DHDW_C-101_(Overall)-Plot-000.pdf

PDF 15 MB Posted

Attached to
Dale Hollow Dam Campground Waterline Replacement
Solicitation number
W912P5-17-B-0006
Issued by

About this file

Amendment 0001 Updated Drawing DHDW_C-101 (Overall)-Plot-000.pdf

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

House

Walking &

Bike Trail

Walking Trail

Fish

Day Use

Are

Picnic

Shelter

Playground

Area

Boat Ramp

P a rk in g

Registration

Center

Playground

Area

Parking

Parking

Dump

Station

Dumpsters

Park Attendant

Amphitheater

Fishing

Platform

Fishing

Platform

Cleaning

Station

House Laundry

Dumpsters

Fishing

Shelter

Accessible Fishing

Platform

Obey River

HOUSE #2

BATH

HOUSE #3

BATH

LEGEND

SCALE: 1" = 100'

100'100'

N

EXISTING PIPE TIE-IN

2" WATER LINE - BRANCH LINE

Bath

Bath

Bath House

C110

C110

C110

HOUSE #1

BATH

4" WATER LINE - MAIN LINE

PIPE REDUCER (PR)

BLOWOFF VALVE (BV)

GATE VALVE (GV), NORMALLY OPEN (N.O.)

## CAMPSITE TO RECEIVE NEW 3/4 INCH LINE

## CAMPSITE NOT TO RECEIVE NEW 3/4 INCH LINE

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

M R -P -6

/2

C O

N -0

-B -N

U M

B

S O

L -0

-B -N

U M

B

A N

S I

D

ID

Sheet

C P

T J

E S

S E W

D A

V

IS

E .I

J W

D F

C M

S A

M U

E L C

O R

Y M

O R

G A

N P .E

S

C A

L E

D

A T

E S

F

IL

E S

/0

/3 of Engineers

US Army Corps

Nashville District

C U

M B

E R

L A

N D R

IV

E R W

A T

E R

S H

E D

D A

L E H

O L L

O W D

A M P

R O J E

C T

W A

T E

R L

IN

E R

E P

L A

C E

M E

N T

D A

L E H

O L L

O W D

A M C

A M

P G

R O

U N

D

READY TO ADVERTISE

0 0

C-101

O V

E R

A L L S

IT

E P

L A

N

LAY-DOWN AREA

CONTRACTOR

GENERAL NOTES:

1. IMAGERY WAS IMPORTED INTO

MICROSTATION FROM GOOGLE EARTH.

ACCORDING TO THE SOFTWARE, THE IMAGERY

WAS CAPTURED ON OCTOBER 10, 2013.

2. IMAGERY PROVIDED FOR GENERAL SITE

ORIENTATION. IMAGERY WAS ALSO USED TO

SCALE IN VECTORIZED PARKING LAYOUT.

PARKING LINES ARE APPROXIMATE. PARKING

LINES WERE IMPORTED FROM A DRAWING

FOUND ON THE DALE HOLLOW CAMPSITE

WEBSITE.

3. EXISTING WATER AND ELECTRICAL LINES

PROVIDED IN THE REFERENCE DRAWINGS

WERE MARKED USING A GROUND

PENETRATING RADAR AND CAPTURED USING A

TRIMBLE UNIT. HAND TOOLS WILL BE

REQUIRED WHEN EXCAVATING WITHIN 5 FEET

OF A KNOWN BURIED UTILITY. SEE ELECTRICAL

LINE REFERENCE FOR SPLICING REQUIREMENT

NOTES IF A LINE IS SEVERED DURING

CONSTRUCTION.

4. XYZ CAD DATA WILL BE MADE AVAILABLE

UPON CONTRACTOR'S REQUEST.

5. THE CONTRACTOR SHALL FIELD VERIFY ALL

PROPOSED ALIGNMENTS WITH RESPECT TO

EXISTING UTILITIES AND SITE FEATURES PRIOR

TO BEGINNING CONSTRUCTION. COORDINATE

DISCREPANCIES AND FINAL PIPE ALIGNMENT

WITH THE CONTRACTING OFFICER PRIOR TO

CONSTRUCTION.

6. THE NEW WATER PIPING SHALL BE

INSTALLED ALONG THE SAME ALIGNMENT AS

THE EXISTING LINE (+/-) 1 FOOT HORIZONTALLY

AND AT THE DEPTH REQUIRED BY THE DETAILS

(WITH EXCEPTION TO THE WATER LINE BEING

PLACED WHERE EXISTING WATER LINES DO

NOT EXIST CURRENTLY). LOCATION OF THE

NEW WATER LINE SHOWN ON THE DRAWINGS IS

APPROXIMATE.

7. REFER TO BID SCHEDULE FOR APPROXIMATE

LENGTHS OF PIPE REQUESTED.

8. CAMP SITES WITH HATCHING NOT TO

RECEIVE NEW 3/4 INCH PIPING.

9. EXISTING WATERLINE REMOVED DURING

CONSTRUCTION SHALL BECOME THE

PROPERTY OF THE CONTRACTOR AND SHALL

BE DISPOSED OF IN ACCORDANCE WITH STATE

AND LOCAL REGULATIONS.

10. NEW WATER LINE INSTALLATION INCLUDES

RECONNECTION OF SPIGOT LINES AT EACH

CAMPSITE. THE SPIGOT LINES ARE 3/4 INCH

PIPES. 3/4 INCH LINES NOT SHOWN.

11. UNLESS OTHERWISE APPROVED, TRENCH

EXCAVATION AND PIPE PLACEMENT SHALL

PROGRESS IN A MANNER SO THAT THE

CONTRACTOR CAN BACKFILL ALL OPEN

TRENCHES WITHIN 48 HOURS.

12. CONSTRUCTION SHALL NOT COMMENCE

PRIOR TO OCT 25TH, 2017. THE CONTRACTOR

WILL BE COMPLETE WITH ALL TASKS,

INCLUDING CLEAN UP, BY ARPIL 6TH, 2018.

DETAILS - BATH HOUSE CONNECTIONC-110

DETAILS - TRENCH DETAILSC-109

DETAILS - SPIGOT TIE-INC-108

DETAILS VALVESC-107

OPTION 3 PLAN VIEWC-106

OPTION 2 PLAN VIEWC-105

OPTION 1 PLAN VIEWC-104

BASE PLAN VIEWC-103

SCHEMATIC DIAGRAMC-102

OVERALL SITE PLANC-101

LOCATION AND VICINITY MAPG-100

INDEX OF DRAWINGS

EXISTING WATERLINE IS NECESSARY

IS NOT AWARDED AND A TIE-IN TO

REDUCER ONLY REQUIRED IF OPTION 1

T H A

V E S

O U

T H

A

N A

S H

V

IL

L E T

N

D H

D W

C -1

O v e ra ll d g n

3. MINIMIZE DISTURBANCE OF ANY EXISTING TREES.

NEEDED DURING THE CONSTRUCTION PERIOD.

REQUIRED WHERE IT IS EVIDENT THAT EROSION OR SEDIMENT CONTROL IS

2. AT A MINIMUM, EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPS) ARE

CONSTRUCTION PERIOD.

COMMENCING EARTHWORK AND SHALL BE MAINTAINED THROUGHOUT THE

1. ALL NECESSARY EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO

ENVIRONMENTAL NOTES:

A -0

F C

M

A D

D E

D N

O T

E T

O E

N V

IR

O N

M E

N T

A L N

O T

E S

/1

/1

/1

/2

F C

M

File details come from the government source that posted it. Updated .