Questions_and_Answers_1.docx
DOCX document 12 KB Posted
- Attached to
- Security System Supplies w. Installation
- Solicitation number
- W912HQ19Q0001
About this file
First set of questions and answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_CSS_Attachment_ACEIT_Approved_Switches.docx | DOCX document | |
| A21_FBO_CSS_Q&A_(3).docx | DOCX document | |
| A21_FBO_CSS_USACE_Finance_Center_Floor_Plan.pdf | ||
| A21_Combined_Syn_Sol_SAP_Revision_1.docx | DOCX document | |
| A21_FBO_CSS_19Q0001.pdf | ||
| A21_FBO_CSS_Q&A_(2).docx | DOCX document | |
| A21_FBO_CSS_Q&A_(2).docx | DOCX document | |
| A21_Attachment_Blank_5512_ACCESS_FORM_1.pdf | ||
| USACE_Finance_Center_Floor_Plan.pdf | ||
| A21_Combined_Syn_Sol_SAP.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Are Scaled Drawings available ? If so please post. "attached"
2. Are Ceilings Suspended? Or Hard Lid? "Suspended"
3. Are there existing Cable Trays for wiring above ceilings? "Yes"
4. Can Existing Wiring be utilized? "Existing wiring for readers and IDS may be utilized" "Wiring for cameras will require replacement"
5. Is a “UPS” required? If so, What Time/Power Duration is required? 2 hour UPS
6. Are “Or Equal” Equipment substitutions allowed? Equal to what?
7. Is “Plenum Wire” acceptable? "Yes"
8. Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t? Yes, on an as needed basis.
9. What is the height of Exterior Cameras? (If any) 15' +/-
10. Please provide/post other “Q & A” requests.