Date: RFI No.

RFP Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE

6/25/2018 1 Is the Chiller brand specific or it can be any manufacturer?

Called out per the spec section 2.1

6/25/2018 2 Will the pumps be changed out during this project?

Pumps to be replaced per the SOW.

6/25/2018 3

If so, will there be a few hours this building will be down to do the changeover to the temporary unit and bypassing the existing pumps?

Accommodations for switchover will be made during non-duty hours Fridays are a good time for this type of work.

Must be coordinated with CE in advance.