Attached is the bid abstract, all three Bid Sheets are in the workbook and are tabbed at the bottom of the worksheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment.pdf | ||
| Fullamendment3.pdf | ||
| Amendment_No._1_-_W912P419B0005(17_June_2019).pdf | ||
| Amend1.docx | DOCX document | |
| Finalsol.pdf | ||
| FBO.govSOL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID A (1)
| Date Issued: | Date Opened | Page 1 of 1 | ||||||||
| Solicitation Number | 24-May-19 | |||||||||
| Revised ABSTRACT OF OFFERS - CONSTRUCTION | I CERTIFY that I have opened, read, and recorded on this abstract all offers received in | |||||||||
| W912P4-19-B-0005 | response to this solicitation. | |||||||||
| Issuing Office | Date Signed | |||||||||
| Department Of The Army | ||||||||||
| US Army Engineer District, Buffalo | O F F E R S | |||||||||
| 1776 Niagara Street | ||||||||||
| Buffalo, NY 14207-3199 | NO. 1 | NO. 2 | ||||||||
| Project Title | GOVERNMENT ESTIMATE | OFFEROR | OFFEROR | |||||||
| CHIVERS CONSTRUCTION | MORRISH WALLACE | |||||||||
| FY 19 Athol Springs Shoreline Protection | A. HIRED LABOR | FAIRVIEW, PA | CHEBOYGAN, MI | |||||||
| Buffalo NY | B. REASONABLE CONTRACT | BID SECURITY (type & amount) | BID SECURITY (type & amount) | |||||||
| XX | (without profit) | Bid bond - 20% of Bid | Bid bond - 20% of bid | |||||||
| NUMBER OF ADDENDA ISSUED: | C. REASONABLE CONTRACT | ADDENDA ACKNOWLEDGED | ADDENDA ACKNOWLEDGED | |||||||
| (including profit) | ||||||||||
| Item | Est. | Unit | Estimated | Unit | Estimated | Unit | Estimated | |||
| No. | Description of Offered Item | Quantity | Unit | Price | Amount | Price | Amout | Price | Amout | |
| Bidding Schedule | ||||||||||
| Schedule A | ||||||||||
| 1 | Mobilization and Demobilization | 1 | JA | $ 93,250.50 | $ 501,030.00 | $ 1,184,050.75 | ||||
| 2 | Record (As-built) Draw | 1 | JA | $ 68,918.80 | $ 67,600.00 | $ 67,825.00 | ||||
| 3 | Site Access Ramp | 1 | JA | $ 134,886.20 | $ 944,060.00 | $ 22,000.00 | ||||
| 4 | H-Piles | 366 | LF | $ 122.80 | $ 44,944.80 | $ 470.00 | $ 172,020.00 | $ 231.00 | $ 84,546.00 | |
| 5 | Geotextile STA | 5,500 | SF | $ 2.10 | $ 11,550.00 | $ 0.55 | $ 3,025.00 | $ 1.10 | $ 6,050.00 | |
| 6 | Trench for Toe Stone | 1,035 | LF | $ 60.85 | $ 62,979.75 | $ 22.00 | $ 22,770.00 | $ 66.00 | $ 68,310.00 | |
| 7 | Removals To Be Taken Off-Site | 1280 | TN | $ 122.40 | $ 156,672.00 | $ 22.00 | $ 28,160.00 | $ 33.00 | $ 42,240.00 | |
| 8 | Relocation of Natural Lit Mat | 1 | JA | $ 21,638.10 | $ 70,350.00 | $ 81,400.00 | ||||
| 9 | Concrete | 635 | CY | $ 920.85 | $ 584,739.75 | $ 1,140.00 | $ 723,900.00 | $ 1,375.00 | $ 873,125.00 | |
| 10 | Stone, STA. 3+00 to 13+00 | |||||||||
| 10A | Armor | 17,560 | TN | $ 183.95 | $ 3,224,643.50 | $ 175.00 | $ 3,067,750.00 | $ 154.00 | $ 2,699,620.00 | |
| 10B | Underlayer | 12,000 | TN | $ 131.75 | $ 1,581,000.00 | $ 180.00 | $ 2,160,000.00 | $ 85.80 | $ 1,029,600.00 | |
| 11 | Crushed Gravel STA | 81 | TN | $ 128.35 | $ 10,396.35 | $ 105.00 | $ 8,505.00 | $ 55.00 | $ 4,455.00 | |
| 12 | Impervious Fill | 2,650 | CF | $ 7.00 | $ 18,550.00 | $ 3.10 | $ 8,215.00 | $ 3.30 | $ 8,745.00 | |
| 13 | High Slump Concrete Fill | 15 | CY | $ 845.90 | $ 12,688.50 | $ 5,875.00 | $ 88,125.00 | $ 2,750.00 | $ 41,250.00 | |
| 14 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,103.40 | $ 31,034.00 | $ 11,830.00 | $ 118,300.00 | $ 11,880.00 | $ 118,800.00 | |
| 15 | Weep Holes | 50 | EA | $ 432.95 | $ 21,647.50 | $ 225.00 | $ 11,250.00 | $ 330.00 | $ 16,500.00 | |
| 16 | Project Fence w gates | 2,450 | LF | $ 15.15 | $ 37,117.50 | $ 6.40 | $ 15,680.00 | $ 9.90 | $ 24,255.00 | |
| 17 | Temp Con Fac and Controls | 1 | JA | $ 548,029.75 | $ 295,310.00 | $ 334,400.00 | ||||
| 18 | Seawall Patchs on top of Wall | 4 | EA | $ 1,203.40 | $ 4,813.60 | $ 3,795.00 | $ 15,180.00 | $ 2,750.00 | $ 11,000.00 | |
| 19 | Topsoil, seeding, scour Pro | 1,660 | SF | $ 2.80 | $ 4,648.00 | $ 5.40 | $ 8,964.00 | $ 3.30 | $ 5,478.00 | |
| 20 | Topsoil and Seeding | 2,205 | SF | $ 2.05 | $ 4,520.25 | $ 0.95 | $ 2,094.75 | $ 2.20 | $ 4,851.00 | |
| Total Estimated Amount (Items 1 ~ 20) | $ 6,678,668.85 | $ 8,332,288.75 | $ 6,728,500.75 | |||||||
| Option A | ||||||||||
| 21 | Additional Concrete for Inserting Bump | 7 | CY | $ 932.20 | $ 6,525.40 | $ 880.00 | $ 6,160.00 | $ 761.25 | $ 5,328.75 | |
| Option B | ||||||||||
| 22 | NYSDOT Orn Fence | 180 | LF | $ 362.65 | $ 65,277.00 | $ 530.00 | $ 95,400.00 | $ 514.50 | $ 92,610.00 | |
| Option C | ||||||||||
| 23 | ADA Ramp and Swing Gate | 1 | JA | $ 12,707.15 | $ 11,880.00 | $ 6,300.00 | ||||
| Option D | ||||||||||
| 24 | Toe Bars | 144 | EA | $ 531.05 | $ 76,471.20 | $ 445.00 | $ 64,080.00 | $ 435.75 | $ 62,748.00 | |
| Option E | ||||||||||
| 25 | Arch Treatment | 1,750 | SF | $ 14.05 | $ 24,587.50 | $ 28.50 | $ 49,875.00 | $ 18.90 | $ 33,075.00 | |
| Option F | ||||||||||
| 26 | Staning of Concrete Surfaces | 1,750 | SF | $ 4.85 | $ 8,487.50 | $ 13.50 | $ 23,625.00 | $ 9.45 | $ 16,537.50 | |
| Option G | ||||||||||
| 27 | Bronze Plaques | 5 | EA | $ 11,262.78 | $ 56,313.90 | $ 6,245.00 | $ 31,225.00 | $ 5,250.00 | $ 26,250.00 | |
| Option H | ||||||||||
| 28 | Engraving and Sealing | 5 | EA | $ 76,681.05 | $ 383,405.25 | $ 7,435.00 | $ 37,175.00 | $ 7,245.00 | $ 36,225.00 | |
| Option I | ||||||||||
| 29 | Anti-graffiti Protective Coating | 1 | JA | $ 50,107.44 | $ 50,107.44 | $ 9,860.00 | $ 5,775.00 | |||
| Option J | ||||||||||
| 30 | NYDOT Drainage | 1 | JA | $ 86,455.40 | $ 86,455.40 | $ 93,290.00 | $ 89,250.00 | |||
| Total Estimated Amount Option Items Only (21~30 | $ 770,337.74 | $ 422,570.00 | $ 374,099.25 | |||||||
| Option K | ||||||||||
| 31 | Geotextile | 7,080 | SF | $ 2.10 | $ 14,868.00 | $ 0.25 | $ 1,770.00 | $ 1.05 | $ 7,434.00 | |
| Option L | ||||||||||
| 32 | Trench for Toe Stone | 251 | LF | $ 61.75 | $ 15,499.25 | $ 15.50 | $ 3,890.50 | $ 63.00 | $ 15,813.00 | |
| Option M | ||||||||||
| 33 | Removals Off Site STA 0+00 to 3+00 | 320 | TN | $ 104.05 | $ 33,296.00 | $ 21.50 | $ 6,880.00 | $ 26.25 | $ 8,400.00 | |
| Option N | ||||||||||
| 34 | Relocation of Nat Litt Mat (STA0+00 to 3+00) | 1 | JA | $ 12,982.86 | $ 22,380.00 | $ 21,000.00 | ||||
| Option O | ||||||||||
| 35 | Stone STA 0+00 to 3+00 | |||||||||
| 35a | Armor | 3,020 | TN | $ 183.95 | $ 555,529.00 | $ 175.00 | $ 528,500.00 | $ 131.00 | $ 395,620.00 | |
| 35a | Underlayer | 2,231 | TN | $ 131.80 | $ 294,045.80 | $ 175.00 | $ 390,425.00 | $ 84.00 | $ 187,404.00 | |
| Option P | ||||||||||
| 36 | Crushed Gravel STA 0+00 to 3+00 | 160 | TN | $ 126.35 | $ 20,216.00 | $ 105.00 | $ 16,800.00 | $ 42.00 | $ 6,720.00 | |
| Option Q | ||||||||||
| 37 | Impervious Fill | 2350 | CF | $ 7.10 | $ 16,685.00 | $ 3.00 | $ 7,050.00 | $ 2.00 | $ 4,688.25 | |
| Option R | ||||||||||
| 38 | High Slump Con Fill STA 0+00 to 3+00 | 10 | CY | $ 845.92 | $ 8,459.20 | $ 5,830.00 | $ 58,300.00 | $ 1,995.00 | $ 19,950.00 | |
| Option S | ||||||||||
| 39 | Weep Holes 0+00 to 3+00 | 12 | EA | $ 431.70 | $ 5,180.40 | $ 225.00 | $ 2,700.00 | $ 315.00 | $ 3,780.00 | |
| Option T | ||||||||||
| 40 | Topsoil and Seeding Scour Protection | 1,245 | SF | $ 3.05 | $ 3,797.25 | $ 5.40 | $ 6,723.00 | $ 3.15 | $ 3,921.75 | |
| Option U | ||||||||||
| 41 | Topsoil and Seeding | 5,255 | SF | $ 1.95 | $ 10,247.25 | $ 0.95 | $ 4,992.25 | $ 2.10 | $ 11,035.50 | |
| Option V | ||||||||||
| 42 | High Slump Con Fill | 10 | CY | $ 845.92 | $ 8,459.20 | $ 5,875.00 | $ 58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option W | ||||||||||
| 43 | High Slump Con Fill | 10 | CY | $ 845.92 | $ 8,459.20 | $ 5,875.00 | $ 58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option X | ||||||||||
| 44 | High Slump Con Fill | 10 | CY | $ 845.92 | $ 8,459.20 | $ 5,875.00 | $ 58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option Y | ||||||||||
| 45 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,103.40 | $ 31,034.00 | $ 11,830.00 | $ 118,300.00 | $ 10,500.00 | $ 105,000.00 | |
| Option Z | ||||||||||
| 46 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,103.40 | $ 31,034.00 | $ 11,830.00 | $ 118,300.00 | $ 10,500.00 | $ 105,000.00 | |
| Option AA | ||||||||||
| 47 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,103.40 | $ 31,034.00 | $ 11,830.00 | $ 118,300.00 | $ 10,500.00 | $ 105,000.00 | |
| Total Estimated Amount Option Items Only (31~47 | $ 1,109,285.61 | $ 1,581,560.75 | $ 1,048,016.50 | |||||||
| Total Estimated Amount (Items 1 ~ 47) | $ 8,558,292.20 | $ 10,336,419.50 | $ 8,150,616.50 |
Bid B
| Issuing Office | Date Signed | |||||||||
| Department Of The Army | ||||||||||
| US Army Engineer District, Buffalo | O F F E R S | |||||||||
| 1776 Niagara Street | ||||||||||
| Buffalo, NY 14207-3199 | NO. 1 | NO. 2 | ||||||||
| Project Title | GOVERNMENT ESTIMATE | OFFEROR | OFFEROR | |||||||
| CHIVERS CONSTRUCTION | MORRISH WALLACE | |||||||||
| FY 19 Athol Springs Shoreline Protection | A. HIRED LABOR | FAIRVIEW, PA | CHEBOYGAN, MI | |||||||
| Buffalo NY | B. REASONABLE CONTRACT | BID SECURITY (type & amount) | BID SECURITY (type & amount) | |||||||
| XX | (without profit) | Bid bond - 20% of Bid | Bid bond - 20% of bid | |||||||
| NUMBER OF ADDENDA ISSUED: | C. REASONABLE CONTRACT | ADDENDA ACKNOWLEDGED | ADDENDA ACKNOWLEDGED | |||||||
| (including profit) | ||||||||||
| Item | Est. | Unit | Estimated | Unit | Estimated | Unit | Estimated | |||
| No. | Description of Offered Item | Quantity | Unit | Price | Amount | Price | Amout | Price | Amout | |
| Bidding Schedule | ||||||||||
| Schedule B | ||||||||||
| 1 | Mobilization and Demobilization | 1 | JA | $ 93,063.10 | $ 501,030.00 | $ 1,204,820.50 | ||||
| 2 | Record (As-built) Draw | 1 | JA | $ 68,780.30 | $ 67,600.00 | $ 84,600.00 | ||||
| 3 | Site Access Ramp | 1 | JA | $ 145,991.50 | $ 944,060.00 | $ 22,000.00 | ||||
| 4 | H-Piles | 366 | LF | $ 122.55 | $ 44,853.30 | $ 470.00 | $ 172,020.00 | $ 231.00 | $ 84,546.00 | |
| 5 | Geotextile STA | 5,500 | SF | $ 2.30 | $ 12,650.00 | $ 1.30 | $ 7,150.00 | $ 1.10 | $ 6,050.00 | |
| 6 | Trench for Toe Stone | 1,035 | LF | $ 67.05 | $ 69,396.75 | $ 22.00 | $ 22,770.00 | $ 66.00 | $ 68,310.00 | |
| 7 | Removals To Be Taken Off-Site | 1280 | TN | $ 129.10 | $ 165,248.00 | $ 22.00 | $ 28,160.00 | $ 33.00 | $ 42,240.00 | |
| 8 | Relocation of Natural Lit Mat | 1 | JA | $ 23,774.20 | $ 70,350.00 | $ 114,400.00 | ||||
| 9 | Concrete | 635 | CY | $ 919.00 | $ 583,565.00 | $ 1,140.00 | $ 723,900.00 | $ 1,375.00 | $ 873,125.00 | |
| 10 | Stone, STA. 3+00 to 13+00 | |||||||||
| 10A | Armor | 17,560 | TN | $ 188.70 | $ 3,307,911.00 | $ 425.00 | $ 7,450,250.00 | $ 148.00 | $ 2,594,440.00 | |
| 10B | Underlayer | 12,000 | TN | $ 132.15 | $ 1,585,800.00 | $ 204.00 | $ 2,448,000.00 | $ 85.80 | $ 1,029,600.00 | |
| 11 | Crushed Gravel STA | 81 | TN | $ 141.35 | $ 11,449.35 | $ 105.00 | $ 8,505.00 | $ 55.00 | $ 4,455.00 | |
| 12 | Impervious Fill | 2,650 | CF | $ 7.85 | $ 20,802.50 | $ 3.10 | $ 8,215.00 | $ 3.30 | $ 8,745.00 | |
| 13 | High Slump Concrete Fill | 15 | CY | $ 920.35 | $ 13,805.25 | $ 5,875.00 | $ 88,125.00 | $ 2,750.00 | $ 41,250.00 | |
| 14 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,097.70 | $ 30,977.00 | $ 11,830.00 | $ 118,300.00 | $ 11,880.00 | $ 118,800.00 | |
| 15 | Weep Holes | 50 | EA | $ 432.10 | $ 21,605.00 | $ 225.00 | $ 11,250.00 | $ 330.00 | $ 16,500.00 | |
| 16 | Project Fence w gates | 2,450 | LF | $ 15.10 | $ 36,995.00 | $ 6.40 | $ 15,680.00 | $ 9.90 | $ 24,255.00 | |
| 17 | Temp Con Fac and Controls | 1 | JA | $ 605,110.24 | $ 295,310.00 | $ 334,400.00 | ||||
| 18 | Seawall Patchs on top of Wall | 4 | EA | $ 1,201.00 | $ 4,804.00 | $ 3,795.00 | $ 15,180.00 | $ 2,750.00 | $ 11,000.00 | |
| 19 | Topsoil, seeding, scour Pro | 1,660 | SF | $ 2.80 | $ 4,648.00 | $ 5.40 | $ 8,964.00 | $ 3.30 | $ 5,478.00 | |
| 20 | Topsoil and Seeding | 2,205 | SF | $ 2.80 | $ 4,520.25 | $ 0.95 | $ 2,094.75 | $ 2.20 | $ 4,851.00 | |
| 21 | Geotextile STA | 3,100 | SF | $ 2.30 | $ 7,130.00 | $ 0.30 | $ 930.00 | $ 1.10 | $ 3,410.00 | |
| 22 | Trench for Toe Stone | 251 | LF | $ 68.05 | $ 17,080.55 | $ 16.40 | $ 4,116.40 | $ 77.00 | $ 19,327.00 | |
| 23 | Removals To Be Taken Off-Site | 320 | TN | $ 109.20 | $ 34,944.00 | $ 21.50 | $ 6,880.00 | $ 27.50 | $ 8,800.00 | |
| 24 | Relocation of Natural Lit Mat | 1 | JA | $ 14,264.50 | $ 22,380.00 | $ 55,000.00 | ||||
| 25 | stone, STA. 0+00 to 3+00 | |||||||||
| 25a | Armor | 3,020 | TN | $ 197.20 | $ 595,544.00 | $ 175.00 | $ 528,500.00 | $ 148.00 | $ 446,960.00 | |
| 25b | Underlayer | 2,231 | TN | $ 133.45 | $ 297,726.95 | $ 185.00 | $ 412,735.00 | $ 92.40 | $ 206,144.40 | |
| 26 | High Slump Concrete Fill | 10 | CY | $ 920.35 | $ 9,203.50 | $ 5,875.00 | $ 58,750.00 | $ 2,200.00 | $ 22,000.00 | |
| 27 | Weep Holes | 12 | EA | $ 430.80 | $ 5,169.60 | $ 225.00 | $ 2,700.00 | $ 357.50 | $ 4,290.00 | |
| Total Estimated Amount (Items 1 ~ 27) | $ 7,836,812.84 | $ 14,043,905.15 | $ 7,459,796.90 | |||||||
| Option A | ||||||||||
| 28 | Additional Concrete for Inserting Bump | 7 | CY | $ 930.30 | $ 6,512.10 | $2,005.00 | $14,035.00 | $ 761.25 | $ 5,328.75 | |
| Option B | ||||||||||
| 29 | NYSDOT Orn Fence | 180 | LF | $ 361.90 | $ 65,142.00 | $315.00 | $56,700.00 | $ 514.50 | $ 92,610.00 | |
| Option C | ||||||||||
| 30 | ADA Ramp and Swing Gate | 1 | JA | $ 12,681.60 | $9,625.00 | $ 6,300.00 | ||||
| Option D | ||||||||||
| 31 | Toe Bars | 144 | EA | $ 530.00 | $ 76,320.00 | $440.00 | $63,360.00 | $ 435.75 | $ 62,748.00 | |
| Option E | ||||||||||
| 32 | Arch Treatment | 1,750 | SF | $ 14.00 | $ 24,500.00 | $28.50 | $49,875.00 | $ 18.90 | $ 33,075.00 | |
| Option F | ||||||||||
| 33 | Staning of Concrete Surfaces | 1,750 | SF | $ 4.80 | $ 8,400.00 | $13.50 | $23,625.00 | $ 9.45 | $ 16,537.50 | |
| Option G | ||||||||||
| 34 | Bronze Plaques | 5 | EA | $ 11,240.15 | $ 56,200.75 | $6,245.00 | $31,225.00 | $ 5,250.00 | $ 26,250.00 | |
| Option H | ||||||||||
| 35 | Engraving and Sealing | 5 | EA | $ 76,526.95 | $ 382,634.75 | $7,435.00 | $37,175.00 | $ 7,245.00 | $ 36,225.00 | |
| Option I | ||||||||||
| 36 | Anti-graffiti Protective Coating | 1 | JA | $ 50,006.75 | $9,860.00 | $ 5,775.00 | ||||
| Option J | ||||||||||
| 37 | NYDOT Drainage | 1 | JA | $ 86,281.65 | $93,290.00 | $ 89,250.00 | ||||
| Total Estimated Amount Option Items Only (28~37 | $ 768,679.60 | $388,770.00 | $ 374,099.25 | |||||||
| Option K | ||||||||||
| 38 | Geotextile | 3,980 | SF | $ 2.05 | $ 8,159.00 | $0.15 | $597.00 | $ 1.05 | $ 4,179.00 | |
| Option L | ||||||||||
| 39 | Crushed Gravel STA 0+00 to 3+00 | 160 | TN | $ 126.10 | $ 20,176.00 | $105.00 | $16,800.00 | $ 47.25 | $ 7,560.00 | |
| Option M | ||||||||||
| 40 | Impervious Fill | 2,350 | CF | $ 7.10 | $ 16,685.00 | $3.00 | $7,050.00 | $ 2.10 | $ 4,935.00 | |
| Option N | ||||||||||
| 41 | Topsoil, Seeding, Scour Protection | 1,245 | SF | $ 3.05 | $ 3,797.25 | $5.40 | $6,723.00 | $ 3.15 | $ 3,921.75 | |
| Option O | ||||||||||
| 42 | Topsoil and Seeding | 5,255 | SF | $ 1.95 | $ 10,247.25 | $0.95 | $4,992.25 | $ 2.10 | $ 11,035.50 | |
| Option P | ||||||||||
| 43 | High Slump Concrete Fill | 10 | CY | $ 844.20 | $ 8,442.00 | $5,875.00 | $58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option Q | ||||||||||
| 44 | High Slump Concrete Fill | 10 | CY | $ 844.20 | $ 8,442.00 | $5,875.00 | $58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option R | ||||||||||
| 45 | High Slump Concrete Fill | 10 | CY | $ 844.20 | $ 8,442.00 | $5,875.00 | $58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option S | ||||||||||
| 46 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,097.15 | $ 30,971.50 | $11,830.00 | $118,300.00 | $ 11,025.00 | $ 110,250.00 | |
| Option T | ||||||||||
| 47 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,097.15 | $ 30,971.50 | $11,830.00 | $118,300.00 | $ 11,025.00 | $ 110,250.00 | |
| Option U | ||||||||||
| 48 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,097.15 | $ 30,971.50 | $11,830.00 | $118,300.00 | $ 11,025.00 | $ 110,250.00 | |
| Total Estimated Amount Option Items Only (38~48 | $ 177,305.00 | $567,312.25 | $ 409,631.25 | |||||||
| Total Estimated Amount (Items 1 ~ 48) | $ 8,782,797.44 | $14,999,987.40 | $ 8,243,527.40 | |||||||
| 44 | ||||||||||
| 45 | ||||||||||
| 46 | ||||||||||
| 47 |
Bid c
| W912P4-19-B-0005 | response to this solicitation. | |||||||||
| Issuing Office | Date Signed | |||||||||
| Department Of The Army | ||||||||||
| US Army Engineer District, Buffalo | O F F E R S | |||||||||
| 1776 Niagara Street | ||||||||||
| Buffalo, NY 14207-3199 | NO. 1 | NO. 2 | ||||||||
| Project Title | GOVERNMENT ESTIMATE | OFFEROR | OFFEROR | |||||||
| CHIVERS CONSTRUCTION | MORRISH WALLACE | |||||||||
| FY 19 Athol Springs Shoreline Protection | A. HIRED LABOR | FAIRVIEW, PA | CHEBOYGAN, MI | |||||||
| Buffalo NY | B. REASONABLE CONTRACT | BID SECURITY (type & amount) | BID SECURITY (type & amount) | |||||||
| XX | (without profit) | Bid bond - 20% of Bid | Bid bond - 20% of bid | |||||||
| NUMBER OF ADDENDA ISSUED: | C. REASONABLE CONTRACT | ADDENDA ACKNOWLEDGED | ADDENDA ACKNOWLEDGED | |||||||
| (including profit) | ||||||||||
| Item | Est. | Unit | Estimated | Unit | Estimated | Unit | Estimated | |||
| No. | Description of Offered Item | Quantity | Unit | Price | Amount | Price | Amout | Price | Amout | |
| Bidding Schedule | ||||||||||
| Schedule A | ||||||||||
| 1 | Mobilization and Demobilization | 1 | JA | $ 93,036.50 | $ 501,030.00 | $ 1,209,877.65 | ||||
| 2 | Record (As-built) Draw | 1 | JA | $ 68,760.60 | $ 67,600.00 | $ 62,000.00 | ||||
| 3 | Site Access Ramp | 1 | JA | $ 145,949.75 | $ 944,060.00 | $ 22,000.00 | ||||
| 4 | H-Piles | 366 | LF | $ 122.50 | $ 44,835.00 | $ 470.00 | $ 172,020.00 | $ 231.00 | $ 84,546.00 | |
| 5 | Geotextile STA | 5,500 | SF | $ 2.30 | $ 12,650.00 | $ 1.50 | $ 8,250.00 | $ 1.10 | $ 6,050.00 | |
| 6 | Trench for Toe Stone | 1,035 | LF | $ 67.00 | $ 69,345.00 | $ 22.00 | $ 22,770.00 | $ 66.00 | $ 68,310.00 | |
| 7 | Removals To Be Taken Off-Site | 1280 | TN | $ 129.05 | $ 165,184.00 | $ 22.00 | $ 28,160.00 | $ 33.00 | $ 42,240.00 | |
| 8 | Relocation of Natural Lit Mat | 1 | JA | $ 23,767.40 | $ 70,350.00 | $ 114,400.00 | ||||
| 9 | Concrete | 635 | CY | $ 918.75 | $ 583,406.25 | $ 1,140.00 | $ 723,900.00 | $ 1,375.00 | $ 873,125.00 | |
| 10 | Stone, STA. 3+00 to 13+00 | |||||||||
| 10A | Armor | 17,530 | TN | $ 188.63 | $ 3,306,683.90 | $ 425.00 | $ 7,450,250.00 | $ 153.00 | $ 2,682,090.00 | |
| 10B | Underlayer | 12,000 | TN | $ 132.10 | $ 1,585,200.00 | $ 210.00 | $ 2,520,000.00 | $ 88.00 | $ 1,056,000.00 | |
| 11 | Crushed Gravel STA | 81 | TN | $ 141.30 | $ 11,445.30 | $ 105.00 | $ 8,505.00 | $ 55.00 | $ 4,455.00 | |
| 12 | Impervious Fill | 2,650 | CF | $ 7.85 | $ 20,802.50 | $ 3.90 | $ 10,335.00 | $ 3.30 | $ 8,745.00 | |
| 13 | High Slump Concrete Fill | 15 | CY | $ 920.10 | $ 13,801.50 | $ 5,875.00 | $ 88,125.00 | $ 2,750.00 | $ 41,250.00 | |
| 14 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,096.30 | $ 30,963.00 | $ 11,830.00 | $ 118,300.00 | $ 11,880.00 | $ 118,800.00 | |
| 15 | Weep Holes | 50 | EA | $ 432.95 | $ 21,600.00 | $ 225.00 | $ 11,250.00 | $ 330.00 | $ 16,500.00 | |
| 16 | Project Fence w gates | 2,450 | LF | $ 15.10 | $ 36,995.00 | $ 6.40 | $ 15,680.00 | $ 9.90 | $ 24,255.00 | |
| 17 | Temp Con Fac and Controls | 1 | JA | $ 604,937.10 | $ 295,310.00 | $ 334,400.00 | ||||
| 18 | Seawall Patchs on top of Wall | 4 | EA | $ 1,200.65 | $ 4,802.60 | $ 3,795.00 | $ 15,180.00 | $ 2,750.00 | $ 11,000.00 | |
| 19 | Topsoil, seeding, scour Pro | 1,660 | SF | $ 2.80 | $ 4,648.00 | $ 5.40 | $ 8,964.00 | $ 3.30 | $ 5,478.00 | |
| 20 | Topsoil and Seeding | 2,205 | SF | $ 2.05 | $ 4,520.25 | $ 0.95 | $ 2,094.75 | $ 2.20 | $ 4,851.00 | |
| Total Estimated Amount (Items 1 ~ 20) | $ 6,853,333.65 | $ 13,082,133.75 | $ 6,790,372.65 | |||||||
| Option A | ||||||||||
| 21 | Additional Concrete for Inserting Bump | 7 | CY | $ 930.05 | $ 6,510.35 | $ 2,005.00 | $ 14,035.00 | $ 761.25 | $ 5,328.75 | |
| Option B | ||||||||||
| 22 | NYSDOT Orn Fence | 180 | LF | $ 361.80 | $ 65,124.00 | $ 315.00 | $ 56,700.00 | $ 514.50 | $ 92,610.00 | |
| Option C | ||||||||||
| 23 | ADA Ramp and Swing Gate | 1 | JA | $ 12,678.00 | $ 9,625.00 | $ 6,300.00 | ||||
| Option D | ||||||||||
| 24 | Toe Bars | 144 | EA | $ 529.85 | $ 76,298.40 | $ 440.00 | $ 63,360.00 | $ 435.75 | $ 62,748.00 | |
| Option E | ||||||||||
| 25 | Arch Treatment | 1,750 | SF | $ 14.00 | $ 24,500.00 | $ 28.50 | $ 49,875.00 | $ 18.90 | $ 33,075.00 | |
| Option F | ||||||||||
| 26 | Staning of Concrete Surfaces | 1,750 | SF | $ 4.80 | $ 8,400.00 | $ 13.50 | $ 23,625.00 | $ 9.45 | $ 16,537.50 | |
| Option G | ||||||||||
| 27 | Bronze Plaques | 5 | EA | $ 11,236.95 | $ 56,184.75 | $ 6,245.00 | $ 31,225.00 | $ 5,250.00 | $ 26,250.00 | |
| Option H | ||||||||||
| 28 | Engraving and Sealing | 5 | EA | $ 76,505.06 | $ 382,525.30 | $ 7,435.00 | $ 37,175.00 | $ 7,245.00 | $ 36,225.00 | |
| Option I | ||||||||||
| 29 | Anti-graffiti Protective Coating | 1 | JA | $ 49,992.44 | $ 9,860.00 | $ 5,775.00 | ||||
| Option J | ||||||||||
| 30 | NYDOT Drainage | 1 | JA | $ 86,256.97 | $ 86,455.40 | $ 93,290.00 | $ 89,250.00 | |||
| Total Estimated Amount Option Items Only (21~30 | $ 768,470.21 | $ 388,770.00 | $ 374,099.25 | |||||||
| Option K | ||||||||||
| 31 | Geotextile | 7,080 | SF | $ 2.10 | $ 14,868.00 | $ 0.25 | $ 1,770.00 | $ 1.05 | $ 7,434.00 | |
| Option L | ||||||||||
| 32 | Trench for Toe Stone | 251 | LF | $ 86.95 | $ 21,824.45 | $ 15.50 | $ 3,890.50 | $ 63.00 | $ 15,813.00 | |
| Option M | ||||||||||
| 33 | Removals Off Site STA 0+00 to 3+00 | 320 | TN | $ 126.60 | $ 40,512.00 | $ 21.50 | $ 6,880.00 | $ 26.25 | $ 8,400.00 | |
| Option N | ||||||||||
| 34 | Relocation of Nat Litt Mat (STA0+00 to 3+00) | 1 | JA | $ 19,013.90 | $ 22,380.00 | $ 21,000.00 | ||||
| Option O | ||||||||||
| 35 | Stone STA 0+00 to 3+00 | |||||||||
| 35a | Armor | 3,020 | TN | $ 198.80 | $ 600,376.00 | $ 175.00 | $ 528,500.00 | $ 131.00 | $ 395,620.00 | |
| 35a | Underlayer | 2,231 | TN | $ 140.75 | $ 314,013.25 | $ 175.00 | $ 390,425.00 | $ 81.90 | $ 182,718.90 | |
| Option P | ||||||||||
| 36 | Crushed Gravel STA 0+00 to 3+00 | 160 | TN | $ 126.05 | $ 20,168.00 | $ 105.00 | $ 16,800.00 | $ 42.00 | $ 6,720.00 | |
| Option Q | ||||||||||
| 37 | Impervious Fill | 2350 | CF | $ 7.10 | $ 16,685.00 | $ 3.00 | $ 7,050.00 | $ 2.00 | $ 4,688.25 | |
| Option R | ||||||||||
| 38 | High Slump Con Fill STA 0+00 to 3+00 | 10 | CY | $ 1,094.74 | $ 10,947.40 | $ 583.00 | $ 5,830.00 | $ 1,995.00 | $ 19,950.00 | |
| Option S | ||||||||||
| 39 | Weep Holes 0+00 to 3+00 | 12 | EA | $ 558.85 | $ 6,706.20 | $ 225.00 | $ 2,700.00 | $ 315.00 | $ 3,780.00 | |
| Option T | ||||||||||
| 40 | Topsoil and Seeding Scour Protection | 1,245 | SF | $ 3.05 | $ 3,797.25 | $ 5.40 | $ 6,723.00 | $ 3.15 | $ 3,921.75 | |
| Option U | ||||||||||
| 41 | Topsoil and Seeding | 5,255 | SF | $ 1.95 | $ 10,247.25 | $ 0.95 | $ 4,992.25 | $ 2.10 | $ 11,035.50 | |
| Option V | ||||||||||
| 42 | High Slump Con Fill | 10 | CY | $ 843.95 | $ 8,439.50 | $ 5,875.00 | $ 58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option W | ||||||||||
| 43 | High Slump Con Fill | 10 | CY | $ 843.95 | $ 8,439.50 | $ 5,875.00 | $ 58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option X | ||||||||||
| 44 | High Slump Con Fill | 10 | CY | $ 843.95 | $ 8,439.50 | $ 5,875.00 | $ 58,750.00 | $ 1,575.00 | $ 15,750.00 | |
| Option Y | ||||||||||
| 45 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,096.30 | $ 30,963.00 | $ 11,830.00 | $ 118,300.00 | $ 10,500.00 | $ 105,000.00 | |
| Option Z | ||||||||||
| 46 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,096.30 | $ 30,963.00 | $ 11,830.00 | $ 118,300.00 | $ 10,500.00 | $ 105,000.00 | |
| Option AA | ||||||||||
| 47 | Shotcrete (Seawall Crack Fill) | 10 | CY | $ 3,096.30 | $ 30,963.00 | $ 11,830.00 | $ 118,300.00 | $ 10,500.00 | $ 105,000.00 | |
| Total Estimated Amount Option Items Only (31~47 | $ 1,197,366.20 | $ 1,529,090.75 | $ 1,043,331.40 | |||||||
| Total Estimated Amount (Items 1 ~ 47) | $ 8,819,170.06 | $ 14,999,994.50 | $ 8,207,803.30 |