W912P5-17-B-0014Am1_TSpecs-pages.pdf

PDF 46 KB Posted

Attached to
Melton Hill Lock Raw Water System Rehabilitation
Solicitation number
W912P517B0014
Issued by

About this file

Technical Specifications changed pages

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Raw Wat er Syst em Rehabi l i t at i on Mel t on Hi l l Lock and Dam W912P5- 17- B- 0014 Amendment 0001 Roane Count y, Tennessee

SECTI ON TABLE OF CONTENTS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

SECTI ON 02 41 00

DEMOLITION

PART 1 GENERAL

1. 1 SCOPE

1. 2 REFERENCES

1. 3 GENERAL REQUI REMENTS

1. 4 SUBMI TTALS

1. 5 PROTECTI ON

1. 5. 1 Exi st i ng Condi t i ons

1. 5. 2 I t ems t o Remai n i n Pl ace

1. 6 RELOCATI ONS

1. 7 REQUI RED DATA

1. 8 Equi pment Removal

1. 9 ASBESTOS ABATEMENT

1. 9. 1 Def i ni t i ons

1. 9. 1. 1 Asbest os- Cont ai ni ng Mat er i al ( ACM)

1. 9. 1. 2 Compet ent Per son ( CP)

1. 9. 1. 3 Asbest os Abat ement Wor ker s

1. 9. 1. 4 Cr i t i cal Bar r i er

1. 9. 1. 5 Di sposal Bag

1. 9. 1. 6 Regul at ed Ar ea

1. 9. 2 Unexpect ed Di scover y of Asbest os

1. 9. 3 Qual i t y Assur ance

1. 9. 3. 1 Wr i t t en Qual i f i cat i ons and Or gani zat i on Repor t

1. 9. 3. 2 Speci f i c Requi r ement s

1. 10 LEAD BASED PAI NT AND BLACK MOLD

1. 11 LI CENSE, PERMI TS AND NOTI FI CATI ONS

1. 12 DI SPOSAL FACI LI TY, TRANSPORTER

1. 13 WARNI NG LABELS

1. 14 LOSS OF TOOLS / EQUI PMENT I N LOCK CHAMBER

PART 2 PRODUCT

2. 1 EQUI PMENT

2. 1. 1 Respi r at or y Pr ot ect i on Pr ogr am

2. 1. 2 Speci al Pr ot ect i ve Cl ot hi ng

2. 2 RENTAL EQUI PMENT

2. 3 TOOLS

PART 3 EXECUTI ON

3. 1 EXI STI NG EQUI PMENT TO BE REMOVED

3. 1. 1 Ut i l i t i es and Rel at ed Equi pment

3. 1. 1. 1 Gener al Requi r ement s

3. 1. 2 Mechani cal Equi pment

3. 1. 2. 1 Pi pi ng

3. 1. 2. 2 Hydr ant s

3. 1. 2. 3 Gat e Spr ay Ver t i cal Ser vi ce Li ne

3. 1. 2. 4 Pi pe Anchor s

SECTI ON 02 41 00 Page 1

3. 1. 3 El ect r i cal Equi pment

3. 1. 3. 1 El ect r i cal Devi ces

3. 1. 3. 2 Condui t and Mi scel l aneous I t ems

3. 2 DI SPOSI TI ON OF MATERI AL

3. 2. 1 Ti t l e t o Mat er i al s

3. 3 CLEANI NG AND DI SPOSAL

3. 3. 1 Cl eanup

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 02 41 00 Page 2

SECTI ON 02 41 00

DEMOLITION

PART 1 GENERAL

1. 1 SCOPE

The wor k consi st s of r emovi ng t he exi st i ng equi pment , pi pi ng, hydr ant s, el ect r i cal cont r ol s, wi r e, condui t , handr ai l s as r equi r ed f or t he i nst al l at i on of new equi pment as shown on t he cont r act dr awi ngs f or Mel t on Hi l l Lock.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

29 CFR 1910. 134 Respi r at or y Pr ot ect i on

29 CFR 1926. 1101 Asbestos

29 CFR 1926. 32 Saf et y and Heal t h Regul at i ons f or Const r uct i on - Def i ni t i on

29 CFR 1926. 62 Lead

40 CFR 262 St andar ds Appl i cabl e t o Gener at or s of Hazar dous Wast e

40 CFR 61 Nat i onal Emi ssi on St andar ds f or Hazar dous Ai r Pol l ut ant s

49 CFR 173 Shi pper s - Gener al Requi r ement s f or Shi pment s and Packagi ngs

1. 3 GENERAL REQUI REMENTS

Do not begi n demol i t i on or r emoval of exi t i ng equi pment unt i l aut hor i zat i on i s r ecei ved f r om t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) . I n t he i nt er est of occupat i onal saf et y and heal t h, per f or m t he wor k i n accor dance wi t h EM 385- 1- 1, Sect i on 23, Demol i t i on, and ot her appl i cabl e Sect i ons.

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

SECTI ON 02 41 00 Page 3 submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Demol i t i on Pl an; G, TVA and CELRN- EC- CD

Pr oposed demol i t i on and r emoval pr ocedur es f or appr oval bef or e wor k i s st ar t ed.

Asbest os Hazar d Abat ement Pl an; G

Respi r at or y Pr ot ect i on Pr ogr am; G

SD- 07 Cer t i f i cat es

Li censes, Per mi t s And Not i f i cat i ons; G

Di sposal Faci l i t y ; G

1. 5 PROTECTION

1. 5. 1 Exi st i ng Condi t i ons

Bef or e begi nni ng and di smant l i ng, dr i l l i ng, cut t i ng, r emoval , or ot her modi f i cat i on of exi st i ng wor k, t he Cont r act or shal l not e t he gener al condi t i ons and pr ecaut i ons shal l be t aken t o pr event damage t o t he exi st i ng syst ems or st r uct ur es. Any damage t o such exi st i ng syst ems or st r uct ur es shal l be r epai r ed or r epl aced as appr oved at t he Cont r act or ' s expense.

1. 5. 2 I t ems t o Remai n i n Pl ace

Take necessar y pr ecaut i ons t o avoi d damage t o exi st i ng i t ems t o r emai n i n pl ace, t o be r eused, or t o r emai n t he pr oper t y of t he Gover nment . Repai r or r epl ace damaged i t ems as appr oved by t he COR wi t hout addi t i onal cost t o t he Gover nment .

1. 6 RELOCATIONS

Per f or m t he r emoval and r ei nst al l at i on of r el ocat ed i t ems as i ndi cat ed wi t h wor kmen ski l l ed i n t he t r ades i nvol ved. I t ems t o be r el ocat ed whi ch ar e damaged by t he Cont r act or shal l be r epai r ed or r epl aced wi t h new undamaged i t ems as appr oved by t he COR wi t hout addi t i onal cost t o t he Government.

1. 7 REQUI RED DATA

Pr epar e a Demol i t i on Pl an. I ncl ude i n t he pl an pr ocedur es f or car ef ul r emoval and di sposi t i on of t he f ence, handr ai l , pi pi ng, f i t t i ngs, and ot her equi pment . The demol i t i on pl an wi l l i ncl ude any dr i l l i ng or chi ppi ng to existing concr et e. Addi t i onal 30 days i s r equi r ed f or TVA appr oval f or any demol i t i on. Pr ovi de pr ocedur es f or saf e conduct of t he wor k i n accor dance wi t h EM 385- 1- 1.

SECTI ON 02 41 00 Page 4

1. 8 Equi pment Removal

Al l mat er i al s and equi pment r emoved and not r eused or sal vaged, shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om Gover nment pr oper t y. No equi pment shal l be r eused unl ess ot her wi se st at ed or appr oved by t he Gover nment .

1. 9 ASBESTOS ABATEMENT

The gover nment as i nvest i gat ed t he si t e and bel i eves t her e t o be no asbest os. I n t he event asbest os i s encount er ed t he Cont r act or shal l st op wor k and submi t t he Asbest os Hazar d Abat ement Pl an f or appr oval i n accor dance wi t h t hi s speci f i cat i on.

1. 9. 1 Definitions

1. 9. 1. 1 Asbest os- Cont ai ni ng Mat er i al ( ACM)

Any mat er i al s cont ai ni ng mor e t han one per cent asbest os.

1. 9. 1. 2 Compet ent Per son ( CP)

I n addi t i on t o t he def i ni t i on i n 29 CFR 1926. 32( f ) , a per son who i s capabl e of i dent i f y i ng exi st i ng asbest os hazar ds as def i ned i n 29 CFR 1926. 1101, sel ect i ng t he appr opr i at e cont r ol st r at egy, has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es t o el i mi nat e t hem and has EPA Model Accr edi t at i on Pl an ( MAP) " Cont r act or / Super vi sor " t r ai ni ng; has EPA/ St at e cer t i f i cat i on/ l i cense as a " Cont r act or / Super vi sor " .

1. 9. 1. 3 Asbest os Abat ement Wor ker s

I ndi v i dual who per f or ms asbest os wor k and has compl et ed asbest os wor ker t r ai ni ng r equi r ed by 29 CFR 1926. 1101, t o i ncl ude EPA Model Accr edi t at i on Pl an ( MAP) " Wor ker " t r ai ni ng; accr edi t at i on i f r equi r ed by t he OSHA Cl ass of wor k t o be per f or med or by t he st at e wher e t he wor k i s t o be per f or med.

Compet ent per son and wor ker can be t he same per son i f he or she meet s t he r equi r ement s of bot h " Compet ent per son" and " wor ker " par agr aphs.

1. 9. 1. 4 Cr i t i cal Bar r i er

One or mor e l ayer s of pl ast i c seal ed over al l openi ngs i nt o a r egul at ed ar ea or any ot her s i mi l ar l y pl aced physi cal bar r i er suf f i c i ent t o pr event ai r bor ne asbest os i n a r egul at ed ar ea f r om mi gr at i ng t o an adj acent ar ea.

1. 9. 1. 5 Di sposal Bag

A 6 mi l t hi ck, l eak- t i ght pl ast i c bag, pr e- l abel ed i n accor dance wi t h 29 CFR 1926. 1101, used f or t r anspor t i ng asbest os wast e f r om cont ai nment t o di sposal s i t e.

1. 9. 1. 6 Regul at ed Ar ea

An OSHA t er m def i ned i n 29 CFR 1926. 1101 meani ng an ar ea est abl i shed by t he Cont r act or t o demar cat e ar eas wher e asbest os wor k i s conduct ed; al so any adj oi ni ng ar ea wher e debr i s and wast e f r om such asbest os wor k accumul at e; and an ar ea wi t hi n whi ch ai r bor ne concent r at i ons of asbest os exceed, or t her e i s a r easonabl e possi bi l i t y t hey may exceed, t he per mi ssi bl e exposur e l i mi t .

SECTI ON 02 41 00 Page 5

1. 9. 2 Unexpect ed Di scover y of Asbest os

Not i f y t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) f or any pr evi ousl y unt est ed bui l di ng component s suspect ed t o cont ai n asbest os and l ocat ed i n ar eas i mpact ed by t he wor k.

1. 9. 3 Qual i t y Assur ance

I n addi t i on t o t he det ai l ed r equi r ement s of t hi s speci f i cat i on, al l wor k per f or med under t hi s cont r act shal l compl y wi t h EM 385- 1- 1, appl i cabl e f eder al , st at e, and l ocal l aws, or di nances, cr i t er i a, r ul es and r egul at i ons r egar di ng handl i ng, st or i ng, t r anspor t i ng, and di sposal of asbest os wast e mat er i al s.

1. 9. 3. 1 Wr i t t en Qual i f i cat i ons and Or gani zat i on Repor t

Submi t a wr i t t en Qual i f i cat i ons and Or gani zat i on Repor t pr ovi di ng evi dence of qual i f i cat i ons of t he Cont r act or , Desi gnat ed Compet ent Per son, al l wor ker s, al l subcont r act or s t o be used i ncl udi ng di sposal t r anspor t at i on and di sposal f aci l i t y f i r ms, subcont r act or super vi sor s, subcont r act or wor ker s and any ot her per sons assi gned t o per f or m asbest os abat ement and suppor t act i v i t i es.

1. 9. 3. 2 Speci f i c Requi r ement s

Desi gnat e i n wr i t i ng, per sonnel meet i ng t he f ol l owi ng qual i f i cat i ons:

a. Asbest os Abat ement Cont r act or : Cer t i f i ed/ l i censed by appl i cabl e st at e agenci es t o per f or m asbest os- r el at ed act i v i t i es.

b. Desi gnat ed Compet ent Per son ( CP) : Qual i f i ed i n accor dance wi t h 29 CFR 1926. 32 and 29 CFR 1926. 1101, has EPA MAP " Cont r act or / Super vi sor " t r ai ni ng accr edi t at i on, has EPA/ St at e cer t i f i cat i on/ l i cense as a " Cont r act or / Super vi sor " and i s exper i enced i n t he admi ni st r at i on and super vi s i on of asbest os abat ement pr oj ect s.

The Desi gnat ed Compet ent Per son shal l be r esponsi bl e f or compl i ance wi t h appl i cabl e f eder al , st at e and l ocal r equi r ement s, t he Cont r act or ' s Acci dent Pr event i on Pl an ( APP) and Asbest os Hazar d Pl an

(AHAP).

C. Asbest os Abat ement Wor ker s: Meet t he r equi r ement s cont ai ned i n 29 CFR 1926. 1101, 40 CFR 61, Subpar t M, and ot her appl i cabl e f eder al , st at e and l ocal r equi r ement s.

1. 10 LEAD BASED PAI NT AND BLACK MOLD

Gover nment as i nvest i gat ed t he pr oj ect and f ound no bl ack mol d or l ead pai nt . I n t he even t he Cont r act or encount er s l ead pai nt and bl ack mol d t hey shal l not i f y t he COR and shal l compl y wi t h l ead based pai nt and bl ack mol d mi t i gat i on pr ocedur es as mandat ed by f eder al r egul at i ons.

1. 11 LI CENSE, PERMI TS AND NOTI FI CATI ONS

Obt ai n necessar y l i censes, per mi t s and not i f i cat i ons i n conj unct i on wi t h t he pr oj ect ' s asbest os abat ement , t r anspor t at i on and di sposal act i ons and t i mel y not i f i cat i on f ur ni shed of such act i ons as r equi r ed by f eder al , st at e, r egi onal , and l ocal aut hor i t i es such as t he KY Di vi s i on of Ai r Qual i t y, Di v i s i on of Wat er . The Cont r act or i s r esponsi bl e f or t he

SECTI ON 02 41 00 Page 6 associ at ed f ees/ cost s f or l i censes, per mi t s, and not i f i cat i ons.

1. 12 DI SPOSAL FACI LI TY, TRANSPORTER

Wr i t t en evi dence t hat t he l andf i l l t o be used i s appr oved f or asbest os di sposal by t he f eder al , st at e and l ocal r egul at or y agenci es. Copi es of s i gned agr eement s bet ween t he Cont r act or ( i ncl udi ng subcont r act or s and t r anspor t er s) and t he asbest os wast e di sposal f aci l i t y t o accept and di spose of al l asbest os cont ai ni ng wast e shal l be pr ovi ded. The Cont r act or and t r anspor t er s shal l meet t he DOT r equi r ement s of 49 CFR 173.

1. 13 WARNI NG LABELS

War ni ng l abel s shal l be af f i xed t o al l asbest os di sposal cont ai ner s, asbest os mat er i al s, scr ap, wast e debr i s, and ot her pr oduct s cont ami nat ed wi t h asbest os. Cont ai ner s wi t h pr epr i nt ed war ni ng l abel s conf or mi ng t o r equi r ement s ar e accept abl e.

1. 14 LOSS OF TOOLS / EQUI PMENT I N LOCK CHAMBER

Cont r act or i s r esponsi bl e f or t he cost t o r et r i eve any equi pment t hat i s dr opped i n t he l ock chamber . I n addi t i on, cont r act or shal l not i f y t he COR wi t hi n 72 hour s of any t ool s or equi pment t hat ar e dr opped i n t he l ock chamber by t he cont r act or or subcont r act or .

PART 2 PRODUCT

2. 1 EQUIPMENT

2. 1. 1 Respi r at or y Pr ot ect i on Pr ogr am

The Cont r act or shal l est abl i sh i n wr i t i ng, and i mpl ement a r espi r at or y pr ot ect i on pr ogr am i n accor dance wi t h 29 CFR 1926. 1101 and 29 CFR 1910. 134.

The Cont r act or shal l est abl i sh mi ni mum r espi r at or y pr ot ect i on r equi r ement s based on measur ed or ant i c i pat ed l evel s of ai r bor ne asbest os f i ber concentrations.

2. 1. 2 Speci al Pr ot ect i ve Cl ot hi ng

Fur ni sh per sonnel who wi l l be exposed t o ai r bor ne asbest os f i ber concent r at i ons wi t h pr oper di sposabl e or uncont ami nat ed, r eusabl e pr ot ect i ve whol e body cl ot hi ng, head cover i ng, gl oves, eye wear and f oot cover i ngs as r equi r ed by 29 CFR 1926. 62. Fur ni sh pr oper di sposabl e pl ast i c or r ubber gl oves t o pr ot ect hands. Reusabl e whol e body pr ot ect i on wor n shal l be ei t her di sposed of as asbest os wast e upon exi t i ng f r om t he r egul at ed ar ea or be pr oper l y l aunder ed i n accor dance wi t h 29 CFR 1926. 1101.

The Cont r act or ' s Desi gnat ed Compet ent Per son has t he aut hor i t y t o t ake i mmedi at e act i on t o upgr ade or downgr ade whol e body pr ot ect i on when t her e i s an i mmedi at e danger t o t he heal t h and saf et y of t he wear er .

Fur ni sh t he COR wi t h t wo compl et e set s of speci al pr ot ect i ve c l ot hi ng dai l y, as r equi r ed her ei n, f or ent r y i nt o and i nspect i on of t he asbest os / pai nt r emoval wor k wi t hi n t he asbest os cont r ol l ed ar ea.

2. 2 RENTAL EQUI PMENT

I f r ent al equi pment i s t o be used, wr i t t en not i f i cat i on shal l be pr ovi ded t o t he r ent al agency, concer ni ng t he i nt ended use of t he equi pment , t he possi bi l i t y of asbest os cont ami nat i on of t he equi pment and t he st eps t hat

SECTI ON 02 41 00 Page 7 wi l l be t aken t o decont ami nat e such equi pment .

2. 3 TOOLS

Power t ool s shal l not be used t o r emove ACM unl ess t he t ool i s equi pped wi t h ef f ect i ve, i nt egr al HEPA f i l t er ed exhaust vent i l at i on capt ur e and col l ect i on syst em. Reusabl e t ool s shal l be t hor oughl y decont ami nat ed pr i or t o bei ng r emoved f r om r egul at ed ar eas.

PART 3 EXECUTI ON

3. 1 EXI STI NG EQUI PMENT TO BE REMOVED

Remove handr ai l , pi pi ng & f i t t i ngs, and el ect r i cal equi pment as r equi r ed f or t he r epl acement of t he washdown syst em and gat e spr ay syst em.

El ect r i cal wi r i ng i nsi de of handr ai l must be r emoved and r e- r out ed i n conduit.

3. 1. 1 Ut i l i t i es and Rel at ed Equi pment

3. 1. 1. 1 Gener al Requi r ement s

Do not begi n demol i t i on or r emoval wor k unt i l al l ut i l i t y di sconnect i ons have been made.

3. 1. 2 Mechani cal Equi pment

Mechani cal equi pment must be di sconnect ed at f i t t i ngs. Remove ser vi ce val ves at t ached t o t he uni t .

3. 1. 2. 1 Piping

Al l exi st i ng r aw wat er pi pe wi l l be r emoved. Di sconnect pi pi ng at uni ons, f l anges, val ves, and f i t t i ngs as pr act i cabl e t o r educe t he pi pe i nt o st r ai ght l engt hs. I f t he pi pi ng t hat r emai ns can become pr essur i zed, end caps, bl i nd f l anges, or ot her t ypes of pl ugs or f i t t i ngs shal l be at t ached t o t he open end of t he pi pe t o ensur e posi t i ve l eak cont r ol .

3. 1. 2. 2 Hydrants

The 4 hydr ant s t hat ser vi ce t he hose cabi net s wi l l be r emoved f or pr epar at i on of a di r ect ser vi ce l i ne t o t he cabi net s f r om t he suppl y l i ne i n t he gal l er y. Exi st i ng pi pe t hr ough t he concr et e f r om t he hydr ant s wi l l be r emove i n pr epar at i on f or t hi s new suppl y l i ne.

The 4 hydr ant s i n t he mi ddl e of t he l ock wi l l be abandoned i n pl ace. The ser vi ce l i ne i n t he gal l er y t hat suppl i es t he hydr ant s wi l l be demol i shed, cut away f r om t he mai n suppl y l i ne, and capped.

3. 1. 2. 3 Gat e Spr ay Ver t i cal Ser vi ce Li ne

The 3" embedded pi pe t hat suppl i es t he gat e spr ay syst em wi l l be cor e dr i l l ed and r emoved f r om t he concr et e. The concr et e wi l l be cor e dr i l l as r equi r ed t o r un a new 3" ser vi ce pi pe and anchor ed usi ng l i nk seal coupl i ngs, or gover nment appr oved equal , r ef er enced i n const r uct i on speci f i cat i ons 22 00 00.

SECTI ON 02 41 00 Page 8

3. 1. 2. 4 Pi pe Anchor s

Pi pe anchor s t hat ar e embedded i n concr et e and shar e a mount wi t h compr essed ai r can be r eused. The anchor must st i l l be i n good ser vi ceabl e condi t i on. Pi pe anchor s l ocat ed i n t he pump r oom wi l l be r emoved and r epl aced wi t h new anchor s as r equi r ed f or t he new pi pe net wor k.

3. 1. 3 El ect r i cal Equi pment

3. 1. 3. 1 El ect r i cal Devi ces

Remove one exi st i ng push- but t on per hose cabi net ( r equi r ed 4) . Remove conduct or s i ncl udi ng wi r e, nonmet al l i c sheat hed and f l exi bl e ar mor ed cabl e, cont r ol s, pushbut t ons, i ndi cat i ng l i ght s, out l et boxes, and si mi l ar i t ems. Al l wi r e r an i nsi de handr ai l must be r emoved and r e- r out ed i n conduit.

3. 1. 3. 2 Condui t and Mi scel l aneous I t ems

Sal vage condui t except wher e embedded i n concr et e or masonr y. Consi der cor r oded, bent , or damaged condui t as scr ap met al . Sor t st r ai ght and undamaged l engt hs of condui t accor di ng t o s i ze and t ype. Cl assi f y suppor t s, knobs, t ubes, c l eat s, and st r aps as debr i s t o be r emoved and disposed.

3. 2 DI SPOSI TI ON OF MATERI AL

3. 2. 1 Ti t l e t o Mat er i al s

Al l mat er i al s and equi pment r emoved and not r eused or sal vaged, shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om Gover nment pr oper t y.

Removed handr ai l shal l be sal vaged and shal l become t he Gover nment property.

3. 3 CLEANI NG AND DI SPOSAL

3. 3. 1 Cleanup

Mai nt ai n sur f aces of t he asbest os cont r ol ar ea f r ee of accumul at i ons of pai nt chi ps and dust . Rest r i ct t he spr ead of dust and debr i s; keep wast e f r om bei ng di st r i but ed over t he wor k ar ea. Do not dr y sweep or use compr essed ai r t o c l ean up t he ar ea. At t he end of each shi f t and when t he asbest os / pai nt r emoval oper at i on has been compl et ed, c l ean t he ar ea of v i s i bl e asbest os cont ami nat i on by vacuumi ng wi t h a HEPA f i l t er ed vacuum cl eaner , wet moppi ng t he ar ea and wet wi pi ng t he ar ea as i ndi cat ed by t he CP. Recl ean ar eas showi ng dust or r esi dual pai nt chi ps or debr i s. Af t er v i s i bl e dust , chi ps and debr i s i s r emoved, wet wi pe and HEPA vacuum al l sur f aces i n t he wor k ar ea. I f adj acent ar eas become cont ami nat ed at any t i me dur i ng t he wor k, c l ean, v i sual l y i nspect , and t hen wi pe sampl e al l cont ami nat ed ar eas.

Di spose of debr i s, scr ap, and ot her nonsal vageabl e mat er i al s r esul t i ng f r om r emoval oper at i ons wi t h al l appl i cabl e f eder al , st at e and l ocal r egul at i ons. Appl y l ocal r egul at i ons r egar di ng haul i ng and di sposal .

Col l ect asbest os- cont ami nat ed wast e, scr ap, debr i s, bags, cont ai ner s, and equi pment , and cl ot hi ng t hat may pr oduce ai r bor ne concent r at i ons of

SECTI ON 02 41 00 Page 9 asbest os. Label t he cont ai ner s i n accor dance wi t h 29 CFR 1926. 62 and 40 CFR 262. Di spose of asbest os- cont ami nat ed wast e mat er i al at an st at e appr oved hazar dous wast e t r eat ment , st or age, or di sposal f aci l i t y of f Gover nment pr oper t y.

- - End of Sect i on - -

SECTI ON 02 41 00 Page 10

DEMOLITION
DEMOLITION
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 GENERAL REQUIREMENTS
1.4 SUBMITTALS
1.5 PROTECTION
1.5.1 Existing Conditions
1.5.2 Items to Remain in Place
1.6 RELOCATIONS
1.7 REQUIRED DATA
1.8 Equipment Removal
1.9 ASBESTOS ABATEMENT
1.9.1 Definitions
1.9.1.1 Asbestos-Containing Material ACM
1.9.1.2 Competent Person CP
1.9.1.3 Asbestos Abatement Workers
1.9.1.4 Critical Barrier
1.9.1.5 Disposal Bag
1.9.1.6 Regulated Area
1.9.2 Unexpected Discovery of Asbestos
1.9.3 Quality Assurance
1.9.3.1 Written Qualifications and Organization Report
1.9.3.2 Specific Requirements
1.10 LEAD BASED PAINT AND BLACK MOLD
1.11 LICENSE, PERMITS AND NOTIFICATIONS
1.12 DISPOSAL FACILITY, TRANSPORTER
1.13 WARNING LABELS
1.14 LOSS OF TOOLS / EQUIPMENT IN LOCK CHAMBER
PART 2 PRODUCT
2.1 EQUIPMENT
2.1.1 Respiratory Protection Program
2.1.2 Special Protective Clothing
2.2 RENTAL EQUIPMENT
2.3 TOOLS
PART 3 EXECUTION
3.1 EXISTING EQUIPMENT TO BE REMOVED
3.1.1 Utilities and Related Equipment
3.1.1.1 General Requirements
3.1.2 Mechanical Equipment
3.1.2.1 Piping
3.1.2.2 Hydrants
3.1.2.3 Gate Spray Vertical Service Line
3.1.2.4 Pipe Anchors
3.1.3 Electrical Equipment
3.1.3.1 Electrical Devices
3.1.3.2 Conduit and Miscellaneous Items
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
3.3 CLEANING AND DISPOSAL
3.3.1 Cleanup

File details come from the government source that posted it. Updated .