RFI__2_Generator.docx

DOCX document 21 KB Posted

Attached to
Emergency Generator Installation
Solicitation number
W912K6-13-R-2005
Issued by

About this file

RFI 2 question and answers

View the file

Other files

File Type Posted
sign_in_sheet_generator.pdf PDF
Generator_Site_Plans.dwg DWG drawing
RFI___3_Generator.docx DOCX document
FACILITY_2040_PROPOSED_CONDITION.docx DOCX document
preproposal-emergency_generator.ppt PPT presentation
RFI_1_Generator.docx DOCX document
Map.pdf PDF
W912K6-13-R-0008-P00001.pdf PDF
W912K6-13-R-0008.pdf PDF
EXHIBIT_F.docx DOCX document
SOW_PJMS132022_Install_Emergency_Generator.pdf PDF
Map.pdf PDF
EAL.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT F

PROPOSAL INQUIRY FORMAT

SOLICITATION W912K6-13-R-0008

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA EMAIL IN THIS FORMAT!!

EMAIL: 175WG.MSC@ang.af.mil

Date of RFI: 12 September 2013

Proposal Inquiry:

1. Since the generator model and sizes have been provided, do we still need to investigate and calculate the existing loads to the generators and ATS’s? Contractors may use the information provided and will not have to calculate existing loads to the generators and ATS’s,

2. In line 5 of “Deliverables” on page 5 it states, “The design would consider electrical components that provides voltage and phase matching technology”. Does this mean we are to provide closed transition switches? Contractors will only have to provide open-transition transfer devices for all generators. Due to critical equipment loads in the Radio Relay Bldg #2072, contractors must provide for bypass/isolation capability.

3. Is there an existing monitoring system we will need to interface with? If so, what is the system? There is no monitoring system in place to interface with this operation.

4.Can we get a copy of the Air Force standards which our design and installation must comply with?
Referenced Publications
Environmental Protection Agency: 40 CFR Part 60, Subpart 1111, Standards of Performance for Stationary Compression Ignition Internal Combustion Engines.
Federal: VV-F-800E, Fuel Oil, Diesel
Department of Defense: MIL-L-2104, Lubricating Oil, Internal Combustion Engine, combat/Tactical Service. MIL-PRF-46167, MIL-HDBK 200
Unified Facilities Criteria (UFC) available at http://www.wbld.org UFC 3-501-01 Change 1, UFC 3-560 Change3, UFC 4-501-01
Air Force: available at http://www.e-publishing.af.mil AFPD 32-10,AFI 13-204V3, AFI 23-204, AFI 32-1062, AFI 32-1063 and AFI 90-901
ETL 11-1 available at http://www.wbdg.org
ETL 09-10 available at http://www.wbdg.org
National Fire Protection Association (NFPA) available at http://www.nfpa.org NFPA 30, NFPA 70-2011, NFPA 70B-2010, NFPA 99, NFPA 110-2010

5. Specific gallons of fuel and hours of operation are indicated in the RFP. If the gallons of fuel noted does not provide the time listed, are we required to increase the fuel tank size to provide the specified time. If so, can we reduce the fuel tank size if the specified gallons of fuel is greater than what’s needed for the specified time? The preference is to have the largest size fuel tank that will safely fit per the recommendation of the company providing the generator up to 72 hours at 100% capacity. It may be scaled down to a size that will provide at least a 24 hour run time at 100% capacity.

6. Building 2040

a.Are existing panels to remain and connected to the ATS.
b.Connecting the specified 100A MLO panel to the specified 225A ATS will result in a code violation. Please confirm panel rating.

See Facility 2040 Proposed Condition.

7. Confirm that all fuel will be provided by MD-ANG or other and not by the contractor. Note that awarded contractor will be responsible for providing fuel for initial testing and startup. MDANG will provide remaining fuel amount.

8.Will the contractor take ownership of all equipment to be removed? Provide list of equipment, if any, to go back to MD-ANG or others.
The Contractor is to remove the generators to the DRMO Holding Area located at the MDANG.