W912J2-10-B-0003 Bldg 401 Mod 1.doc
DOC document 35 KB Posted
- Attached to
- UPGRADE MAINTENANCE COMPLEX BLD 401
- Solicitation number
- W912J2-10-B-0003
About this file
Modification 1 Bid Guarantee amount change.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Response to Contractor Questions 08 27 10.pdf | ||
| A102.pdf | ||
| A103.pdf | ||
| P200.pdf | ||
| A101.pdf | ||
| PRE BID SITE VISIT ROSTER.pdf | ||
| P001.dwg | DWG drawing | |
| M501.dwg | DWG drawing | |
| C100 aerial.dwg | DWG drawing | |
| M200.dwg | DWG drawing | |
| M500.dwg | DWG drawing | |
| PD100.dwg | DWG drawing | |
| M101.dwg | DWG drawing | |
| M400.dwg | DWG drawing | |
| ED100.dwg | DWG drawing | |
| S100.dwg | DWG drawing | |
| E101.dwg | DWG drawing | |
| E502.dwg | DWG drawing | |
| P100.dwg | DWG drawing | |
| P101.dwg | DWG drawing | |
| C200 utility.dwg | DWG drawing | |
| E501.dwg | DWG drawing | |
| E102.dwg | DWG drawing | |
| M401.dwg | DWG drawing | |
| F201.dwg | DWG drawing | |
| F101.dwg | DWG drawing | |
| ED101.dwg | DWG drawing | |
| E001.dwg | DWG drawing | |
| PD101.dwg | DWG drawing | |
| MD100.dwg | DWG drawing | |
| S800.dwg | DWG drawing | |
| E100.dwg | DWG drawing | |
| M100.dwg | DWG drawing | |
| M300.dwg | DWG drawing | |
| Mitchell Field Spec 4-16-10.pdf | ||
| A700.dwg | DWG drawing | |
| A200.dwg | DWG drawing | |
| W912J2-10-B-0003.doc | DOC document | |
| A300.dwg | DWG drawing | |
| brdr-30x42.dwg | DWG drawing | |
| G100.dwg | DWG drawing | |
| A100.dwg | DWG drawing | |
| A500.dwg | DWG drawing | |
| AD100.dwg | DWG drawing |
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000 whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .