Exhibit E Prototypical Proj.doc
DOC document 38 KB Posted
- Attached to
- FY12 BASIC MATOC SOLICITATION Federal contract opportunity
- Solicitation number
- W912JC-12-R-5703
About this file
MATOC Prototypical Project Notice of Proposed Project Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FY12 MATOC Update.txt | TXT text file | |
| Proposal Inquiry for FY12 MATOC.doc | DOC document | |
| FY12 MATOC Att Roster.pdf | ||
| FY12 MATOC Proposal Inquiry Exh G.pdf | ||
| FY12 MATOC Solicitation.rtf | RTF text file | |
| Wage Rate for MATOC Prototypical.pdf | ||
| MATOC Prototypical Project FINAL-PROJECTMANUAL-2010-5-11 10-9132.zip | ZIP file | |
| MATOC Prototypical project final drwgs 10-9132.zip | ZIP file | |
| FY12 MATOC Exhibits A-D F-G Oct 2011.docx | DOCX document | |
| ATTENTION-READ ME FIRST.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ MATOC
RFP W912JC-12-R-5703
EXHIBIT E PROTOTYPICAL PROJECT
NOTICE OF PROPOSED PROJECT, SOLICITATION
Date: 26 April 2012
PROJECT TITLE AND NO: Environmental Office, Building #6530, Camp Shelby, Mississippi, P.N. 10-9132 PROJECT DESCRIPTION: Is our understanding that a building identified as an Environmental Office will be constructed at a site off Avenue C at Camp Shelby in Forrest County, Mississippi. The building will have a total area of approximately 7,300 sq ft. The finished floor elevation of the building will be at El. 307ft. No other construction information was made available at the time of this investigation. For the purposes of this investigation, we anticipate the maximum column loads will be no greater than 100 kips and maximum wall loads will be no more than 4 kips per ft. The site grades within the building area ranges from a maximum of about El. 308 ft to a minimum of about El. 305ft. The site is cleared of trees with an asphalt parking lot bordering the site on the east. The approximate location of the site is shown in Figure 1. This project is for a Firm Fixed Task Order against the MATOC IDIQ Contract for pricing evaluation purposes only.
All work shall be in strict accordance with the ( X) Plans/drawings and Specifications dated 5 May 11 (Environmental Office Building #6530, Camp Shelby, MS, Project No. 10-9132) MAGNITUDE OF PROJECT: ( ) Less than $25,000; ( ) $25,000-$100,000 ( ) $100,000-$250,000; ( ) $250,000-$500,000; ( X ) $500,000 - $1,000,000; ( ) $1,000,000 - $5,000,000.
PERFORMANCE PERIOD: 365 days, after receipt of Notice to Proceed
SITE VISIT: N/A
PERFORMANCE & PAYMENT BONDS: In accordance with FAR Clause 52.228-15 Performance and Payment Bonds – Construction, contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
PROJECT SAFETY: In accordance with FAR Clause 52.236-13 Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx WAGE DETERMINATION: Currently, General Decision Number KS120005 dtd 04/20/2012, KS5 Modification No 2, dated 04/20/2012 is applicable to this task order.
Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/KS.html However, the current prevailing Wage Determination will be incorporated at time of award. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.
PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.
The Following Provisions/Clauses if marked [X] are applicable to this task order [ X ] Availability of funds (FAR Clause 52.232-18) Funds are not presently available for this procurement.
[ ] Contract Clause 52.211-12 LIQUIDATED DAMAGES If applicable, the following amounts will be applicable to this TASK ORDER N/A [ X] Contract Clause 52.246-21 Warranty of Construction, is applicable to this task order.
[ ] 52.204-10 REPORTING: Executive Compensation and First Tier Subcontract Awards (Jul 2010) is applicable to this order. The following are the codes needed to accomplish the reporting TAS__________, Agency_________.
[ ] Alternate proposal. The government at its option will accept and evaluate alternate proposals; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits. Costs and or credits shall be listed separately. Offerors who do not provide alternate proposals may not be notified in the event the government elects to accept an alternate proposal from another offeror.
[X] FAR 52-217-5 Evaluation of Options applies to this solicitation
[X] FAR 52-217-7 Option for increased Quantity – Separately Priced Line Item applies to award when option(s) not taken at time of award. The Government reserves the right to award option individual line items at time of basic line item award of after award, but not later than 60 days after initial award. Performance period upon award of options will not be extended.
EXHIBIT E MATOC PROPOSAL FORM
Include this form completed with your proposal
PROJECT NO. 10-9132
ENVIRONMENTAL OFFICE BUILDING #6530, CAMP SHELBY, MISSISSIPPI
PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to (Is is our understanding that a building identified as an Environmental Office will be constructed at a site off Avenue C at Camp Shelby in Forrest County, Mississippi. The building will have a total area of approximately 7,300 sq ft. The finished floor elevation of the building will be at El. 307ft. No other construction information was made available at the time of this investigation. For the purposes of this investigation, we anticipate the maximum column loads will be no greater than 100 kips and maximum wall loads will be no more than 4 kips per ft. The site grades within the building area ranges from a maximum of about El. 308 ft to a minimum of about El. 305ft. The site is cleared of trees with an asphalt parking lot bordering the site on the east. The approximate location of the site is shown in Figure 1) in accordance with the task order requirements “Environmental Office, Bldg #6530, Camp Shelby, MS”. This project is for a Firm Fixed Task Order against the MATOC IDIQ Contract for pricing evaluation pruposes only.
Item
Number
Description
Quantity Unit
Amount
Project No. 10-9132
Environmental Office
Bldg #6530, Camp
Shelby, MS
1 JOB
Lump Sum
Provide Screens for
Replaced windows
1 JOB
Lump Sum
SIGNATURE:
COMPANY NAME
Name and title of person authorized to sign
File details come from the government source that posted it. Updated .