Submitted_Questions_with_Answers.pdf

PDF 79 KB Posted

Attached to
Humphreys Engineer Center Bldg. 2584 - HVAC Upgrade
Solicitation number
W912HQ-17-T-0023
Issued by

About this file

Attachment shows questions submitted with the answers for the Bldg 2584 HVAC Upgrade requirement

View the file

Other files

File Type Posted
Price_Schedule.xlsx XLSX spreadsheet
Combined_Synopsis_Solicitation_HVAC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: HVAC Upgrade – Bldg. 2584 Humphries Engineer Center Telegraph Rd. Alexandria, Va

Prebid RFI

1. Please confirm this is a “Design/Build” project requiring the assistance of an Engineering firm Answer – The contractor shall engage qualified resources to meet this contract’s requirements.

2. Are there any outside air requirements?

Answer – No

3. Please provide the ESI control contractors contact information Answer – John Rabak Jr., LEED GA | Account Manager | Engineered Services, Inc. | Office: (703) 471‐6310 EXT: 132 | Cell: (540) 538‐4564 | Fax: (703) 471‐3919

4. Assuming there is available power the new system could be installed parallel to existing cooling system. This may eliminate the need for temporary cooling, please comment.

Answer – Correct. However, the intent is to have the outdoor unit set on the existing concrete pad.

5. During the site visit it was observed that an existing ductless mini split was conditioning the Spinning room. Does this system remain in place?

Answer – Yes

6. The existing Boiler and all associated piping, unit heaters, fan coils remain in place, please confirm.

Answer – Confirmed