Q A_2.docx
DOCX document 14 KB Posted
- Attached to
- Modular Facility Lease
- Solicitation number
- W912NS16Q3035
About this file
Response to questions ( 2)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_3_-_Revised_Statement_of_Work.docx | DOCX document | |
| Q A_2_(corrected).docx | DOCX document | |
| Q A.docx | DOCX document | |
| Attachment_1_-Clauses.pdf | ||
| Attachment_2_-_Statement_of_Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912NS-16-Q-3035
QUESTIONS AND ANSWERS
1. Is this requirement similar to a current contract at the 139th? If so, can you please provide the contract #?
a. Yes, this requirement is similar to those of W912NS-15-P-0083. The new facility must be parallel (on the north side) with the current facility w/ a 9ft gap between facilities.
2. Is the Government accepting “USE” facilities or only “NEW” for this requirement?
a. The government will accept NEW or USED facilities, as long as the carpet is NEW and the facility is in good operating condition.
3. Does this facility require any SCIF requirements for the “secured communications”?
a. There are NO SCIF requirements
4. Are you wanting steps, decks and HC ramps? If so, will pressure treated wood be acceptable?
a. Yes, steps only required on the north side of the facility. Yes, pressure treated wood steps will be acceptable.
5. Does the Government currently have a site plan showing utility locations?
a. Utilities will be ran to the facility under a separate contract.
6. Does the Government currently have a drawing of the proposed modular building?
a. No, the government does not have a drawing of the proposed building.
7. Does this facility need to meet the ATFP requirements?
a. ATFP must be met, but only under “temporary facility” requirements
8. UFC states that all buildings over 5,000 s/f require a Sprinkler and Fire Alarm. Is the Government providing these on a separate contract?
a. Fire alarm will be provided under a separate contract. No sprinkler system will be required in this facility.