OREGON AIR NATIONAL GUARD
KINGSLEY FIELD
Klamath Falls, OR 97603
STATEMENT OF WORK (SOW)
For
MOUT Facility
Contract Specialist (KS) SSgt Joel Sire 541-885-6181
Description:
The contractor shall accomplish all delivery, assembly, modification, and final installation to provide the government New/First Run modified shipping containers resulting in a complete, turn-key MOUT training facility. Customizing the containers to meet the training equipment needs as defined in this SOW.
The containers will be maintain their mobile design and shall be temporarily fixed together in the arrangement as shown in Figure 1.
1.0 TASKS
1.1 The contractor shall provide the following items:
17 each - 40’ Shipping Containers, “NEW CONDITION” painted sand color and arranged in design as provided.
20 each - Breaching Doors, RAM version 4 each - Breaching Doors, Pry version 2 each - Breaching Doors, Dual Swing Version 16 each - Breaching Window Frame, Interior/Exterior 16 each - Breaching Windows, 36”x36”x1/8” plate glass 80 each - Replacement Breaching Windows, 36”x36”x1/8” plate glass, Not Installed, boxed separately 16 each - Exterior Window Frame (No Glass) 8 each - Interior Window Frame (No Glass) 50 each - Container Connecting Clamp, Installed on job site 8 each - Interior sliding “Barn” style door w/hardware, 36x84 white PVC 51 each - Interior Light Fixture, LED 1 each - Smoke Generator, Heavy Duty, Not Installed, boxed separately 1 each - Smoke Generator Wireless Remote Controller, Not Installed, boxed separately 1 each - Smoke Liquid, 50 Gallon Drum, Not Installed, boxed separately 1 each - Smoke Machine Cleaner, Not Installed, boxed separately 10 each - Breaching Door replacement Pins, Red, 100 Pins per box, Installed by user, extra pins boxed 1 each - Smoke Machine Cleaner, Not Installed 1 each - Strobe Lights (Comes as set of 24) 8 each - Speakers 3 each - Strobe Light control switches 80 each - Weather Strip Gasket 7 each - Interior Door, Pre-hung 1 each - Circuit Breaker Box, 125 Amp, 12 Space, with 8 circuits 2 each - Steel Door, 36” 10 each - Single Pole Switches 18 each - Receptacle, 110v, Duplex 3 each - Dimmer switches for LED Lights 17 each - Door Threshold, Installed on job site
1.2 The contractor shall accomplish all modifications, cutting etc. required to install breach doors, standard doors, and sliding barn-style, or roll-up doors in the appropriate locations as shown in Figure 1.
1.2.1 The contractor shall install all doors listed in paragraph 1.1 in the locations marked in figure 1.
1.3 The contractor shall accomplish all modifications, cutting etc. required to install windows as shown in in figure 2, but shall not install the windows unless otherwise required by this SOW.
1.4 The contractor shall paint each ISO Conex shipping container “sand” color.
1.5 The contractor shall install LED interior light fixtures and strobe lights in each container as shown in Figure 1.
1.5.1 Each LED lighting fixture shall be rated at 1600 lumens or greater.
1.5.2 All lights are to be wired to the circuit breaker and switches in each container. Each container shall be wired with connectors allowing each container to be disconnected/reconfigured without the need for cutting or splicing wires.
1.6 The contractor shall position each container in accordance with the attached diagram (Figure
1) at Kingsley Field ANGB, Klamath Falls, OR 97603.
1.6.1 The contractor shall place the modified/customized containers on the site without site preparation and without any foundation.
1.6.2 The contractor shall connect each container to each adjacent container mechanically to allow the government to reconfigure the site as desired at a later date.
FIGURE 1
SPECIFIC ITEMS
17 each - 40’ Shipping Containers, “NEW CONDITION” painted sand color and arranged in design as provided.
20 each - Breaching Doors, RAM version 4 each - Breaching Doors, Pry version 2 each - Breaching Doors, Dual Swing Version 16 each - Breaching Window Frame, Interior/Exterior 16 each - Breaching Windows, 36”x36”x1/8” plate glass 80 each - Replacement Breaching Windows, 36”x36”x1/8” plate glass, Not Installed, boxed separately 16 each - Exterior Window Frame (No Glass) 8 each - Interior Window Frame (No Glass) 50 each - Container Connecting Clamp, Installed on job site 8 each - Interior sliding “Barn” style door w/hardware, 36x84 white PVC 51 each - Interior Light Fixture, LED. Each LED lighting fixture shall be rated at 1600 lumens or greater.
1 each - Smoke Generator, Heavy Duty, Not Installed, boxed separately 1 each - Smoke Generator Wireless Remote Controller, Not Installed, boxed separately 1 each - Smoke Liquid, 50 Gallon Drum, Not Installed, boxed separately 1 each - Smoke Machine Cleaner, Not Installed, boxed separately 10 each - Breaching Door replacement Pins, Red, 100 Pins per box, Installed by user, extra pins boxed 1 each - Smoke Machine Cleaner, Not Installed 1 each - Strobe Lights (Comes as set of 24) 8 each - Speakers 3 each - Strobe Light control switches 80 each - Weather Strip Gasket 7 each - Interior Door, Pre-hung 1 each - Circuit Breaker Box, 125 Amp, 12 Space, with 8 circuits 2 each - Steel Door, 36” 10 each - Single Pole Switches 18 each - Receptacle, 110v, Duplex 3 each - Dimmer switches for LED Lights 17 each - Door Threshold, Installed on job site
GENERAL REQUIREMENTS
The Contractor will provide all labor, tools, equipment, and materials to complete this project in accordance with all federal, state, county and local regulations and codes. Protect all facilities, grounds, plants, and utilities not scheduled to receive work. Observe all safety, OSHA, DEQ, and EPA rules and regulations. Contractor will repair, repaint, or replace all damaged finishes. Coordination with Security operations fourteen (14) days prior to start of work is required to secure base-entry access. This Statement of Work and the drawings are an outline of performance to ensure the contractor understands the basis for final product assembly. Contractor is to verify dimensions listed on drawings. The contractor will clean-up and dispose of all debris off base at the end of each workday.
Contractor to verify all dimensions and quantities listed on drawings.
Preparation: All work shall be conducted in a workmanlike manner. Contractor shall keep site clean and free of blowing scrap materials. Vehicles and job site clean-up must comply with Kingsley Field Regulations. Protect adjacent surfaces to remain, structures and any government property.
Security: All contractors and associated subcontractors are required to fill out a Security Background Check on DD Form 369 and submit to the SF office 14 days prior to performing work on base. The same persons must complete the anti-terrorism training level 1 located at https://atlevel1.dtic.mil/at/ then submit their completion certificate with their background check. POC is TSgt TJ Lombardi (541-885-6483). Any deliveries of equipment shall be scheduled 1 day in advance with BCE. The contractor will follow all local security procedures.
Work Hours: Contractors must perform work during Base duty hours (M-F 0700-1630). Contractors must coordinate with the BCE office if they wish to work outside of these hours. The contractor will not be allowed to work on Federal holidays or Scheduled Days off (SDO), without prior approval. Project Duration: Project shall commence and be completed no later than twelve to sixteen calendar weeks after contract awarded.