F6S3CE6173A001 FWJH069194A
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to post the answ ers to the questions that w ere submitted for this requirement. All bids must also include a signed copies of any and all amendments to the solicitation. All other terms and conditions remain.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L1-17-B-0001
X 9B. DATED (SEE ITEM 11)
09-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jul-2017
CODE
USPFO FOR TEXAS
CONTRACTING BRANCH
2200 WEST 35TH STREET
BLDG 66
AUSTIN TX 78703-1222
W912L1 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTIN
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION C
The following have been added by full
QUESTIONS AND ANSWERS
Questions and Answers for Soli
1. As per item #0005 states that t
Answer: The awarded vendor Contractor Manpower Reporti associated with providing the i Secretary of the Army (Manpo collection site where the contr manpower) required for perfor information in the forma using their estimated price associated labor hours and associated cos
2. Is there chases or block outs pr thru engine shop/tool room?
Answer: The refrigerant pipin room. The piping shall be rou piping shall be concealed insid partitions. Contractor will be r No fittings shall be installed in
3. Does the mini split ductless sy
NUATION PAGE
ONTRACT FORM
text:
icitation Number: W912L1‐17‐B‐0001 there will be a one-time administrative cost allowed. Pleas r will be required to comply with the Army’s policy for ing. The vendor is allowed a onetime fee for the administr information online. See below for details: “The Office of ower & Reserve Affairs) operates and maintains a secure A actor will report ALL contractor manpower (including su rmance of this contract. The contractor is required to com g the following web address: https://cmra.army.mil. The v d with inputting the required number of contractor employ st data in regards to this requirement.
rovided that can be used to route the drains and or refrige ng and condensate piping will be exposed to view in the en uted neatly along the wall through this space. In the Train de the metal-stud walls that form the door pockets for the responsible to restore the wall to its original state after ins nside the wall. The wall is shown in the image below.
ystems for training rooms 224,225 and 226 requires heatin
W912L1-17-B-0001 se verify amounts.
rative cost the Assistant Army data ubcontractor mpletely fill in all the vendor must provide yees using direct rant line sets down ngine shop / tool ning rooms, the accordion wall stalling the piping.
ng?
W912L1-17-B-0001
Answer: No. Heat is provided by existing FCU 2-2. The mini-split systems are to be installed to provide supplemental cooling in these spaces, but are not required to provide supplemental heating.
4. On page 3 of 5 (statement of work) line item 6.b.iv. states to run condensate out thru exterior wall near grade. Does it require having a French drain?
Answer: A French Drain is not required. The discharge should be above grade and A splash block shall be provided at the condensate discharge.
5. On page 3 of 5 (statement of work) line item 6.b.iv. states to route insulated refrigerant line sets thru exterior wall to condensing units. Does it require having sleeves thru exterior wall and a metal shroud cover?
Answer: Penetrations through the wall should be sealed water tight. Sleeves are not required, but the annual space shall be filled with joint sealant and back-up material.