Q A_14Sept.pdf
PDF 68 KB Posted
- Attached to
- KYANG Building 800 Renovation
- Solicitation number
- W912KZ-16-R-0006
About this file
Questions and Answers as of 14 September
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg_800_roof.pdf | ||
| W912KZ-16-R-0006-0001.pdf | ||
| Site_Visit_Sign-in_Sheet.pdf | ||
| Q A_2Sept.pdf | ||
| 7_-_Project_description _photos.pdf | ||
| EXHIBIT_B.doc | DOC document | |
| EXHIBIT_A.doc | DOC document | |
| W912KZ-16-R-0006.pdf | ||
| EXHIBIT_C.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #W912KZ-16-R-0006
Kentucky Air National Guard Building 800 Renovation Project
Q&A
Question: There is a combination of water closets existing at Bldg. 800. Some are standard 15” rim height and others are ADA 17” rim height. Would the owner prefer to replace all of the water closets with 17” rim heights, not just in the ADA stalls? Or would they prefer to have 15” WCs in the standard stalls and 17” only in the ADA stalls?
Answer: Replace all toilets with 17" rim heights
Question: The existing urinals are supplied by ½” lines coming out of the walls. All standard urinal flush valves today call for ¾” water supplies. We have no idea what size piping is located behind the walls or how far back we would need to go to find larger water lines. How does the owner prefer that we bid this in order to use new flush valves?
Answer: Resolved
Question: Please verify that the mop sink in the Men’s RR janitor closet gets replaced?
Answer: Replace with new sink and fixture
Question: Where is the 12th air handler? We only seen 11 condensers and 11 indoor units.
Answer: There are 11 air handlers and 11 AC Units...that was a mistake in original scope
Question: Do we need to replace the disconnects on the outdoor units and seal-tite whips?
Answer: Yes, replace the disconnects and whips
Question: I would presume we are to replace all the refrigerant lines? (this is the correct way to complete this project) Answer: Yes, replace refrigerant lines
Question: Can we reconnect to the existing PVC Flue/Intake Piping?
Answer: Yes, provided existing flue is up to code and it is permitted to do so
Question: The only duct to be replaced is at the unit and connecting to existing duct?
Answer: Yes, use existing duct as much as possible
Question: Is there any work associated with the two condensers on the roof?
Answer: No, those are new
Question: Since we are removing and replacing the lights in the foyer and restrooms, do we replace the existing lights or supply new lights? If new what type or do we include and allowance per light fixture?
Answer: Replace light fixtures with new, contractor to provide submittals. We are looking for a fixture that modestly dresses up that foyer and restrooms while being energy efficient.
Question: In room 1405, the SOW says to replace carpet, but at the pre bid meeting it was mentioned to remove carpet and replace with ceramic tile. Which do we do?
Answer: Replace with ceramic tile similar to foyer (neutral beige color ceramic)
Question: In room 1405, do we remove and replace the ceiling grid and tile, tile only or repair as needed?
Answer: Replace tile and repair existing grid as required