QUESTIONS AND ANSWERS BASED ON SITE VISIT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912L5-15-R-0107_SOLICITATION.pdf | ||
| SOW_for_Joint_Repairs.pdf | ||
| W912L5-15-R-0107_SITE_VISIT_LIST_10SEP15.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11 September 2015
MEMORANDUM FOR Prospective Offers
FROM: 166 MSG/MSC 2600 Spruance Drive New Castle, Delaware 19720-1615
SUBJECT: Airfield Painting Q & A
1. The following questions were asked by prospective offers and are answered by this office:
QUESTION: 1. If the contractor wins both bids, can the work be done at the same time since the section will be closed?
ANSWER: Yes
QUESTION: 2. Does the contract require a sawed or routed joint to be placed between the concrete and the asphalt?
ANSWER: All repairs will be in accordance with UFC 3-250-08FA 16 January 2004.
QUESTION: 3. Where the concrete is not level with the asphalt, what does this contract expect to be done to rectify the situation? What are the joint expectations?
ANSWER: no repair is required in those locations
QUESTION: 4. Is backer rod required in this contract?
ANSWER: yes, in accordance with UFC 3-250-08FA 16 January 2004.
QUESTION: 5. What is the expectation for old crack material removal?
ANSWER: remove and dispose of old material off site
QUESTION: 6. Is 3405 or 6692 type 2 accepted for this project?
ANSWER: See Appendix B of UFC 3-250-08FA 16 January 2004 for the Sealant Reference Table
QUESTION: 7. If sawing the joint is expected or required, what is the width desired for the joint? 3/8" or 1/2" or did you have another width in mind?
ANSWER: 3/8
QUESTION: 8. Will the planes be moved off of the sections that are being worked on or will the contractor be required to work around the aircraft?
ANSWER: Aircraft will be moved as needed and will be determined as part of the preconstruction meeting after the project has been awarded
COMMENT: Work will have to be in stages in order to accommodate schedules ( i.e Flying).
2. If you have further questions, please e-mail them to MSgt Amy Kline at amy.l.kline.mil@mail.mil
AMY L KLINE, MSGT, DANG
Contracting Officer