel ) or pai nt ed f or cor r osi on pr ot ect i on.
1. 1. 1 El ect r i cal Equi pment
Bi dder s wi l l have t o i ncl ude t he cost f or any necessar y el ect r i cal modi f i cat i ons f or pr oper oper at i on of t he el evat or equi pment . For r equi r ement s of t he el ect r i cal equi pment , see Sect i on 26 20 00 - I NTERI OR
DI STRI BUTI ON SYSTEM.
1. 1. 2 Asbest os Abat ement
See Sect i on 02 82 14 - ASBESTOS ABATEMENT WORK f or r equi r ement s.
1. 1. 3 Lead Pai nt Abat ement
Lead pai nt abat ement i s not r equi r ed f or t hi s pr oj ect . See Sect i on 01 95 00
- FORMS AND ATTACHMENTS f or t he l ead pai nt anal ysi s r epor t .
1. 2 NEW EQUI PMENT
Unl ess ot her wi se i ndi cat ed i n par agr aph " Ret ai ni ng Equi pment " , Cont r act or shal l pr ovi de new equi pment , whet her or not speci f i cal l y ment i oned i n t he speci f i cat i ons, i n or der t o pr ovi de one ( 1) compl et e el evat or uni t . For el ect r i cal equi pment r equi r ement s, see Sect i on 26 20 00 I NTERI OR
DI STRI BUTI ON SYSTEM.
SECTI ON 14 21 13 Page 4
1. 3 RETAI NI NG EQUI PMENT
Al l r et ai ni ng equi pment i s t o be r econdi t i oned t o oper at e pr oper l y, saf el y and r el i abl y, i n accor dance wi t h t hese speci f i cat i ons, or i f not speci f i ed her ei n, wi t h or i gi nal manuf act ur er speci f i cat i ons. Recondi t i oni ng may i ncl ude, but i s not l i mi t ed t o, i nspect i on, t est i ng, c l eani ng, l ubr i cat i ng, r epai r , r ebui l di ng, r e- i nsul at i ng, bal anci ng, r eal i gnment , pai nt i ng and/ or adj ust i ng. Fast eni ngs and har dwar e ar e t o be checked, pr oper l y t i ght ened, and r epl aced as r equi r ed. Cost t o r econdi t i on / modi f y t he equi pment i s t o be i ncl uded i n t he base bi d pr oposal .
Unl ess ot her wi se not ed, t he f ol l owi ng equi pment shal l be r et ai ned:
a. Hoi st way door s, hoi st way ent r ance f r ames and hoi st way ent r ance si l l s .
b. Pi t r ai l - t o- r ai l channel s.
c. Pi t l adder .
d. T- r ai l s f or car and count er wei ght . Mai n and count er wei ght r ai l s shal l be r eal i gned and pai nt ed. Gui de r ai l s shal l be r eal i gned pl umb and par al l el wi t h a maxi mum devi at i on of 1/ 16 i nch. New el evat or car and count er wei ght shal l be f abr i cat ed t o wor k wi t h t he exi st i ng r ai l s and ot her r et ai ni ng equi pment .
e. Count er wei ght . Adj ust t he count er wei ght f i l l er s as needed t o wor k wi t h t he new el evat or car .
1. 4 NON- PROPRI ETARY EQUI PMENT
Equi pment and component par t s i nst al l ed, suppl i ed or pr ovi ded under t hi s cont r act shal l be manuf act ur er ' s non- pr opr i et ar y equi pment . Equi pment and component syst ems shal l not hamper and/ or ot her wi se pr ohi bi t subsequent mai nt enance, r epai r s or adj ust ment s by al l qual i f i ed cont r act or s.
Pr i or t o f i nal accept ance of t he compl et ed el evat or syst em, al l t ool s, pr ogr ammer s, CRT wi t h keyboar d, hand hel d or l ap t op comput er , sof t war e et c. , necessar y t o mai nt ai n, ser vi ce and/ or t r oubl e shoot t he el evat or syst em shal l be f ur ni shed by t he Cont r act or . Any such t ool s / pr ogr am shal l become t he pr oper t y of t he Cor ps of Engi neer s, Nashvi l l e Di st r i ct .
I nst r uct i onal manual s, compl et e set s of wi r i ng di agr ams, oper at i ng gui des, cont r ol l er f aul t codes, and a copy of t he Subscr i ber I dent i f y modul e ( SI M) car d, et c. , and t r ai ni ng i n t he oper at i on of t hese t ool s, pr ogr ammer s, et c. , shal l be pr ovi ded t o t he Cor ps of Engi neer s, Nashvi l l e District.
The manuf act ur er of t he Non- pr opr i et ar y el evat or syst em must pr ovi de t echni cal suppor t .
1. 5 " FOR I NFORMATI ON ONLY" DRAWI NGS AND ATTACHMENTS
Al l exi st i ng " f or i nf or mat i on onl y" dr awi ngs, " r ef er ence" dr awi ngs and at t ached f or ms ( Sect i on 01 95 00 FORMS AND ATTACHMENTS i ncl uded i n t he set of cont r act dr awi ngs and cont r act speci f i cat i ons ar e pr ovi ded " FOR I NFORMATI ON ONLY" . The Gover nment cannot guar ant ee t hat t he i nf or mat i on on t he dr awi ngs and f or ms i s up- t o- dat e. I t i s t he Cont r act or ' s r esponsi bi l i t y t o ver i f y al l i nf or mat i on and di mensi ons as needed wi t h a s i t e i nspect i on t o make sur e t hat new equi pment wi l l be compat i bl e wi t h
SECTI ON 14 21 13 Page 5 t he exi st i ng equi pment and st r uct ur e.
1. 6 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN WELDI NG SOCI ETY ( AWS)
AWS D1. 1/ D1. 1M ( 2015; Er r at a 1 2015; Er r at a 2 2016) St r uct ur al Wel di ng Code - St eel
ASME I NTERNATI ONAL ( ASME)
ASME A17. 1/ CSA B44 ( 2016) Saf et y Code f or El evat or s and Escalators
ASME A17. 2 ( 2015) Gui de f or I nspect i on of El evat or s, Escal at or s, and Movi ng Wal ks I ncl udes I nspect i on Pr ocedur es f or El ect r i c Tr act i on and Wi ndi ng Dr um El evat or s, Hydr aul i c El evat or s, and Escal at or s and Movi ng Wal ks
ASME A17. 5 ( 2014) El evat or and Escal at or El ect r i cal Equi pment - I ncor por at es Er r at a: 10/ 2014
I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)
I EEE C62. 41 ( 1991; R 1995) Recommended Pr act i ce on Sur ge Vol t ages i n Low- Vol t age AC Power Circuits
I NTERNATI ONAL CODE COUNCI L ( I CC)
I CC I BC ( 2018) I nt er nat i onal Bui l di ng Code
NATI ONAL ELEVATOR I NDUSTRY, I NC. ( NEI I )
NEII-1 ( 2000; R t hr u 2017) Bui l di ng Tr anspor t at i on St andar ds and Gui del i nes, i ncl udi ng t he Per f or mance St andar ds Mat r i x f or New El evat or I nst al l at i on
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 101 ( 2018; TI A 18- 1) Li f e Saf et y Code
NFPA 70 ( 2017; ERTA 1- 2 2017; TI A 17- 1; TI A 17- 2;
TI A 17- 3; TI A 17- 4; TI A 17- 5; TI A 17- 6;
TI A 17- 7; TI A 17- 8; TI A 17- 9; TI A 17- 10;
TI A 17- 11; TI A 17- 12; TI A 17- 13; TI A
17- 14) Nat i onal El ect r i cal Code
NFPA 70E ( 2018; TI A 18- 1; TI A 81- 2) St andar d f or El ect r i cal Saf et y i n t he Wor kpl ace
NFPA 72 ( 2016) Nat i onal Fi r e Al ar m and Si gnal i ng
SECTI ON 14 21 13 Page 6
Code
SOCI ETY FOR PROTECTI VE COATI NGS ( SSPC)
SSPC 7/ NACE No. 4 ( 2007; E 2004) Br ush- Of f Bl ast Cl eani ng
SSPC SP 2 ( 1982; E 2000; E 2004) Hand Tool Cl eani ng
SSPC SP 3 ( 1982; E 2004) Power Tool Cl eani ng
U. S. DEPARTMENT OF DEFENSE ( DOD)
UFC 3- 560- 01 ( 2017) Oper at i ons and Mai nt enance:
El ect r i cal Saf et y
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
36 CFR 1191 Amer i cans wi t h Di sabi l i t i es Act ( ADA) Accessi bi l i t y Gui del i nes f or Bui l di ngs and Faci l i t i es; Ar chi t ect ur al Bar r i er s Act ( ABA) Accessi bi l i t y Gui del i nes
1. 7 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Roof Access; G
SD- 02 Shop Dr awi ngs
El evat or Syst em; G, ECD-E
El evat or Component s; G, ECD- E
Machi ne and El evat or Cont r ol l er ; G, ECD- D
Wi r i ng Di agr ams; G, ECD- E
Repl acement Equi pment ; G, ECD- E
SD- 03 Pr oduct Dat a
El evat or and Accessor i es; G, ECD- E
El evat or Component pr oduct dat a; G, ECD- E
El evat or Mi cr opr ocessor Cont r ol l er ; G, ECD- E
Hoi st way Door s; G, PMP & ECD- E
SD- 05 Desi gn Dat a
Emer gency Power Syst ems; G, ECD- E
SD- 06 Test Repor t s
SECTI ON 14 21 13 Page 7
El evat or Accept ance I nspect i on For m; G, ECD- E
Wr i t t en Test Dat a; G, ECD- E
Fi nal Test Repor t s ; G, ECD- E
Test Pl ans; G, ECD- E
SD- 07 Cer t i f i cat es
El evat or Par t s and Component s Pr i ce Li st s; G
Warranty
Endor sement Let t er
Wel der s ' Qual i f i cat i ons
El evat or Cont r ol l er Cer t i f i cat i on; G
Qual i f i ed El evat or I nspect or ; G
Qei Cer t i f i cat i on; S
Wr i t t en Cer t i f i cat i on; G
Fi nal Cer t i f i cat i on; G
SD- 10 Oper at i on and Mai nt enance Dat a
El evat or , Dat a Package 4; G, ECD- E
Tr ai ni ng Pl an; G
Oper at i on & Mai nt enance Cont r ol Pr ogr am ( MCP) ; G, ECD- E
Oper at i on And Mai nt enance Manual s; G, ECD- E
Sof t war e and Document at i on; G, ECD- E
Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND
MAI NTENANCE DATA
SD- 11 Cl oseout Submi t t al s
As- Bui l t Dr awi ngs; G
1. 7. 1 Shop Dr awi ng Requi r ement s
Pr ovi de assembl y and ar r angement of el evat or s, accessor i es, and el evat or component s. Show l ocat i on of machi ne and el evat or cont r ol l er i n el evat or machi ne r oom. Pr ovi de det ai l s f or mat er i al s and equi pment , i ncl udi ng but not l i mi t ed t o oper at i ng and si gnal f i x t ur es, door s, door and car f r ames, car encl osur e, cont r ol l er s, mot or s, gui de r ai l s and br acket s, l ayout of hoi st way i n pl an and el evat i on, and ot her l ayout i nf or mat i on and cl ear ance dimensions.
SECTI ON 14 21 13 Page 8
1. 7. 2 Pr oduct Dat a Requi r ement s
Pr ovi de manuf act ur er s ' pr oduct dat a f or al l el evat or component pr oduct dat a, i ncl udi ng but not l i mi t ed t o t he f ol l owi ng: el evat or cont r ol l er , hoi st machi ne and dr i ve mot or , r ope gr i pper , r ai l s , desi gn count er bal ance, hoi st r opes and shackl es, over speed gover nor , emer gency br aki ng syst em, car and hal l f i x t ur e but t ons and swi t ches, cab and machi ne r oom communi cat i on devi ces, door oper at or , door pr ot ect i on syst em, and car and count er wei ght r ol l er gui des and buf f er s. For dat a sheet s, pr ovi de document i dent i f i cat i on number or bul l et i n number , publ i shed or copyr i ght ed pr i or t o t he dat e of cont r act bi d openi ng. Pr ovi de cont r ol l er manuf act ur er ' s publ i shed pr ocedur es f or per f or mance of each and al l t est i ng r equi r ed by
ASME A17. 1/ CSA B44.
1. 7. 3 Desi gn Dat a
1. 7. 4 Wel der s ' Requi r ement s
Compl y wi t h AWS D1. 1/ D1. 1M, Sect i on 5. I ncl ude cer t i f i ed copi es of f i el d wel der s ' qual i f i cat i ons. Li st wel der s ' names wi t h cor r espondi ng code mar ks t o i dent i f y each wel der ' s wel di ng wor k
1. 7. 5 Oper at i on & Mai nt enance Cont r ol Pr ogr am ( MCP)
The Cont r act or shal l f ur ni sh t he Cont r act i ng Of f i ce a wr i t t en and el ect r oni c copy of oper at i ng i nst r uct i ons out l i ni ng t he st ep- by- st ep pr ocedur e f or syst em st ar t up, oper at i on, and shut down. The i nst r uct i ons shal l i ncl ude t he manuf act ur er ' s name, model number , ser vi ce manual par t s l i s t , and br i ef descr i pt i on of al l equi pment and t hei r basi c oper at i ng f eat ur es. Oper at i ng i nst r uct i ons shal l be submi t t ed and appr oved pr i or t o t r ai ni ng cour se.
The Cont r act or shal l pr epar e and pr ovi de a wr i t t en Mai nt enance Cont r ol Pr ogr am ( MCP) t hat compl i es wi t h ASME A17. 1/ CSA B44 Sect i on 8. 6, i ncl udi ng wr i t t en document at i on t hat det ai l s t he t est pr ocedur es f or each and ever y t est t hat i s r equi r ed t o be per f or med by ASME A17. 1/ CSA B44. Assembl e al l MCP document at i on, and suppor t i ng t echni cal at t achment s, i n a s i ngl e MCP package and pr ovi de i n bot h el ect r oni c and har d copy. Assembl e ent i r e har d copy MCP i n 3- r i ng bi nder s. Pr ovi ded, t he MCP must i ncl ude onl y document at i on and i nst r uct i on t hat appl y t o t he el evat or speci f i ed.
Pr ovi de an addi t i onal , separ at e bi nder t hat i ncl udes al l mai nt enance, r epai r , r epl acement , cal l back, and ot her r ecor ds r equi r ed by ASME A17. 1/ CSA B44. The r ecor ds bi nder must be kept i n t he el evat or mechani cal r oom, mai nt ai ned by el evat or mai nt enance and ser vi ce per sonnel , and be avai l abl e at al l t i mes t o aut hor i zed per sonnel .
Pr ovi de det ai l ed i nf or mat i on r egar di ng emer gency ser vi ce pr ocedur es and el evat or i nst al l at i on company per sonnel cont act i nf or mat i on. Pr ovi de a l i s t i ng of al l t ool s t o be pr ovi ded t o t he Cont r act i ng Of f i cer as component s of t he el evat or syst em.
1. 8 QUALI TY ASSURANCE
1. 8. 1 Qualification
Pr ovi de a desi gned and engi neer ed el evat or syst em by an el evat or cont r act or r egul ar l y engaged i n t he i nst al l at i on of el evat or syst ems.
Pr ovi de el evat or component s manuf act ur ed by compani es r egul ar l y engaged i n
SECTI ON 14 21 13 Page 9 t he manuf act ur e of el evat or component s. Ut i l i ze onl y l i censed and cer t i f i ed el evat or per sonnel f or t he i nst al l at i on, adj ust i ng, t est i ng, and ser vi c i ng of t he el evat or s.
1. 8. 1. 1 El evat or Cont r act or ' s El evat or Techni c i ans
For el evat or i nst al l at i ons i n t he Uni t ed St at es, i ncl udi ng Uni t ed St at es t er r i t or i es, per f or m al l el evat or r el at ed wor k under t he di r ect gui dance of a st at e cer t i f i ed el evat or t echni c i an wi t h a mi ni mum of t hr ee year s of exper i ence i n t he i nst al l at i on of el evat or syst ems of t he t ype and compl exi t y speci f i ed i n t he cont r act document s. Pr ovi de an endor sement l et t er f r om t he el evat or manuf act ur er , cer t i f y i ng t hat t he el evat or speci al i st i s qual i f i ed. Al l el evat or t echni c i ans must car r y a cur r ent cer t i f i cat i on i ssued by one of t he f ol l owi ng or gani zat i ons:
a. Nat i onal Associ at i on of El evat or Cont r act or s ( NAEC)
b. Nat i onal El evat or I ndust r y Educat i on Pr ogr am ( NEI EP)
1. 8. 2 Manuf act ur er s ' Techni cal Suppor t
Pr ovi de el evat or component s f r om manuf act ur er s t hat pr ovi de f act or y t r ai ni ng and onl i ne and l i ve t el ephone el evat or t echni cal suppor t t o any el evat or i nst al l at i on, ser vi ce, and mai nt enance cont r act or . Pr ovi de el evat or component s f r om manuf act ur er s t hat guar ant ee accessi bi l i t y t o al l r epl acement and r epai r par t s and component s t o any el evat or i nst al l at i on, ser vi ce, and mai nt enance cont r act or . Use onl y el evat or component manuf act ur er s t hat pr ovi de cur r ent publ i shed pr i ce l i s t s f or al l el evat or par t s and component s.
1. 8. 3 Oper at i on and Mai nt enance Dat a
Assembl e al l shop dr awi ng and pr oduct dat a mat er i al i nt o O&M Dat a Packages i n accor dance wi t h Ar t i c l e SUBMI TTALS. Pr ovi de t wo compl et e O&M Dat a Packages i n har d copy and a compl et e el ect r oni c O&M dat a packages i n PDF f or mat . Pr ovi de al l O&M Dat a Packages t o Cont r act i ng Of f i cer . I ncl ude cont r ol l er di agnost i c document at i on and sof t war e as r equi r ed under Ar t i c l e
CONTROL EQUI PMENT.
1. 8. 4 Wi r i ng Di agr ams
Pr ovi de compl et e wi r i ng di agr ams and sequence of oper at i ons, whi ch show el ect r i cal connect i ons and f unct i ons of el evat or syst ems. Pr ovi de one set 11 i nch by 17 i nch mi ni mum si ze of wi r i ng di agr ams, wi t h i ndi v i dual sheet s l ami nat ed i n pl ast i c and assembl ed i n bi nder , t o be st or ed i n t he machi ne r oom cabi net . Pr ovi de one addi t i onal har d copy set and a compl et e el ect r oni c set s i n PDF f or mat . Pr ovi de al l wi r i ng di agr am set s t o t he Cont r act i ng Of f i cer . Coded di agr ams ar e not accept abl e unl ess f ul l y identified.
1. 8. 5 Machi ne Room Cabi net
For st or age of O&M Dat a Packages and Wi r i ng Di agr ams, pr ovi de l ocki ng met al cabi net wi t h a mi ni mum si ze of 20 i nch W by 12 i nch D by 30 i nch H.
Cabi net must be si zed l ar ge enough t o accommodat e al l O&M Dat a and har dwar e r equi r ed i n par agr aphs OPERATI ON AND MAI NTENANCE DATA and WI RI NG DI AGRAMS. Secur e cabi net t o machi ne r oom wal l .
SECTI ON 14 21 13 Page 10
1. 9 NEW I NSTALLATI ON SERVI CE
Pr ovi de el evat or war r ant y ser vi ce i n accor dance wi t h t he manuf act ur er ' s mai nt enance pl an, war r ant y r equi r ement s and appl i cabl e saf et y codes, f or a per i od of 12 mont hs af t er t he dat e of accept ance by Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) . Per f or m t hi s wor k dur i ng r egul ar wor ki ng hour s.
Pr ovi de suppl i es and par t s t o keep el evat or syst em i n oper at i on. Per f or m ser vi ce onl y by f act or y t r ai ned per sonnel . Pr ovi de mont hl y ser vi ces t o i ncl ude r epai r s, adj ust ment s, gr easi ng, oi l i ng, and cl eani ng. Pr ovi de ser vi ce l og i n el evat or machi ne r oom and updat e mont hl y, t hr oughout t he one- year war r ant y per i od.
Pr ovi de 24- hour emer gency ser vi ce, wi t h t wo hour on- si t e r esponse t i me, dur i ng t hi s per i od wi t hout addi t i onal cost t o t he Gover nment .
1. 9. 1 Adjustments
Af t er i nst al l at i on i s subst ant i al l y compl et e, al l t est s i n accor dance wi t h A17. 1 ar e compl et e t he el evat or i s i n use by t he Gover nment , t he Cont r act or shal l pr ovi de a 30- day per i od f or adj ust ment s t o achi eve pr oper oper at i on. Adj ust i ng shal l be i n accor dance wi t h t he appl i cabl e pr ovi s i on of ASME A17. 1. Adj ust ment s of t he i nst al l at i on by compet ent and t r ai ned el evat or mechani cs shal l be per f or med dur i ng t he r egul ar wor ki ng hour s of r egul ar wor ki ng days and shal l i ncl ude adj ust i ng, l ubr i cat i ng and cl eani ng of equi pment , and f ur ni shi ng r equi r ed suppl i es and par t s except such par t s made necessar y by mi suse, acci dent or negl i gence not caused by t he contractor.
1. 10 FI RE PROTECTI ON SYSTEM
Coor di nat e i nt er f ace bet ween t he new Ten Zone Fi r e pr ot ect i on syst em and el evat or cont r ol s.
Fi r e pr ot ect i on syst em shal l compl y wi t h t he appl i cabl e pr ovi s i ons of NFPA 72, NFPA 101, and ASME A17. 1/ CSA B44. Ver i f y t hat pr oper connect i ons exi st f or f i r e r ecal l devi ces t o t he el evat or cont r ol l er s. I f r equi r ed, pr ovi de connect i on f r om new or exi st i ng f i r e r ecal l devi ces t o t he el evat or cont r ol l er s i n machi ne r oom.
1. 10. 1 Fi r e Al ar m I ni t i at i ng Devi ces
Cont r act or shal l i nst al l new f i r e al ar m i ni t i at i ng devi ces as needed t o meet al l appl i cabl e saf et y codes and ASME A17. 1/ CSA B44.
1. 10. 2 Fi r e Spr i nkl er s
Ther e ar e no f i r e spr i nkl er s f or t he exi st i ng el evat or . Fi r e spr i nkl er s shal l not be i ncl uded i n t he scope of wor k f or Dal e Hol l ow el evat or r ehab.
1. 11 DELI VERY, STORAGE, AND HANDLI NG
Pr ot ect mat er i al and equi pment i n accor dance wi t h t he manuf act ur er ' s r ecommended st or age pr ocedur es, bef or e, dur i ng, and af t er i nst al l at i on.
The cont r act or shal l be r esponsi bl e f or r ecei v i ng, st or i ng, and secur i ng of al l mat er i al s, equi pment and ot her i t ems t o be used i n accompl i shi ng t he wor k. The cont r act or shal l be r esponsi bl e f or al l equi pment and mat er i al s br ought ont o t he Dal e Hol l ow Pr oj ect and shal l r epl ace damaged or st ol en i t ems at hi s or her expense. Pr oj ect l ocat i on i s at :
SECTI ON 14 21 13 Page 11
Dal e Hol l ow Power pl ant 305 Power house Road Cel i na, TN 38551
Poi nt of Cont act : St anl ey R. Car t er , Jr .
emai l : st anl ey. r . car t er . j r @usace. ar my. mi l Phone: 931- 243- 3135
1. 12 WORKI NG HOURS
Wor ki ng hour s ar e 0630- 1630 Cent r al Ti me, Monday t hr u Thur sday, except Feder al Hol i days. Cont r act or shal l coor di nat e hi s or her wor k wi t h ot her Cont r act or s and power pl ant super i nt endent t o avoi d i nt er f er ence / di sr upt i on of t hei r wor k.
PART 2 PRODUCTS
2. 1 ELEVATOR DESCRI PTI ON
Pr ovi de el evat or syst em t hat compl i es wi t h ASME A17. 1/ CSA B44 i n i t s entirety, ASME A17. 2 i n i t s ent i r et y, and addi t i onal r equi r ement s speci f i ed her ei n. Pr ovi de el evat or syst em t hat meet s or exceeds t he NEII-1 Ri de Qual i t y Per f or mance St andar ds Mat r i x ( RQPSM) . For el evat or speeds of 500 f pm and hi gher , compl y wi t h t he RQPSM " Hi gh Per f or mance" cr i t er i a.
Exi st i ng El evat or Char act er i st i cs ar e pr ovi ded f or r ef er ence and shal l need t o be ver i f i ed i n t he f i el d by t he cont r act or . New el evat or shal l meet r equi r ement s i n par agr aph " el evat or desi gn par amet er s" .
Capaci t y: 5000 l bs / 25 per sons Tot al Wei ght : 11, 490 l bs Dr i ve Mot or : 15 hp, AC, 1100 r pm Tr avel Speed: 100 f pm Over Speed Tr i p: To be ver i f i ed i n f i el d ( f pm) Dr i ve Sheave: Tr act i on Type Cabl es: Quant i t y- 6 5/ 8"
Desi gn and f abr i cat i on of t he new car , cont r ol syst em, and i t s component s shal l have si mi l ar char act er i st i cs of t he exi st i ng el evat or syst em. The new el evat or syst em shal l have t he capaci t y t o l i f t a l oad, excl usi ve of t he car and cabl e at a speed as speci f i ed i n t he f ol l owi ng schedul e. The el evat or shal l r et ai n t he appr oxi mat e t r avel , t er mi nal f l oor s, number of st ops and openi ngs as shown i n t he schedul e. The el evat or shal l ser ve t he f l oor s wi t h st ops and openi ngs i n accor dance wi t h t he r equi r ement s indicated.
Pr ovi de and i nst al l el evat or s i n accor dance wi t h 36 CFR 1191 - ABAAS, I CC I BC, I EEE C62. 41, NFPA 70 and NFPA 101 r equi r ement s.
2. 1. 1 El evat or Desi gn Par amet er s
a. Type: Gear ed
b. Rat ed l oad: 5, 000 l b.
c. Rat ed Speed: 100 f pm ( f eet per mi nut e) wi t h t he over speed t r i p of 175 f pm. Mai nt enance speed i s 50 f pm.
d. Tr avel Lengt h: El evat i on 524. 5 t o El evat i on 567. 0
SECTI ON 14 21 13 Page 12
e. Number of St ops: 4 l andi ngs, 4 openi ngs.
f . Number of Hoi st Way Openi ngs: 4.
g. Car I nsi de Di mensi ons: New car shal l have t he same di mensi ons as t he exi st i ng one. Est i mat e di mensi ons of t he exi st i ng car : 94" D x 116" W x 96" H. Cont r act or shal l ver i f y di mensi on i n t he f i el d pr i or t o submi t t i ng t he bi d.
h. Hoi st way Door Type & Si ze: Power oper at ed, Ver t i cal Bi - Par t i ng count er bal ance t ype.
i . Car Gat e Type: Power oper at ed, Ver t i cal Ri s i ng j . Loadi ng Type: ASME A17. 1/ CSA B44, Cl ass C2
k. Al l hoi st way door cont r ol and el evat or cont r ol shal l be compat i bl e wi t h each ot her .
2. 1. 2 Cab Encl osur e and Hoi st way Ent r ance Assembl i es
Cab ( car ) and i t s accessor i es shal l be r epl aced by t he cont r act or . The new car shal l be suppl i ed wi t h al l equi pment , cont r ol s, saf et y i nt er l ocks, sensor s, cont act s, and pr ot ect i ve devi ces r equi r ed by ASME A17. 1/ CSA B44.
2. 1. 2. 1 Car Fr ame
A sui t abl e car f r ame f abr i cat ed f r om f or med or st r uct ur al st eel member s shal l be pr ovi ded wi t h adequat e br aci ng t o suppor t t he pl at f or m and car encl osur e. Buf f er s as speci f i ed by code t o st op car . Gui des shal l be mount ed on t op and bot t om of t he car f r ame t o engage t he gui de r ai l s.
2. 1. 2. 2 Fl oor Pl at f or m
The car pl at f or m shal l be of st eel const r uct i on wi t h a f i r e r at ed pl ywood subf l oor i ng and st eel pl at e f l oor wi t h ant i - ski d pai nt . I ndi cat e t he t ype of pai nt t hat wi l l be usi ng and submi t pai nt pr oduct dat a f or appr oval .
Pr ovi de st eel , code compl i ant , t oe guar d. Di agonal br aces f r om t oe guar d bot t om t o pl at f or m st r i nger s.
2. 1. 2. 3 Walls
Pr ef i ni shed st eel panel s or pr ef i ni shed st eel .
2. 1. 2. 4 Car Gat e
The car gat e shal l be a ver t i cal s l i di ng gat e, wi t h cont r ol s f or power openi ng and cl osi ng. The gat e shal l open and cl ose at a speed of not l ess t han 1 f oot per second. The car gat e oper at or s shal l be ar r anged t o per mi t openi ng f r om wi t hi n t he car i n t he event of a power f ai l ur e. A s i ngl e oper at or mot or shal l be pr ovi ded f or t he car gat e. The gat e shal l be pr ovi ded wi t h al l saf et y cont act s and ot her i nt er l ocks needed f or conf or mance t o ASME A17. 1/ CSA B44. The l ower edge of t he gat e panel shal l be pr ovi ded wi t h a saf et y edge t o st op t he downwar d mot i on of t he gat e when i t encount er s an obst r uct i on. Al l poi nt s of l ubr i cat i on shal l be r eadi l y accessi bl e. See Par agr aph Hoi st way Door s and Car Gat e Oper at i on and Sequenci ng.
SECTI ON 14 21 13 Page 13
2. 1. 2. 5 Per f or at ed Met al Top
Use per f or at ed met al car t op wi t h t he angl e f r ame and access door as t he exi st i ng desi gn. LED Li ght s shal l be r ecessed and have pr ot ect i ve cover t o pr event t hem f r om bei ng damaged by equi pment movi ng i n and out of el evat or .
2. 1. 2. 6 Car I nspect i on St at i on
Car i nspect i on st at i on shal l be wi t hi n t he car .
2. 1. 2. 7 Top of Car Handr ai l
Top of Car Handr ai l shal l meet st andar d r equi r ement s.
2. 1. 2. 8 El evat or Posi t i on Sensor
A posi t i on sel ect or shal l be par t of t he mi cr opr ocessor . I t shal l pr ovi de posi t i ve means of det er mi ni ng t he posi t i on of t he el evat or i n t he hoi st way at al l t i mes. A di gi t al encoder shal l be pr ovi ded on t he gover nor . Anal og syst ems ut i l i z i ng per f or at ed st eel t apes ar e not per mi t t ed. The encoder uni t mount ed on t he gover nor shal l be capabl e of pr ovi di ng a s i gnal as t o t he posi t i on of t he car i n t he hoi st way. Fl oor l ocat i on f or l evel i ng shal l be det er mi ned vi a magnet i c st r i ps af f i xed t o t he br acket s or t apes t o def i ne t he f l oor - l evel i ng zone. The posi t i on sel ect or shal l pr ovi de 1/ 8" r esol ut i on accur acy f or t he ent i r e l engt h of t he hoi st way. The shaf t encoder shal l pr ovi de i nput s i gnal s t o t he cont r ol l ocat i ng t he exact posi t i on of t he el evat or wi t hi n 3/ 16 i nches.
2. 1. 2. 9 Hoi st way ( Fr ei ght ) Door s, Fr ame and Accessor i es
2. 1. 2. 9. 1 Hoi st way Door s and Fr ame
Power - oper at ed hoi st way door s and f r ame shal l be r ef ur bi shed by t he cont r act or . Exi st i ng hoi st way ent r ances ar e power oper at ed, ver t i cal , bi - par t i ng count er bal anced door s, and r egul ar t ype.
2. 1. 2. 9. 2 Hoi st way Door Accessor i es
Al l hoi st way door oper at i ng mechani sms and accessor i es shal l be r epl aced by t he cont r act or . Thi s i ncl udes mot or oper at i ng uni t s and mot or s, spr i ngs, spr ocket sheave uni t s, i dl er spr ocket s, r ol l er chai ns, doubl e act i ng oi l check, condui t s, zone cont r ol r ol l er assembl y, i dl er pul l ey, pi ni on, r et i r i ng cam uni t s and mot or s, ai r check, r ack, and any ot her equi pment , i nt er l ocks, or sensor s r equi r ed by ASME A17. 1/ CSA B44.
Exi st i ng hoi st way door s shal l be r et ai ned. Hoi st way door oper at or s shal l be ar r anged t o per mi t openi ng f r om wi t hi n t he car i n t he event of a power f ai l ur e. Al l poi nt s of l ubr i cat i on shal l be r eadi l y accessi bl e.
2. 1. 2. 9. 3 Hoi st way Door s and Car Gat e Oper at i on and Sequenci ng
The hoi st way door s and car gat e shal l open aut omat i cal l y when t he el evat or car ar r i ves at a l andi ng. The oper at i on shal l be semi - sel ect i ve. The cl osi ng of t he door s and gat e i n sequence oper at i on shal l be obt ai ned by const ant pr essur e on t he " DOOR CLOSE" but t on i n t he car oper at i ng panel or hal l but t on st at i on. Rel easi ng t he pr essur e of t he but t on shal l st op t he cl osi ng movement of t he door s and gat e. Moment ar y pr essur e of t he " DOOR OPEN" but t on shal l r eopen t he door s and gat e. Moment ar y pr essur e on t he " DOOR STOP" but t on shal l st op t he door and gat e t r avel . The door s and
SECTI ON 14 21 13 Page 14 gat e shal l accel er at e and decel er at e smoot hl y, and shal l be checked i n bot h t he openi ng and cl osi ng mot i ons. Al l power oper at ed door s shal l be equi pped wi t h aut omat i c c l oser s. The door s shal l c l ose aut omat i cal l y af t er an adj ust abl e t i me del ay ( 0 t o 300 seconds) has expi r ed, or by cont i nuous pr essur e on t he " DOOR CLOSE" but t on. The door open t i me del ay wi l l be aut omat i cal l y r eset by ei t her moment ar y pr essur e of t he " DOOR OPEN" but t on or by act i vat i on of t he car gat e saf et y edge. Cont r act or needs t o make sur e t hat new new door cont r ol syst em shal l be compat i bl e wi t h t he new el evat or cont r ol syst em, so t hat t hey can communi cat e wi t h one anot her .
2. 1. 3 Governor
Al l gover nor s shal l be manuf act ur ed by Hol l i s t er Whi t ney and shal l be capabl e of t r i ppi ng i n bot h t he “ UP” and “ DOWN” di r ect i ons of t r avel . The gover nor wi l l be equi pped wi t h r ope gr i p j aws desi gned t o c l amp t he gover nor r ope so as t o act uat e t he car saf et y upon a pr edet er mi ned over speed. Rope gr i p j aws whi ch f l oat wi t h gover nor movement wi l l not be per mi t t ed. The gover nor wi l l be set at 175 f eet per mi nut e. The r ope gr i p j aws must be posi t i vel y t r i pped wi t hi n t he per mi t t ed r ange of speed. The gover nor r ope- t r i ppi ng devi ce wi l l be so desi gned t hat no appr eci abl e damage t o or def or mat i on of t he gover nor r ope wi l l r esul t f r om t he st oppi ng act i on of t he devi ce i n oper at i ng t he car saf et y. Met al guar ds shal l be pr ovi ded t o pr ot ect t he gover nor r ope, gear s, and r ope gr i ppi ng devi ce f r om acci dent al f oul i ng by mai nt enance per sonnel . The gover nor wi l l be accur at el y adj ust ed and seal ed wi t h t r i ppi ng speed speci f i ed. Dat e t ags i ndi cat i ng t he t est dat e wi l l be appl i ed.
Cur r ent : Dover Cor por at i on Type 6212C, Car speed 100 f pm, 3/ 8" cabl es, dog gr i pper s 140 f pm ( f or i nf or mat i on onl y) . New equi pment t o be Hol l i s t er Whi t ney Over speed Gover nor model 207 or Gover nment appr oved equal . Equi pment at a mi ni mum must suppor t a t r avel speed of 100 f pm, l oad capaci t y of 5000 l bs, and 3/ 8" r ope.
Swi t ches: The oper at i on of t he gover nor on over - speed shal l open a swi t ch di sconnect i ng t he power f r om t he el evat or bef or e a saf et y mechani sm has t r i pped. A second swi t ch shal l be pr ovi ded t o r educe t he speed of t he el evat or pr i or t o t he oper at i on of t he di sconnect swi t ch.
The gover nor over speed swi t ches wi l l conf or m t o ASME A17. 1/ CSA B44 and be so l ocat ed and encl osed t hat excess l ubr i cant wi l l not ent er t he swi t ch encl osur e. Upon act i vat i on of t he saf et y swi t ch, t he swi t ch wi l l r emai n i n t he open posi t i on unt i l manual l y r eset .
Encoder : The encoder uni t mount ed on t he gover nor shal l t r ack t he pr eci se l ocat i on of t he el evat or at al l t i mes and r el ays t he i nf or mat i on back t o t he cont r ol l er .
Tensi on sheave, r opes and al l accessor i es of t he gover nor assembl y shal l al so be r epl aced.
Gover nor i s t est ed, pr eset , and seal ed at t he f act or y and comes st andar d wi t h an over speed swi t ch and r ope guar d.
2. 2 AUTOMATI C SI MPLEX SELECTI VE/ COLLECTI VE ELEVATOR OPERATI ON
Exi st i ng oper at i ng devi ces consi st of a ser i es of push but t ons i n t he car number ed t o cor r espond t o t he var i ous l andi ngs, up and down but t ons at t he i nt er medi at e l andi ngs, and a s i ngl e but t on at t he t er mi nal l andi ng. These oper at i ng devi ces shal l be r epl aced and connect ed t o t he new cont r ol
SECTI ON 14 21 13 Page 15 syst em whi ch shal l gover n f l oor sel ect i on, di r ect i on of t r avel and r et ar dat i on, t o suppl y t he oper at i on descr i bed her ei n.
2. 2. 1 El evat or Cal l Regi st r at i on
Car cal l s shal l be r egi st er ed by passenger s wi t hi n t he car by moment ar y pr essi ng of t he but t on cor r espondi ng t o t he f l oor s whi ch t hey wi sh t o go.
Cor r i dor cal l s shal l be r egi st er ed by t he moment ar y pr essi ng of t he but t ons i n t he cor r i dor push- but t on f i xt ur e. Once t he demand f or el evat or ser vi ce has been t he oper at i on shal l be as f ol l ows.
2. 2. 2 Operation
When t he car gat e and hoi st way door s ar e f ul l y c l osed and t he i nt er l ock c i r cui t est abl i shed, t he car shal l st ar t , accel er at e, and decel er at e aut omat i cal l y and st op at t he f i r st f l oor f or whi ch a car but t on has been r egi st er ed, or at t he f i r st cor r i dor f l oor f or a demand whi ch has been assi gned t o t he car . The car shal l st op, i n t he or der i n whi ch t he f l oor s ar e r eached by t he car , t o al l f l oor s f or whi ch cal l s have been r egi st er ed, i r r espect i ve of t he sequence i n whi ch t he but t ons have been pr essed, pr ovi ded t he but t on f or a gi ven f l oor has been pr essed suf f i c i ent l y i n advance of t he car ' s ar r i val at t hat f l oor t o per mi t t he st op t o be made. I f no car but t ons have been pr essed, and t he car st ar t s up i n r esponse t o sever al down cal l s, t he car shal l t r avel t o t he hi ghest down cal l f i r st and t hen r ever se t o col l ect ot her down cal l s. Up cal l s shal l be col l ect ed i n t he same way when t he car st ar t s down i n r esponse t o up cal l s, by f i r st st oppi ng f or t he l owest up cal l r egi st er ed. When a car has st opped i n r esponse t o t he pr essi ng of a l andi ng but t on and a car but t on i s pr essed cor r espondi ng t o t he di r ect i on i n whi ch t he car has been t r avel i ng, wi t hi n a pr edet er mi ned i nt er val of t i me af t er t he st op, t he car shal l cont i nue i n t hat di r ect i on of t he car movement shal l not af f ect t he oper at i on of t he car , but cal l s shal l r emai n r egi st er ed. Af t er t he l ast car cal l i n t he di r ect i on t he car i s t r avel i ng has been answer ed, t he car shal l aut omat i cal l y r ever se and answer r egi st er ed l andi ng cal l s an al l car cal l s i n t he or der t he l andi ngs ar e r eached. When al l cal l s have been answer ed, t he car shal l par k at t he l andi ng at el evat i on 524. 5 wi t h t he door s c l osed.
2. 2. 3 Emer gency St op Swi t ch
The emer gency st op swi t ch on t he car oper at i ng panel shal l be connect ed i n t he new cont r ol syst em. The swi t ch shal l i nt er r upt t he power suppl y and appl y t he br akes, i ndependent l y of t he r egul ar oper at i ng devi ce. The openi ng of t hi s swi t ch shal l not cancel t he r egi st er ed cal l s, af t er t hi s swi t ch i s c l osed agai n, t he car shal l cont i nue t o answer i t s var i ous cal l s.
2. 2. 4 Non- St op Swi t ch
The non- st op swi t ch on t he car oper at i ng panel shal l be connect ed i n t he new cont r ol syst em. Af t er t he car has st ar t ed, const ant pr essur e on t he non- st op swi t ch shal l per mi t t he car t o by- pass hal l cal l s.
2. 2. 5 Ser vi ce- Demand Bel l
A new ser vi ce- demand bel l shal l be pr ovi ded i n t he car and shal l sound when a l andi ng but t on i s pr essed whi l e t he door i s open.
SECTI ON 14 21 13 Page 16
2. 2. 6 Car Di spat ch
When t he car does not r ecei ve a demand di spat ch af t er i t has answer ed al l cal l s and r et ur ned t o el evat i on 524. 5 f or t he adj ust abl e t i me per i od up t o t en mi nut es, set i ni t i al l y at f i ve mi nut es, t he mot or dr i ve uni t shal l be swi t ched of f . When a demand di spat ch i s r ecei ved by t he car when i t s mot or dr i ve uni t i s swi t ched of f , i t shal l aut omat i cal l y r est ar t .
2. 2. 7 Fi r e Det ect i on Syst em
a. Fur ni sh and i nst al l Ten Zone Fi r e Al ar m Cont r ol Panel t o f aci l i t at e El evat or Recal l Funct i on.
b. Fur ni sh and I nst al l Fi r e Al ar m I nt er f ace Rel ays t o El evat or Equi pment f r om Fi r e Al ar m Cont r ol Panel .
c. Fur ni sh and I nst al l Remot e Syst em St at us I ndi cat or of Fi r e Al ar m Panel f r om Fi r e Al ar m Panel l ocat i on t o Mai n Cont r ol Room Annunci at i on Panel .
d. Fur ni sh and i nst al l Smoke Det ect or s above El evat or Door s on Four t h, Thi r d, Second and Fi r st Fl oor Landi ngs.
e. Fur ni sh and i nst al l Hor n/ St r obe on Four t h, Thi r d, Second and Fi r st Fl oor Landi ngs.
f . Fur ni sh and i nst al l Heat / Smoke Det ect or combi nat i on at new El evat or Cont r ol Panel i n Machi ne Room.
g. Fur ni sh and i nst al l Remot e I nt er f ace Rel ay f r om Fi r e Al ar m Panel l ocat i on t o Mai n Cont r ol Room Annunci at i on Panel .
2. 3 SPECI AL OPERATI ON AND CONTROL
Pr ovi de al l speci al oper at i ons and cont r ol syst ems i n accor dance wi t h ASME A17. 1/ CSA B44. Pr ovi de speci al oper at i on key swi t ches wi t h 6 pi n cyl i nder l ocks wi t h r emovabl e cor es and a key cont r ol l ock f or each oper at i on syst em. Pr ovi de t he f ol l owi ng speci al oper at i ons and cont r ol systems.
2. 3. 1 Keys f or El evat or Key Swi t ches
Pr ovi de a mi ni mum of t wel ve keys per uni que cyl i nder used on al l key swi t ches f or a s i ngl e el evat or . Pr ovi de keys wi t h br ass or f i ber gl ass t ags mar ked " PROPERTY OF THE U. S. GOVERNMENT" on one si de wi t h f unct i on of key or appr oved code number on t he ot her s i de.
2. 3. 2 Fi r ef i ght er s ' Emer gency Oper at i on ( FEO)
Pr ovi de FEO equi pment and si gnal i ng devi ces. The desi gnat ed l evel f or t he FEO Phase I key oper at ed swi t ch i s el evat i on 550. 0. I n t he FEO Phase I f i x t ur e, pr ovi de FEO Oper at i ng I nst r uct i ons.
2. 3. 2. 1 Fi r ef i ght er s ' Emer gency Oper at i on ( FEO) Key Box
Pr ovi de f l ush mount ed, l ocki ng, FEO Key Box of a mi ni mum si ze of 5 i nch W by 9 i nch H by 1. 5 i nch D. I nst al l at a hei ght of 6 f eet above f l oor l evel and di r ect l y above t he FEO Phase I key swi t ch. Pr ovi de box equi pped wi t h l ock t hat uses t he FEO K1 key.
SECTI ON 14 21 13 Page 17
2. 3. 3 Hoi st way Access Oper at i on
Pr ovi de hoi st way access oper at i on wi t h swi t ches at t op and bot t om t er mi nal l andi ngs. Locat e swi t ch6 f eet above f l oor l evel , wi t hi n12 i nches of el evat or hoi st way ent r ance f r ame or wi t h t he f er r ul e exposed when l ocat ed i n t he el evat or ent r ance f r ame.
2. 3. 4 Fi r ef i ght er s ' Ser vi ce
Al l Fi r ef i ght er s ' ser vi ce shal l be r epl aced new. Ther e i s a Fi r ef i ght er s ' key oper at ed swi t ch l ocat ed on each f l oor .
2. 3. 5 Smoke Det ect or s
Pr ovi de smoke det ect or s wi t h di r ect connect i ons t o el evat or cont r ol s and t he new Ten Zone Fi r e Al ar m Panel t hat wi l l , when smoke i s det ect ed by any smoke det ect or , act uat e Fi r ef i ght er s ' Ser vi ce and send t he el evat or t o t he cor r ect f l oor as r equi r ed by ASME A17. 1/ CSA B44. Pr ovi de UL l i s t ed smoke det ect or s l ocat ed i n t he el evat or l obbi es and t he el evat or machi ne r oom.
I ncl ude onl y t hese smoke det ect or s i n t he c i r cui t f or t he el evat or cont r ol l er act uat i on of Fi r ef i ght er s ' ser vi ce r ecal l f unct i on. Ensur e t hat al l smoke det ect or s ar e mount ed on f i ni shed cei l i ng.
2. 3. 6 Car Oper at i ng Devi ce
Pr ovi de, i n accor dance wi t h ASME A17. 1/ CSA B44, oper at i ng devi ce mount ed on t he car cont r ol panel , t o per mi t oper at i on of car at or 150 f pm maxi mum f or adj ust ment , mai nt enance, t est i ng, and r epai r .
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.