CONTRACTING DIVISION (RK)
RAY.KENDRICK@USACE.ARMY.MIL
NASHVILLE TN 37203
W38XDD61024663
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Post Questions and Answ ers from site visit along w ith information only draw ings to FBO.Gov.///////////All Other Terms and Conditions Remains Unchanged///////////
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-B-0014
X 9B. DATED (SEE ITEM 11)
05-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2016
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37202-1070
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912P5
FACILITY CODECODE
EMAIL:TEL:
W912P5-16-B-0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Q&A SITE VISIT
Kentucky Lock - Lock Grating Modifications
Questions:
1. What is the expected Start date for this project?
Answer: Upon notice of Award and Notice to Proceed.
2. What about the existing damaged grating? Will the contractor be required to repair the damaged ones?
Answer: Yes – Contractor should repair damaged grating panels.
3. What is the weight of the 1‐1/2" grating per square foot?
Answer: Approximately 15 psf.
4. What is the weight of the 4‐1/2” reinforcement grating per square foot?
Answer: Approximately 55 psf.
5. How many grates or areas of grates will be allowed to be removed at a time?
Answer: One area (corner) shall be permitted to be removed at a time.
6. Is there a site plan for these areas for take‐off purposes of temporary hand rail installation?
Answer: Yes. (6) For Information Only drawings are provided.
7. Many of the grates have I‐Beam supports below the understood preferred areas for I‐Bolt installation. The design shown will have the I‐Bolt and support plate protrude below the grating and will cause the grates to rest with the I‐Bolt/Plate on the support beam and will not sit level. Please clarify the intended locations of the new I‐Bolts or revise the design to allow the bolt and plate to be flush with the bottom of the grate.
Answer: Contractor shall ensure lifting points do not interfere with grating supports. If interference will occur at location indicated on plans, Contractor shall propose new location for approval by government.
8. After review of several of the diamond plate covered grating sections, it is understood that these sections are filled with cement. Is it still your intention to use the current design for these sections?
Answer: The grating panels with grout infill are not to be modified.
9. Can scaffolding be used for temporary barricades?
W912P5-16-B-0014
Answer: All guardrail shall be in compliance with current EM‐385. Please refer to reference EM‐385‐1‐1.
21.F.01 Standard Guardrail Systems.
10. Also we would like to know what kind of coating is presently on the 1‐1/2" Grating and the 4‐1/2" reinforcement grating (paint? galvanize? etc.)
Answer: The grating panels have an existing hot dip galvanized coating.
11. Are we doing each side of the lock in stages (2 total, land + river) or each section in stages (3 total, upper land + upper land + upper river)?
Answer: One area (corner) shall be permitted to be removed at a time.
12. To hot dip the parts, they need to be stripped and recoated. The largest sections will have to be dipped in stages as many galvanizers do not have tubs large enough to dip them once. Dipping in stages can potentially distort products, which the vendor would not be liable for. Is there an alternative coating that can be used or do we need to go to the necessary lengths to get them hot dipped?
Answer: All grating panels shall be hot dip galvanized after fabrication/repairs.
13. Would it be acceptable to build new grates? This may shorten lead time and avoid potential recoating issues.
Answer: New grating panels are permitted if Government incurs no additional cost.
14. Note 7 of the drawing says the existing lift points are acceptable for the 4 point grates. The spec recommends 12” from the edges. If the I‐beam is in the way, should the lift points be moved closer to the inside of the grate?
Answer: Contractor shall ensure lifting points do not interfere with grating supports. If interference will occur at location indicated on plans, Contractor shall propose new location for approval by government.
15. Does every section need eyebolts or just places to put eyebolts?
Answer: The contractor shall supply 12 each, 1” Crosby G‐277 shouldered eye bolts or approved equal.
16. On the drawing, there is a single asterisk note in the grating schedule that refers to the aluminum plated grates. We discovered that those were filled with concrete at the site. How will these be handled in the scope of this project?
Answer: The grating panels with grout infill are not to be modified.
(End of Summary of Changes)