Q A_14Sept.pdf

PDF 68 KB Posted

Attached to
KYANG Building 800 Renovation
Solicitation number
W912KZ-16-R-0006
Issued by

About this file

Questions and Answers as of 14 September

View the file

Other files

File Type Posted
Bldg_800_roof.pdf PDF
W912KZ-16-R-0006-0001.pdf PDF
Site_Visit_Sign-in_Sheet.pdf PDF
Q A_2Sept.pdf PDF
7_-_Project_description _photos.pdf PDF
EXHIBIT_B.doc DOC document
EXHIBIT_A.doc DOC document
W912KZ-16-R-0006.pdf PDF
EXHIBIT_C.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #W912KZ-16-R-0006

Kentucky Air National Guard Building 800 Renovation Project

Q&A

Question: There is a combination of water closets existing at Bldg. 800. Some are standard 15” rim height and others are ADA 17” rim height. Would the owner prefer to replace all of the water closets with 17” rim heights, not just in the ADA stalls? Or would they prefer to have 15” WCs in the standard stalls and 17” only in the ADA stalls?

Answer: Replace all toilets with 17" rim heights

Question: The existing urinals are supplied by ½” lines coming out of the walls. All standard urinal flush valves today call for ¾” water supplies. We have no idea what size piping is located behind the walls or how far back we would need to go to find larger water lines. How does the owner prefer that we bid this in order to use new flush valves?

Answer: Resolved

Question: Please verify that the mop sink in the Men’s RR janitor closet gets replaced?

Answer: Replace with new sink and fixture

Question: Where is the 12th air handler? We only seen 11 condensers and 11 indoor units.

Answer: There are 11 air handlers and 11 AC Units...that was a mistake in original scope

Question: Do we need to replace the disconnects on the outdoor units and seal-tite whips?

Answer: Yes, replace the disconnects and whips

Question: I would presume we are to replace all the refrigerant lines? (this is the correct way to complete this project) Answer: Yes, replace refrigerant lines

Question: Can we reconnect to the existing PVC Flue/Intake Piping?

Answer: Yes, provided existing flue is up to code and it is permitted to do so

Question: The only duct to be replaced is at the unit and connecting to existing duct?

Answer: Yes, use existing duct as much as possible

Question: Is there any work associated with the two condensers on the roof?

Answer: No, those are new

Question: Since we are removing and replacing the lights in the foyer and restrooms, do we replace the existing lights or supply new lights? If new what type or do we include and allowance per light fixture?

Answer: Replace light fixtures with new, contractor to provide submittals. We are looking for a fixture that modestly dresses up that foyer and restrooms while being energy efficient.

Question: In room 1405, the SOW says to replace carpet, but at the pre bid meeting it was mentioned to remove carpet and replace with ceramic tile. Which do we do?

Answer: Replace with ceramic tile similar to foyer (neutral beige color ceramic)

Question: In room 1405, do we remove and replace the ceiling grid and tile, tile only or repair as needed?

Answer: Replace tile and repair existing grid as required