DHDW_C-101_(Overall)-Plot-000.pdf
PDF 15 MB Posted
- Attached to
- Dale Hollow Dam Campground Waterline Replacement
- Solicitation number
- W912P5-17-B-0006
About this file
Amendment 0001 Updated Drawing DHDW_C-101 (Overall)-Plot-000.pdf
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
House
Walking &
Bike Trail
Walking Trail
Fish
Day Use
Are
Picnic
Shelter
Playground
Area
Boat Ramp
P a rk in g
Registration
Center
Playground
Area
Parking
Parking
Dump
Station
Dumpsters
Park Attendant
Amphitheater
Fishing
Platform
Fishing
Platform
Cleaning
Station
House Laundry
Dumpsters
Fishing
Shelter
Accessible Fishing
Platform
Obey River
HOUSE #2
BATH
HOUSE #3
BATH
LEGEND
SCALE: 1" = 100'
100'100'
N
EXISTING PIPE TIE-IN
2" WATER LINE - BRANCH LINE
Bath
Bath
Bath House
C110
C110
C110
HOUSE #1
BATH
4" WATER LINE - MAIN LINE
PIPE REDUCER (PR)
BLOWOFF VALVE (BV)
GATE VALVE (GV), NORMALLY OPEN (N.O.)
## CAMPSITE TO RECEIVE NEW 3/4 INCH LINE
## CAMPSITE NOT TO RECEIVE NEW 3/4 INCH LINE
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
M R -P -6
/2
C O
N -0
-B -N
U M
B
S O
L -0
-B -N
U M
B
A N
S I
D
ID
Sheet
C P
T J
E S
S E W
D A
V
IS
E .I
J W
D F
C M
S A
M U
E L C
O R
Y M
O R
G A
N P .E
S
C A
L E
D
A T
E S
F
IL
E S
/0
/3 of Engineers
US Army Corps
Nashville District
C U
M B
E R
L A
N D R
IV
E R W
A T
E R
S H
E D
D A
L E H
O L L
O W D
A M P
R O J E
C T
W A
T E
R L
IN
E R
E P
L A
C E
M E
N T
D A
L E H
O L L
O W D
A M C
A M
P G
R O
U N
D
READY TO ADVERTISE
0 0
C-101
O V
E R
A L L S
IT
E P
L A
N
LAY-DOWN AREA
CONTRACTOR
GENERAL NOTES:
1. IMAGERY WAS IMPORTED INTO
MICROSTATION FROM GOOGLE EARTH.
ACCORDING TO THE SOFTWARE, THE IMAGERY
WAS CAPTURED ON OCTOBER 10, 2013.
2. IMAGERY PROVIDED FOR GENERAL SITE
ORIENTATION. IMAGERY WAS ALSO USED TO
SCALE IN VECTORIZED PARKING LAYOUT.
PARKING LINES ARE APPROXIMATE. PARKING
LINES WERE IMPORTED FROM A DRAWING
FOUND ON THE DALE HOLLOW CAMPSITE
WEBSITE.
3. EXISTING WATER AND ELECTRICAL LINES
PROVIDED IN THE REFERENCE DRAWINGS
WERE MARKED USING A GROUND
PENETRATING RADAR AND CAPTURED USING A
TRIMBLE UNIT. HAND TOOLS WILL BE
REQUIRED WHEN EXCAVATING WITHIN 5 FEET
OF A KNOWN BURIED UTILITY. SEE ELECTRICAL
LINE REFERENCE FOR SPLICING REQUIREMENT
NOTES IF A LINE IS SEVERED DURING
CONSTRUCTION.
4. XYZ CAD DATA WILL BE MADE AVAILABLE
UPON CONTRACTOR'S REQUEST.
5. THE CONTRACTOR SHALL FIELD VERIFY ALL
PROPOSED ALIGNMENTS WITH RESPECT TO
EXISTING UTILITIES AND SITE FEATURES PRIOR
TO BEGINNING CONSTRUCTION. COORDINATE
DISCREPANCIES AND FINAL PIPE ALIGNMENT
WITH THE CONTRACTING OFFICER PRIOR TO
CONSTRUCTION.
6. THE NEW WATER PIPING SHALL BE
INSTALLED ALONG THE SAME ALIGNMENT AS
THE EXISTING LINE (+/-) 1 FOOT HORIZONTALLY
AND AT THE DEPTH REQUIRED BY THE DETAILS
(WITH EXCEPTION TO THE WATER LINE BEING
PLACED WHERE EXISTING WATER LINES DO
NOT EXIST CURRENTLY). LOCATION OF THE
NEW WATER LINE SHOWN ON THE DRAWINGS IS
APPROXIMATE.
7. REFER TO BID SCHEDULE FOR APPROXIMATE
LENGTHS OF PIPE REQUESTED.
8. CAMP SITES WITH HATCHING NOT TO
RECEIVE NEW 3/4 INCH PIPING.
9. EXISTING WATERLINE REMOVED DURING
CONSTRUCTION SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL
BE DISPOSED OF IN ACCORDANCE WITH STATE
AND LOCAL REGULATIONS.
10. NEW WATER LINE INSTALLATION INCLUDES
RECONNECTION OF SPIGOT LINES AT EACH
CAMPSITE. THE SPIGOT LINES ARE 3/4 INCH
PIPES. 3/4 INCH LINES NOT SHOWN.
11. UNLESS OTHERWISE APPROVED, TRENCH
EXCAVATION AND PIPE PLACEMENT SHALL
PROGRESS IN A MANNER SO THAT THE
CONTRACTOR CAN BACKFILL ALL OPEN
TRENCHES WITHIN 48 HOURS.
12. CONSTRUCTION SHALL NOT COMMENCE
PRIOR TO OCT 25TH, 2017. THE CONTRACTOR
WILL BE COMPLETE WITH ALL TASKS,
INCLUDING CLEAN UP, BY ARPIL 6TH, 2018.
DETAILS - BATH HOUSE CONNECTIONC-110
DETAILS - TRENCH DETAILSC-109
DETAILS - SPIGOT TIE-INC-108
DETAILS VALVESC-107
OPTION 3 PLAN VIEWC-106
OPTION 2 PLAN VIEWC-105
OPTION 1 PLAN VIEWC-104
BASE PLAN VIEWC-103
SCHEMATIC DIAGRAMC-102
OVERALL SITE PLANC-101
LOCATION AND VICINITY MAPG-100
INDEX OF DRAWINGS
EXISTING WATERLINE IS NECESSARY
IS NOT AWARDED AND A TIE-IN TO
REDUCER ONLY REQUIRED IF OPTION 1
T H A
V E S
O U
T H
A
N A
S H
V
IL
L E T
N
D H
D W
C -1
O v e ra ll d g n
3. MINIMIZE DISTURBANCE OF ANY EXISTING TREES.
NEEDED DURING THE CONSTRUCTION PERIOD.
REQUIRED WHERE IT IS EVIDENT THAT EROSION OR SEDIMENT CONTROL IS
2. AT A MINIMUM, EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPS) ARE
CONSTRUCTION PERIOD.
COMMENCING EARTHWORK AND SHALL BE MAINTAINED THROUGHOUT THE
1. ALL NECESSARY EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO
ENVIRONMENTAL NOTES:
A -0
F C
M
A D
D E
D N
O T
E T
O E
N V
IR
O N
M E
N T
A L N
O T
E S
/1
/1
/1
/2
F C
M
File details come from the government source that posted it. Updated .