Updated questions and answers as of 10 Aug 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-4_Q A.docx | DOCX document | |
| SETA_3.png | PNG image | |
| SETA_4.png | PNG image | |
| A-7_Combo.docx | DOCX document | |
| SETA_1.png | PNG image | |
| SETA_2.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated Site Visit Questions 10 Aug 16 Search and Extraction Training Area (SETA):
QUESTIONS:
What is crane height restriction?
The height restriction for cranes is 45ft, but is easily waivered through the 92nd Civil Engineering shop and will be taken care of for you so that you may use the appropriate sized crane.
Clarification on vertical standing (40ft) container is as follows:
There must be a gate atop for safety as it will be used for belaying off the side and through this container section. With that being said a hatch to allow access down through the container is also required and a man door at bottom to exit once down in the container.
Estimated start date?
Tentatively should be September 15 2016.
Permits for hot work welding?
All hot work permits will be granted by going through the 92nd Fire Department.
What will be the placement of the SETA in the fenced area?
A drawing will be sent out shortly.
Where will the doors be located on horizontal lying containers?
Doors need to be located on both ends of each container. (4 Total) What is the width of the fenced area?
Width is 98 feet.
Will venting in containers be required?
Please include venting of containers in quotes.
MSDS for touchup paint:
Selected party will provide submittal with information to be approved.
** Please note all quotes received must be on a firm-fixed price basis with no modification to price when submitted, i.e. if you’re submitting a 95% designed and complete quote provide 100% of what it will cost for final completion. No modification or additional cost will be added to the contract for 100% design.
** Also required NAICS code you need to have in SAM -system for award management is 332999.