MOUT_Village_Answers.docx

DOCX document 1 MB Posted

Attached to
MOUT Village
Solicitation number
W912JV-18-Q-7012
Issued by

About this file

Questions and Answers.

View the file

Other files

File Type Posted
SOW_MOUT_Facility.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

164 McPike Road, Rome, NY 13440 office: (315) 281-0039 / fax: (315) 281-0041 deployedresources.com

Questions Pertaining to MOUT Village Solicitation #W912JV-18-Q-7012

1. Referring to section 1.5 in the SOW we wanted to clarify where each of the (51) LED light fixtures are going to go. Figure 1 shows some green icons on the blueprint. We assume these are light fixtures, however they are not represented on the key. Can you clarify where each of the (51) light fixtures are needed throughout the blueprint.

a. Led light fixtures are shown below.

b. The Green icons are showing where the Barn Style or Garage Style sliding / rolling doors will be located.

2. Referring Figure 1: We noticed some outside measurements that didn’t add up to different container configurations. Ex: at the top of Figure 1. a measurement of 61’ is given. No matter how the containers are configured together 61’ will not be able to obtainable unless the required 40’ new shipping container is cut down or 20’ containers are used. Would you like us to modify the 40’ containers to size or are we allowed to substitute 20’ containers as needed?

a. All containers should be 40’ containers. The measurements being inaccurate was my fault. When I put the diagram together, I was under the assumption that the 40 containers were 7 ft in width. Please see below photo for how I had laid out each 40 ft container.

Veteran Owned Business deployedresources.com ISO 9001/14001 Certified image1.png image2.png image3.emf