DRAFT 65% Drawings Partial.pdf

PDF 8 MB Posted

Attached to
Vertical Take-Off and Landing Pad
Solicitation number
W912HV-20-Z-0002
Issued by

About this file

This document is a market survey notice from the U.S. Army Corps of Engineers, Japan District regarding a vertical take-off and landing pad construction project located at Marine Corps Air Station Iwakuni in Japan. The project scope requires construction of a high-temperature concrete VTOL pad and includes additional work such as airfield lighting, grading, perimeter roadway modification, and utility relocations. Demolition includes an existing helicopter landing pad, drainage infrastructure, and minor utilities. The anticipated period of performance is 500 calendar days with projected advertisement in April 2020 and projected award in September 2020. The estimated project value is between 1 and 5 billion Japanese Yen. Interested local firms are requested to respond with their company information, relevant experience, bonding levels, and answers to questions regarding the project description, plans, specifications, and logistical considerations by December 13, 2019.

View the file

Other files

File Type Posted
DRAFT 65% Specifications Partial.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

GI001

C O

VE

R

S H

EE

T

SL

R

MARINE CORPS AIR STATION IWAKUNI, JAPANDRAFT

j2ee9bpg Text Box

PARTIAL 65% DESIGN DRAWINGS

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

GI101

SI

TE

L O

C

AT

IO

N

, H

AU

L R

O U

TE

, S

IT

E

AC

C

ES

S

AN

D

V

IC

IN

IT

Y

PL

AN

AS

N O

TE

D

SL

R

SITE LOCATION PLAN AND CONTRACTOR HAUL ROUTE - MCAS IWAKUNI

NTSA3

YAMAGUCHI

PREFECTURE

VICINITY MAP - YAMAGUCHI PREFECTURE

NTSA1

COUNTRY MAP - JAPAN

NTSC1

YAMAGUCHI

PREFECTURE

MCAS

IWAKUNI

PROJECT

LOCATION

SITE ACCESS &

HAUL ROUTE

CONTRACTOR STAGING,

STORAGE & BATCH PLANT

LOCATION (COORDINATE

W/ RESIDENT OFFICE)

CONTRACTOR ENTRANCE

& COMMERCIAL VEHICLE

INSPECTION GATE

CONTRACTOR EXIT GATE

ENTRANCE

ROUTE

EXIT

ROUTE

USACE RESIDENT OFFICE

BASE

OPERATIONS

AIRFIELD

SECURITY

CHECKPOINT

DRAFT

TAXIWAY A

SD

SD SD SD SD SD SD

SD

SD

SD

SD

SD

SD

OUT2.15

IN2.43

OUT2.55IN2.69

OUT2.87

IN2.86

900FRPM

600FRPM

500FRPM

E E

E

EEEEEEEE

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

E E E E E E E E E E E E E E E E E E E E E E E

EMH

EMH

EMH

EMH

EM

H

EMH

T8-86

GUIDANCE LIGHT

T8-83

GUIDANCE LIGHT

EBOX

EBOX

EBOXEBOXEBOX

EBOX

35210

TRANSFORMER

LP

CONCRETE BOX CULVERT

STREAMER

40DIP

30DIP

30DIP

40DIP

BOX

BOX

C B

Cx Cx Cx Cx

Cx Cx Cx Cx

C x

Ex Ex Ex Ex

Ex Ex Ex Ex Ex Ex Ex Ex

ExEx

Ex Ex Ex Ex Ex Ex

Ex Ex

E x

E x

Ex Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex

E x

E x

E x

E x

Cx Cx Cx

Ex

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

CD101

SI

TE

D

EM

O

LI

TI

O

N P

LA

N

AS

N

O

TE

D

SL

R

SITE DEMOLITION PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T C

D

KEYNOTES:

KEYPLAN

CD101

ME-7-4

HB-2ME-7-5

HB-2

MH-N41-5

H-41

HB-1

3 3

GENERAL NOTES:NOTE 2NOTE 2

6PVMT

6PVMT

5NOTE 1

NOTE 3

NOTE 3

NOTE 3

NOTE 1

6PVMT

6PVMT

NOTE 1

NOTE 1

NOTE1

NOTE 3

SEA WALL

SD

SD

SD

SD

SD

SD

SD

SD

SD

O

U T1.78

IN1.74

1350FR

PM

M

E E

E E

E E

E E

E E

E E

EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

E E E E E E E E E E E E E E E E E E E E E E E

EMH

EMH

EMH

GUIDANCE LIGHT

T8-89T8-88

GUIDANCE LIGHT

GUIDANCE LIGHT

T8-87

EBOXEBOXEBOX

TMH

COMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM

Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx

Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex

SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx

SDx SDx SDx SDx SDx SDx SDx SDx

Ex x Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex Ex Ex Ex Ex Ex Ex

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

CD102

SI

TE

D

EM

O

LI

TI

O

N P

LA

N

AS

N

O

TE

D

SL

R

SITE DEMOLITION PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T C

D

C O

N

TI

N U

ED

O

N S

H

EE

T C

D

KEYNOTES:

KEYPLAN

CD102

GENERAL NOTES:

5NOTE 1

3 NOTE 2

NOTE 1

5 NOTE 1

5NOTE 1 5 NOTE 1

5NOTE 1 5 NOTE 1

NOTE 3

NOTE 4

NOTE 4 (TYP)

3 NOTE 2

5NOTE 1

FT15

EEEEEEEEEEEEEEEEEE EM

H

GUIDANCE LIGHT

T8-90 T

EBOX

EBOX

TM

H

COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMMM COMM COMM COMM COMM COMM COMM COMM COMM

Cx Cx

Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex

Ex Ex Ex Ex Ex

Ex Ex E

Ex Ex Ex

SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx

SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx

Ex Ex Ex Ex

Ex

Cx Cx Cx

Ex

Cx Cx Cx CxCx Cx Cx

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

CD103

SI

TE

D

EM

O

LI

TI

O

N P

LA

N

AS

N

O

TE

D

SL

R

SITE DEMOLITION PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T C

D

KEYPLAN

CD103

KEYNOTES:

GENERAL NOTES:

3 NOTE 2

3 NOTE 2

5 NOTE 1

NOTE 3

NOTE 4

NOTE 4

NOTE 4

NOTE 4

5 NOTE 1

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

CS100

PA

VE

M

EN

T

TY

PE

P

LA

N

AS

N

O

TE

D

SL

R

PAVEMENT TYPE PLAN

1:250A1

PAVEMENT TYPE LEGEND:

HTC CRC PVMT,

SECT A1 DWG CS301

PCC PVMT, SECT A2

DWG CS301

HTC PJ PVMT, SECT

B1 DWG CS301

APA SHLD PVMT,

SECT A3 DWG CS301

HTC PJ PVMT, SECT

B1 DWG CS301

APA SHLD PVMT,

SECT A3 DWG CS301

HMA ROADWAY

PVMT, SECT A4 DWG

CS301

SYMBOL MAT'L

VTOL PAD

SAFETY ZONE

SAFETY ZONE TAXIWAY

VL PAD SHOULDER

CONNECTING TAXIWAY

APA SHOULDER

HMA ROADWAY

FUNCTION

GENERAL NOTES:DRAFT

BP

: 2

0+

0.

9.37

R6

17.56

7.607

N: -206,476.794 E: 7,507.095

VTOL PAD

TRANSVERSE

CENTERLINE

N: -206,588.021 E: 7,450.713 N: -206,533.119

E: 7,459.477

R6

TAXIWAY A

PERIMETER RD

6.011 18.38

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

CS101

SI

TE

L

AY

O U

T

PL

AN

AS

N O

TE

D

SL

R

SITE LAYOUT PLAN

1:250A1

KEYNOTES:

KEYPLAN

+1

BP: 10+000.000

EP: 10+105.000

10+041.860

10+072.340

10+087.580

15.2415.24 15.2415.24 3.053.05 35.1035.10

10+011.508

20+100

10+023.570

57.153 57.147

N: -206,370.357 E: 7,466.352

N: -206,387.002 E: 7,570.024

3.

3.

10+011.500

VTOL PAD/TAXIWAY ℄

STA: 10+056.469

STA: 20+098.634

N: -206,379.309 E: 7,522.107

10+090.934

N: -206,426.692 E: 7,437.512

14.50 N: -206,372.388

E: 7,446.228

10.00 N: -206,322.296

E: 7,454.268

TAXIWAY A

PERIMETER RD

SEA WALL

13.50

4 4 4

18.38

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

CS102

SI

TE

L

AY

O U

T

PL

AN

AS

N O

TE

D

SL

R

SITE LAYOUT PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T C

S1

C O

N

TI

N U

ED

O

N S

H

EE

T C

S1

KEYNOTES:

KEYPLAN

CS102

FT15

35.10

EP

: 2

0+

0.

14.00

2.24

N: -206,279.322 E: 7,538.799

8.

10+011.500

10+090.869

10+099.877

VTOL PAD

TRANSVERSE

CENTERLINE

TAXIWAY A

PERIMETER RD

SEA WALL

11.09

SLOPED INLET

STRUCTURE, SEE CIVIL

GRADING (CG) PLANS

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

CS103

SI

TE

L

AY

O U

T

PL

AN

AS

N O

TE

D

SL

R

SITE LAYOUT PLAN

1:250A1

KEYNOTES:

KEYPLAN

EXISTING GRADE

EMBANKMENT (TYP)

0.50%

APA SHLD PVMT,

SECT A3 DWG CS301

2.00%

HTC CRC PVMT,

SECT A1 DWG CS301

PCC PVMT, SECT

A2 DWG CS301

1.00%

PCC PVMT, SECT

A2 DWG CS301

1.00%

APA SHLD PVMT,

SECT A3 DWG CS301

5.00%

2.00%

0.

D

R O

P

AT

E D

G E

O F

H M

A

SH

O U

LD

ER

0.

D

R O

P

AT

E D

G E

O F

H M

A

SH

O U

LD

ER

VTOL PAD

5 LANES @ 6.096=30.48

APA SHOULDER

35.052

APA SHOULDER

3.1

APA SHOULDER

35.053

APA SHOULDER

3.1

SAFETY ZONE

4 @ 3.810=15.24

SAFETY ZONE

4 @ 3.810=15.24

1.5 TYP

EXISTING TAXIWAY A

23.000

VTOL PAD

30.48

TAXIWAY

12.013

SAFETY ZONE TAXIWAY

18.29

3.053.814.134.13

SAFETY ZONE TAXIWAY

4@3.81=15.24

HMA ROADWAY PVMT,

SECT A4 DWG CS301

APA

SHOULDER

VARIES

3.384-3.412

ROADWAY 9.0±

4@3.81=15.24

HTC CRC PVMT,

SECT A1 DWG CS301

PCC PVMT, SECT

A2 DWG CS301

APA SHLD PVMT,

SECT A3 DWG CS301

HTC PJ PVMT, SECT

B1 DWG CS301

EXISTING GRADE

EMBANKMENT (TYP)

EXISTING

TAXIWAY CRC PVMT

0.50% 0.50% 0.50%

0.85%

VARIES

(5.74-7.21%)

VARIES

(1.72-1.73%)

EXISTING SEAWALL

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

CS301

TY

PI

C

AL

S

EC

TI

O

N S

SL

R

HTC CRC PAVEMENT SECTIONA1 SCALE: NTS

CONTINUOUS REINFORCEMENT

§ 32 13 13.43

450mm AGGREGATE BASE

COURSE § 32 11 23

300mm CONTINUOUSLY

REINFORCED HIGH

TEMPERATURE CONCRETE

§ 32 13 13.43

300mm SUBGRADE PREP, 100% ASTM D1557

§ 31 00 00

WWF REIN WHERE INDICATED ON PLANS

§ 32 13 13.43

450mm AGGREGATE BASE

COURSE § 32 11 23

300mm PLAIN JOINTED

HIGH TEMP CONC

§ 32 13 13.43

300mm SUBGRADE PREP, 100% ASTM D1557

§ 31 00 00

PCC PAVEMENT SECTIONA2 SCALE: NTS

100mm AGGREGATE BASE

COURSE § 32 11 23

300mm PLAIN JOINTED

PORTLAND CEMENT CONC

§ 32 13 14.13

300mm SUBGRADE PREP, 100% ASTM D1557

§ 31 00 00

WWF REIN WHERE INDICATED ON PLANS

§ 32 13 14.13

APA SHOULDER PVMT SECTIONA3 SCALE: NTS

200mm AGGREGATE BASE

COURSE § 32 11 23

60mm APA PAVEMENT

(HOT-MIX ASPHALT FOR

AIRFIELDS GRADATION 2)

§ 32 12 15.13

400mm SUBGRADE PREP, 100% ASTM D1557

§ 31 00 00

HMA ROADWAY PVMT SECTIONA4 SCALE: NTS

200mm AGGREGATE BASE

COURSE § 32 11 23

60mm HMA PAVEMENT

(HOT-MIX ASPHALT FOR

ROADS) § 32 12 16

400mm SUBGRADE PREP, 100% ASTM D1557

§ 31 00 00

PRIME COATPRIME COAT

TYPICAL TRANSVERSE SECTION THROUGH VTOL PADD2 SCALE: NTS

TYPICAL TRANSVERSE SECTION THROUGH VTOL PADB2 SCALE: NTS

HTC PJ PAVEMENT SECTIONB1 SCALE: NTS

SDx

SDx SDx SDx SDx

SDx

SDx

SDx

SDx

LP

40DIP

30DIP

30DIP

40DIP

BOX

BOX

C B

Cx Cx Cx Cx

Cx Cx Cx Cx

C x

Ex Ex Ex Ex

Ex Ex Ex Ex Ex Ex Ex Ex

ExEx

Ex Ex Ex Ex Ex Ex

Ex Ex

E x

E x

Ex Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex

E x

E x

E x

E x

Cx Cx Cx

Ex

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

ED101

R

EM

O

VA

L

PL

AN

AS

N O

TE

D

SL

R

REMOVAL PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T

ED

NOTES:

KEYPLAN

ED101

ME-7-4

HB-2

ME-7-5

HB-2

MH-N41-5

H-41

HB-1

1:250

10 5 10 15

VTOL 5KV PN8mm 1C x 2 (FEP 80)

SP FEP 80

HHL 6KV CET 60mm (FEP 80) HHGL 6KV CET 60mm (FEP 80)

4 - FEP 80

CONDUITS

WDIL CE8mm - 2C (FEP 30) E14mm

H-40-1

E x E x

E x E x

E x

E x

TEDL - NO.8 5KV PN8mm 1C (FEP 40)

PROVIDE

CAP ON

UNUSED

HOLE

PROVIDE

CAP ON

UNUSED

HOLE

NOTE 2

NOTE 4

NOTE 2

TEDL-NO.8 5KV PN8mm 1C (PLP40A) VTOL 5KV PN8mm 1C (PLP40A)

SP PLP40A

E x

NOTE 3

NOTE 5

NOTE 6

WDIL

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx

Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex

SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx

SDx SDx SDx SDx SDx SDx SDx SDx

Ex x Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex Ex Ex Ex Ex Ex Ex

E x

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

ED102

R

EM

O

VA

L

PL

AN

AS

N O

TE

D

SL

R

REMOVAL PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T

ED

C O

N

TI

N U

ED

O

N S

H

EE

T

ED

KEYPLAN

ED102

1:250

10 5 10 15

MH

N41-6

H-40

HB-1

E x

E x

E x

E x

E x

NOTES:

NOTE 2

NOTE 2

NOTE 3

NOTE 4 4 - FEP 80

CONDUITS

HHL 6KV CET 60mm (FEP 80)

HHGL

WDIL

WDIL

E14mm 6KV CET 60mm (FEP 80) CE8mm-2C (FEP 30)

E14mmCE8mm-2C (FEP 30)

HHL 6KV CET 60mm (FEP 80) HHGL 6KV CET 60mm (FEP 80)

Cx Cx

Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex

Ex Ex Ex Ex Ex

Ex Ex E

Ex Ex Ex

SDx SDx SDx SDx SDx SDx

SDx SDx SDx

Ex Ex Ex Ex

Ex

Cx Cx Cx

Ex

Cx Cx Cx CxCx Cx Cx

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

ED103

R

EM

O

VA

L

PL

AN

AS

N O

TE

D

SL

R

REMOVAL PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T

ED

KEYPLAN

ED103

1:250

10 5 10 15

MH-N41-7

H-39

HB-1

HHL 6KVCET 60mm (FEP 80)

HHGL

WDIL CE8mm - 2C (FEP 30)

TEDL - NO.8 5KV PN8mm 1C (FEP 40)

6KVCET 60mm (FEP 80) E14mm

4 - FEP 80

CONDUITS

E x

E x

NOTES:

NOTE 2

NOTE 2

NOTE 3

NOTE 4

SDx

SDx SDx SDx SDx

SDx

SDx

SDx

SDx

LP

C

B

Cx Cx Cx Cx

Cx Cx Cx Cx

C x

Ex Ex Ex Ex

Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex Ex Ex Ex

Ex Ex

Ex Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex

E x

E x

E x

E x

Cx Cx Cx

Ex

E E E E E E E E E E E E E

E E

E

EE

E

E E

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

ES101

EL

EC

TR

IC

AL

S

IT

E

PL

AN

AS

N

O

TE

D

SL

R

ELECTRICAL SITE PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T

ES

KEYPLAN

ES101

ME-7-4

HB-2

ME-7-5

HB-2

MH-N41-5

H-41

HB-1

1:250

10 5 10 15

4 - FEP 80

CONDUITS

E x

E x

E x

E x

E x

E x

TEDL - NO.8 5KV PN 8mm 1C X 2 (50mm PVC)

HHL 6KVCET 60mm (FEP 80) HHGL 6KVCET 60mm (FEP 80)

H-40-1

WDIL CE 8mm - 2C (FEP 30) E14mm

T1T1

NOTES:

TEDL-NO.8 5KV PN 8mm 1C (FEP 40) VTOL 5KV PN 8mm 1C X 2 (FEP 40)

SP FEP 80

VTOL 5KV PN 8mm 1C x 2 (FEP40)

SP FEP 80

TEDL-NO.8 5KV PN 8mm 1C (FEP40)

VTOL 5KV PN 8mm 1C x 2 (50mm PVC)

NOTE 4

Ex

NOTE 2

JJ

NOTE 6

NOTE 5

WDIL

NOTE 8

NOTE 2

NOTE 3NOTE 3

MATCH EXISTING

LIGHT SPACING

(TYP)

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

Ex

Ex x

20+100

E E E E E E E E E

E E

E E

E E

E E

E E

E

E E

E E

E E

E E

E E

E

EEEEEEEEEE

E

E

E E E E E E E E E E E E E E E E E

C

C

C C C C C C

E E E E E E E E

C C C C C C C C C C C C C C

E E E E E E E E E E E E E E E E E E E

E E E E E E E E E E E E E E E E E E E E E E

EE

E

E

E E

E

EE E

E

E

E

E E E E E E E E E E E E E E E E E

EEEEEEEEE

E

E E E E E E E E E E E E E E E E E E E E

EE

E E E

E

E

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

ES102

EL

EC

TR

IC

AL

S

IT

E

PL

AN

AS

N

O

TE

D

SL

R

ELECTRICAL SITE PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T

ES

C O

N

TI

N U

ED

O

N S

H

EE

T

ES

KEYPLAN

ES102

1:250

10 5 10 15

MH

N41-b

H-40

HB-1

4 - FEP 80

CONDUITS

T1 T2

T2

T2

T2 T3T3

T3

T3

T3

T3 T3 T3 T3 T3

T3

T3

T3

T3

T3 T2

T2

T2

T2

T1

T1T1T4T4T1T1

VTO

L

.0 m

MATCH EXISTING

LIGHT SPACING

BOTH SIDES (TYP)

0.5m

TEDL - NO.8 5KV PN 8mm 1C (50mm PVC)

TEDL - NO.8 5KV PN 8mm 1C (50mm PVC)

VTOL 5KV PN 8mm 1C x 2 (50mm PVC)

WDIL CE 8mm 2C (FEP 30)

HHL 6KV CET 60mm (FEP 80) HHGL 6KV CET 60mm (FEP 80)

VTOL 5KV PN 8mm 1C (50mm PVC)

TEDL - NO.8 5KV PN 8mm 1C (50mm PVC)

25mm GLT - 2#14mm2, 1#5.5mm2

OBOBOB

NOTES:

NOTE 4

VTOL 5KV PN 8mm 1C x 2 (50mm PVC)

VTOL 5KV PN 8mm 1C (50mm PVC)

TEDL - NO.8 5KV PN 8mm 1C X 2 (50mm PVC)

TEDL - NO.8 5KV PN 8mm 1C X 2 (50mm PVC)

NOTE 2

AND 3

NOTE 2

AND 3

4 - FEP 80

CONDUITS

4 - FEP 80

CONDUITS

J JJJJJ

T3

1.

m

EOP

4 EQUAL SPACES (TYP)

PO

T

1.

m (T

YP

.0

0m (T

YP

1.52m (TYP)

16.00m (TYP)

EO

P

EOP

NOTE 5

ME-7

(TYP)

(TYP)

J

J J

J J

J J

J

3.51m

T2

C5

ES102

ENLARGED DETAIL

NTSC5

T2 T2 T3 T3

1.

m

EOP

3.51m

0.46m

2.59m

T2

T2

NOTE 7

Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex

Ex Ex Ex Ex

Ex Ex E

Ex Ex Ex

SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx

SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx

Ex Ex Ex Ex

Ex Ex

Ex

Cx Cx Cx Cx Cx Cx CxCx Cx Cx

EP

: 2

0+

0.

E E

E

C C

E E E

E E E

E

C

UNLESS OTHERWISE NOTED ALL

DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUTS/NOTES ARE IN MILLIMETERS

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

PL

O

T

SC

AL

E:

SU

BM

IT

TE

D B

Y:

FI

LE

N

AM

E:

SI

ZE

US Army Corps of Engineers

A

B

C

D

1 2 3 4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SIGNED

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

SHEET

65% SUBMITTAL

D R

AW

IN

G C

O D

E:

SHEETSHEETSHEETSHEET OF -

SU

BM

IT

TA

L D

AT

E:

IS

O

A

Japan Engineer District

PL

O

T D

AT

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

AP

O

A P

3-

M

C

AS

, I W

AK

U

N I, JA

PA

N

P1

VT

O L

PA

D

S O

U

TH

ST

AN

LE

Y-

SE

TI

AD

I J

O

IN

T

VE

N

TU

R E

ES103

EL

EC

TR

IC

AL

S

IT

E

PL

AN

AS

N

O

TE

D

SL

R

ELECTRICAL SITE PLAN

1:250A1

C O

N

TI

N U

ED

O

N S

H

EE

T

ES

KEYPLAN

ED103

1:250

10 5 10 15

MH-N41-7

H-39

HB-1

4 - FEP 80

CONDUITS

VT

O

L

.0 m

TEDL - NO.8 5KV PN 8mm 1C (50mm PVC)

TEDL - NO.8 5KV PN 8mm 1C (50mm PVC)

NOTE 2 AND 3

NOTE 2 AND 3

NOTE 4

4 - FEP 80

CONDUITS

HHL 6KVCET 60mm (FEP 80)

HHGL

WDIL CE 8mm - 2C (FEP 30)

6KVCET 60mm (FEP 80)

NOTES:

NOTE 6

NOTE 5

File details come from the government source that posted it. Updated .