Grout Question.pdf

PDF 169 KB Posted

Attached to
Buffalo Harbor CDF 4
Solicitation number
W912P420B0009
Issued by

About this file

This document contains details of a federal contract opportunity for the Buffalo Harbor CDF 4 project. The solicitation is seeking bids for repair of an existing sea-wall and confined disposal facility, with a project cost estimate between $1-5 million. NAICS code 237990 applies with a size standard of $36.5 million. The agency is the Department of the Army Corps of Engineers Buffalo District. A 20% bid guarantee or $3 million maximum is required. The contract period of performance is 137 days including all options. The pre-bid meeting will take place online on May 27th. The wage determination is IL20200018.

View the file

Other files

File Type Posted
Abstract IGE adjusted_cdf4_20.xls XLS spreadsheet
Amendment3complete.pdf PDF
Amendment 0002_28May2020.pdf PDF
Amendment 0001_27May2020.pdf PDF
Final W912P420B0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Buffalo CDF #4

W912P4-20-B-0009

Prebid Questions

1. The required grouted underlayer bottom elevation is at EL 574.5, or +5.3 feet above chart datum and the current water level is at that level. Can this elevation be raised up some to get the grout out of the water if water levels continue to rise?

ANSWER: "Grout should be placed as shown on the contract drawings."