7_-_Project_description _photos.pdf

PDF 1 MB Posted

Attached to
KYANG Building 800 Renovation
Solicitation number
W912KZ-16-R-0006
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
Q A_14Sept.pdf PDF
Bldg_800_roof.pdf PDF
W912KZ-16-R-0006-0001.pdf PDF
Site_Visit_Sign-in_Sheet.pdf PDF
Q A_2Sept.pdf PDF
EXHIBIT_B.doc DOC document
EXHIBIT_A.doc DOC document
W912KZ-16-R-0006.pdf PDF
EXHIBIT_C.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEAS162803

Lifecycle replace HVAC Bldg 800

Line 1: Replace HVAC system

• Replace 11 five‐ton HVAC units and 12 air handlers

Room 1405A:

Paint, replace carpet, install vinyl base

Room 1112:

Paint, replace floor tile, replace toilet partitions, replace toilets and urinals, replace vanity and sink

Room 1111:

Paint, replace toilet partitions, replace toilets and urinals, replace vanity and sinks

Room 1110: Paint, remove and replace damaged wood flooring near water fountain to match existing wood floor, replace thresholds at exterior doors, replace carpet on basement steps

Da m ag ed w oo d flo or in g

Bldg 800:

Rooms 1110, 1111, 1112, and 1405A

Approx 15' x 40' Approx 12' x 20'

Approx 12' x 20'

Approx 14' x 18'

Line 2: Renovate Foyer (Rm 1110)

• Paint walls and ceilings

• Repair damaged hardwood floor and finish to match existing

• Replace damaged thresholds at exterior doors

• Replace carpet on basement steps

Foyer:

Damaged hardwood floor, basement steps

Foyer:

Threshold to be replaced (typ of 2)

Line 3: Renovate restrooms and "green room" Rooms 1111, 1112, and 1405A

• Paint all 3 rooms

• Replace fixtures including urinals, toilets, sinks and vanities

• Remove ceramic floor in men's room and replace with new

• Replace toilet partitions with new metal partitions

• Replace carpet in green room and install new vinyl base to match existing

• Replace ceiling tile in 1405A

Men's vanity, women's partitions

Women's vanity, room 1405A

Line 4: Reroofing

• Remove and replace existing asphalt shingle roof (approx.

6,500 square feet)

• Replace existing flat roof (approx. 4,100 square feet)

• Replace flat roofing above schoolhouse (approx. 3,800 square feet)

West side, east side views of existing roof

File details come from the government source that posted it. Updated .