Attachment_2_-_Statement_of_Work.docx

DOCX document 27 KB Posted

Attached to
Modular Facility Lease
Solicitation number
W912NS16Q3035
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
Attachment_3_-_Revised_Statement_of_Work.docx DOCX document
Q A_2_(corrected).docx DOCX document
Q A_2.docx DOCX document
Q A.docx DOCX document
Attachment_1_-Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modular Facility

STATEMENT OF WORK

(SOW)

29 July 2016

Delivered and installed Americans with Disabilities Act (ADA) compliant modular facility with annual lease of one year with four option years executed annually, delivered to 705 Memorial Drive Saint Joseph, MO 64503. The building will need to be setup on an asphalt with 16" x 16" ABS Foundation Pads with double dry stack Concrete Masonry Unit (CMU) block.

Requirement of blended office and teaching space with the following salient characteristics:

--Three (3) 1000 sq ft office rooms with electric hookups sufficient for twenty workstations each that can accommodate 20 personnel in office configured cubicles to be contracted separately --Twelve (12) 120 sq ft office rooms with electric hookups sufficient for 1 workstation each --Two (2) 1000 sq ft rooms with sufficient electric hookups for briefing room/conference room configuration that can accommodate 40 personnel with furniture to be contracted separately for SIL.

--Four (4) restrooms (two male and two female) capable of accommodating 1 person each --One (1) 120 sq ft communications room for infrastructure for both non-secure and secure communication lines to be configured by separate entity as required for accommodation of resident personnel --Heating, Ventilation and Air Conditioning for all space with integrated ducting and external portion of units configured externally and/or side or roof attached to facility --sufficient support structure and load-bearing dispersion to be securely and adequately assembled on asphalt parking space with dispersion not to exceed load standards of pavement which will maintain balance and leveling without compromising pavement integrity and settling -- sufficient electric, water and sewage hookups to include heat tape on water/sewage lines for cold weather within approx. 150 ft of site selected --capability to configure communications, audio and visual equipment for briefing, instruction and education settings as required for the Advanced Airlift Tactics Training Center (AATTC) --new carpet throughout facility AT/FP Provision All contractor employees, to include subcontractor employees, requiring access to 139th Airlift Wing installations, facilities and controlled access areas shall be offered AT Level I awareness training upon receiving the bid for work/service. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, upon completion of training.

The language used shall be "IAW ANGI 10‐245 DoD contractors shall be provided AT information as required by DFAR, Section 252.225‐7043. Level I ‐ AT Awareness Training shall be offered to all DoD contractor employees in the terms and conditions of the contract. AT Awareness Training may be accomplished by either a Level I ‐ qualified instructor, or by completing the “Force Protection” computer based training (CBT) course on the Advanced Distributed Learning System (ADLS) or the Defense Technical Information Center (DTIC). Individuals without access to NIPR, possessing a CAC card, nor enrolled in DEERS can access the training at the following website: http://jko.jten.mil " Contractor and all associated sub‐contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Security Forces only. Contractors will complete the Police Records Check request form a minimum of 2 weeks ahead of start date. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204 9, Personal Identity Verification of Contractor Personnel) as directed by DOD, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using DTM 09‐012, Physical Access Control, DoD Civilian Personnel and/or Contractors are required a National Agency Check with Inquiries (NACI) or Office of Personnel Management (OPM) Tier I standards, when implemented. Local security policies and procedures (provided by government representative).

"Contractors must return all local access credentials to the issuing office when the contract is completed or when a contractor employee no longer requires access to the installation (e.g., quits or the contract is terminated). If a local access credential is not returned, the Installation Commander may consider debarment."

image1.png

File details come from the government source that posted it. Updated .