Combined_Synopsis.docx
DOCX document 80 KB Posted
- Attached to
- Pedestrian Walkway Restoration
- Solicitation number
- W912HQ-16-T-0024
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses_to_Bidder_Question_.pdf | ||
| Questions_and_Responses.docx | DOCX document | |
| Technical_Exhibit_-_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis/Solicitation Number: W912HQ-16-T-0024 – Pedestrian Walkway Restoration
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format FAR 12.603 – Streamlined Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. Offers are being requested and a written solicitation will not be issued. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-89, dated July 14, 2016.
The requirement is set aside for a Women owned small business under NAICS code 238990 All other Specialty Trade Contractors. The size standard for this NAICS codes is $15M.
Description: This requirement is to deconstruct and dispose of existing cast in place concrete and install new cast in place concrete pedestrian walkways, curbs, ADA curb ramps and miscellaneous concrete placement at Bldg. 2593, Kingman Bldg., Humphreys Engineer Center, and Alexandria, VA. The end state shall be a durable, slip resistant surface that provides a safe transition between adjacent buildings, sidewalks and parking lots. The work consists of furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described in the Statement of Work.
A site visit will be required for accurate pricing. THE SITE VISIT FOR ALL INTERESTED PARTIES IS SCHEDULED FOR 30 August at 1000 hours EDT. Technical point of contact for questions or project visit is Paul Pinnock (paul.pinnock@usace.army.mil) Ph: 703-428-8374. Vendor must call beforehand to arrange visit. Contractual POC is Victoria Floyd, HECSA Contracting Office, 703-428-6318.
Basis for award: The Government will award a contract resulting from this combined synopsis solicitation on the basis of the lowest price technically acceptable.
Offerors are required to be actively registered with the System for Award Management (SAM) at www.sam.gov prior to award.
Period of Performance:
Required completion is 75 days after the contract award.
Date, Time, and Place Offers are Due: The closing date for the delivery of a response to this combined synopsis/solicitation is on or before 1:00 pm Eastern Daylight Time (EDT), on Friday, 9 September 2016. Offers should be e-mailed or mailed to the Point of Contact (POC) shown below by the closing date and time. If offers are mailed, an electronic version of the offer (i.e. CD, DVD, etc.) should accompany the paper copy. If an offer is e-mailed to the POC shown below, it is the offeror’s responsibility to ensure that the transmission is received by the Government prior to the closing date and time. Upon receipt of an electronic offer, the Government will acknowledge receipt of that offer via email to the offeror.
All question should be submitted before 3:00 pm EDT on Thursday, 1 September 2016.
POC: Victoria Floyd Address: 7701 Telegraph Road
| Phone: | 703-428-6318 |
| Email: | Victoria.d.floyd@usace.army.mil |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
BLDG. 2593 PEDESTRIAN WALKWAY
FFP
Pedestrian Walkway Restoration The project shall be quantified based on three (3) distinct areas as identified in the (see Technical Exhibit) and at a minimum shall incorporate the following construction elements, systems and products to include all incidental items and accessories required to produce a functional and complete installation. Include breakdown of cost, labor and material for each area.
Area #1 __________ Area #2 ____________ Area #3 ____________
TOTAL PRICE: _____________
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| N/A |
| N/A |
| N/A |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| 75 dys. ADC |
| 1 |
| USACE HUMPHREYS ENGR CTR SPT ACTIVITY |
ATTN: CECT-HC,
7701 TELEGRAPH ROAD
ALEXANDRIA VA 22315-3860
FOB: Destination
W912HQ
CLAUSES INCORPORATED BY REFERENCE
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.212-1 |
| Instructions to Offerors--Commercial Items |
| OCT 2015 |
| 52.212-3 |
| Offeror Representations and Certification--Commercial Items |
| JUL 2016 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Items |
| MAY 2015 |
| 52.222-6 |
| Construction Wage Rate Requirements |
| MAY 2014 |
| 52.222-7 |
| Withholding of Funds |
| MAY 2014 |
| 52.222-8 |
| Payrolls and Basic Records |
| MAY 2014 |
| 52.222-9 |
| Apprentices and Trainees |
| JUL 2005 |
| 52.222-10 |
| Compliance with Copeland Act Requirements |
| FEB 1988 |
| 52.222-11 |
| Subcontracts (Labor Standards) |
| MAY 2014 |
| 52.222-12 |
| Contract Termination-Debarment |
| MAY 2014 |
| 52.222-13 |
| Compliance With Construction Wage Rate Requirements and Related Regulations |
| MAY 2014 |
| 52.222-14 |
| Disputes Concerning Labor Standards |
| FEB 1988 |
| 52.222-15 |
| Certification of Eligibility |
| MAY 2014 |
| 52.222-20 |
| Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 |
| MAY 2014 |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction |
| APR 2015 |
| 52.223-2 |
| Affirmative Procurement of Biobased Products Under Service and Construction Contracts |
| SEP 2013 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.228-13 |
| Alternative Payment Protections |
| JUL 2000 |
| 52.232-23 |
| Assignment Of Claims |
| MAY 2014 |
| 52.232-27 |
| Prompt Payment for Construction Contracts |
| MAY 2014 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.236-2 |
| Differing Site Conditions |
| APR 1984 |
| 52.236-3 |
| Site Investigation and Conditions Affecting the Work |
| APR 1984 |
| 52.236-5 |
| Material and Workmanship |
| APR 1984 |
| 52.236-6 |
| Superintendence by the Contractor |
| APR 1984 |
| 52.236-7 |
| Permits and Responsibilities |
| NOV 1991 |
| 52.236-9 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements |
| APR 1984 |
| 52.236-10 |
| Operations and Storage Areas |
| APR 1984 |
| 52.236-11 |
| Use and Possession Prior to Completion |
| APR 1984 |
| 52.236-12 |
| Cleaning Up |
| APR 1984 |
| 52.236-13 |
| Accident Prevention |
| NOV 1991 |
| 52.236-21 |
| Specifications and Drawings for Construction |
| FEB 1997 |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
| 52.243-1 Alt I |
| Changes--Fixed Price (Aug 1987) - Alternate I |
| APR 1984 |
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
| 52.246-13 |
| Inspection--Dismantling, Demolition, or Removal of Improvements |
| AUG 1996 |
| 52.246-21 |
| Warranty of Construction |
| MAR 1994 |
| 52.252-1 |
| Solicitation Provisions Incorporated By Reference |
| FEB 1998 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting. |
| DEC 2015 |
| 252.223-7004 |
| Drug Free Work Force |
| SEP 1988 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.236-7000 |
| Modification Proposals-Price Breakdown |
| DEC 1991 |
| 252.236-7001 |
| Contract Drawings, and Specifications |
| AUG 2000 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Factor 1 – Past Performance. The offeror’s past performance will be evaluated on recent and relevant contracts completed or ongoing for the same or similar in nature, complexity and dollar value to the work required in this solicitation. Contracts must have been completed within the last five (5) years from the solicitation release date. Ongoing contracts must be at least 50% complete by the solicitation release date.
Factor 2 – Price. This factor will use price analysis to determine the total evaluated price in order to support the selection of the lowest priced, technically acceptable proposal. The offeror’s price proposal will be evaluated using the price analysis techniques described at FAR 13.106-3(a) to determine which proposal offers the total evaluated lowest price to the Government.
Technical and past performance, when combined, are significantly less important than price. The award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-price factors
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
Addenda to 52.212-1, Instructions to Offerrors – Commercial
Along with the required information outlined in 52.212-1(b), Submission of offers, the offeror shall provide the following information:
Past Performance – (i) Offerors shall submit past performance information for a maximum of 5 contracts or subcontracts completed or on-going within the last 5 years from the release date of this solicitation. On-going contracts must be at least 50% complete as of the release date of this solicitation. Offers shall provide a project narrative and reference information in narrative form to address each of the bullets below. All points of contact, addresses, telephone numbers, data, fax numbers, etc. should be verified by the Offeror prior to submission to the Government as part of the Offeror’s proposal. Points of contact should be knowledgeable of past performance from a contractual, managerial, and technical perspective.
· Project Title
· Project Description
· Project Start & Ending Dates
· Offeror’s role in the Project
· Contract Value/Actual Awarded Amount
· POCs, Phone, Fax, Address, Email
· Statement of the relevancy of the project to this PWS
· Performance recognition documents received within the last five years on projects relevant to this PWS such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition
(ii) In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE codes/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (JUN 2016)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).
_X_ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
_X__ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Oct 2001) of 52.219-9.
____ (iii) Alternate II (Oct 2001) of 52.219-9.
____ (iv) Alternate III (Oct 2015) of 52.219-9.
_X__ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).
____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
_X__(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
_X__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
_X___(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2016) (E.O. 13126).
_X__ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
_X__ (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
_X__ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
_X__ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
____ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
_X__ (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).
____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (June, 2016) (E.O. 13693).
____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-14.
____ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
____ (41)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-16.
_X__ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
____ (43) 52.223-20, Aerosols (June, 2016) (E.O. 13693).
____ (44) 52.223-21, Foams (June, 2016) (E.O. 13693).
____ (45) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
____(46) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (May 2014) of 52.225-3.
____ (iii) Alternate II (May 2014) of 52.225-3.
____ (iv) Alternate III (May 2014) of 52.225-3.
____ (47) 52.225-5, Trade Agreements (FEB 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
____ (48) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (49) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (50) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
____ (51) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
____ (52) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (53) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
_X__ (54) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C. 3332).
____ (55) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).
____ (56) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (57) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (58)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
_____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).
_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
_____ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(v) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xi) _____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xv)52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
WAGE DETERMINATION
General Decision Number: VA160135 01/08/2016 VA135
Superseded General Decision Number: VA20150135
State: Virginia
Construction Type: Highway
Counties: Alexandria*, Arlington, Clarke, Culpeper, Fairfax, Fairfax*, Falls Church*, Fauquier, Fredericksburg*, King George, Loudoun, Manassas Park*, Manassas*, Prince William, Spotsylvania, Stafford and Warren Counties in Virginia.
*INDEPENDENT CITIES
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;
and other major bridges).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016
SUVA2013-010 09/20/2013
Rates Fringes
ASBESTOS WORKER..................$ 16.91
CARPENTER (STRUCTURE)............$ 16.02
CEMENT MASON/CONCRETE FINISHER...$ 21.71
ELECTRICIAN......................$ 29.27
FORM SETTER......................$ 14.00
IRONWORKER, REINFORCING..........$ 34.18
IRONWORKER, STRUCTURAL...........$ 19.13
LABORER
Asphalt Raker...............$ 15.85 Blaster.....................$ 35.00 Construction Worker I (Skilled Laborer)...........$ 15.77 Construction Worker II (Laborer)...................$ 14.14 Deckhand....................$ 13.00 Fence Erector...............$ 14.41 Flagger.....................$ 13.64 Grade Checker...............$ 13.42 Guardrail Erector...........$ 22.15 Landscape Worker............$ 11.97 Pipe Layer..................$ 19.00 Power Tool Operator.........$ 15.00 Sign Erector................$ 25.00
MASON (STRUCTURE)................$ 17.64
PAINTER..........................$ 15.00
PLUMBER..........................$ 25.00
POWER EQUIPMENT OPERATOR:
Air Compressor..............$ 13.50 Asphalt Distributor.........$ 18.64 Asphalt Paver...............$ 19.35 Backhoe.....................$ 20.59 Boom/Auger..................$ 20.29 Bulldozer (Utility).........$ 15.50 Bulldozer...................$ 20.40 Concrete Finish Machine Operator....................$ 18.54 Concrete Finisher Machine Screed Operator (Bridge)....$ 14.60 Concrete Paving Machine Operator....................$ 20.75 Concrete Pump Operator......$ 33.00 Concrete Saw Operator.......$ 16.00 Crane, Derrick, Dragline (1 cm & under)..............$ 24.53 Crane, Derrick, Dragline (over 1 cm).................$ 25.00 Crusher Tender..............$ 14.25 Drill Operator..............$ 15.70 Excavator (Gradall).........$ 19.32 Front End Loader (2 cm & under)......................$ 19.00 Front End Loader (over 2 cm).........................$ 20.42 Hydro Seeder................$ 17.13 Log Skidder Operator........$ 18.50 Mechanic....................$ 21.75 Mobile Mixer................$ 17.00 Motor Grader (Fine Grade)...$ 27.25 Motor Grader (Rough Grade)..$ 13.58 Oiler, Greaser..............$ 14.00 Pavement Marking Operator...$ 17.00 Pavement Marking Truck Operator....................$ 16.72 Pavement Planing Groundman..$ 19.75 Pavement Planing Operator...$ 19.25 Pile Driver Operator........$ 20.35 Pile Driver, Leadsman.......$ 21.32 Pipe Boring/Jacking Machine Operator............$ 16.00 Plant Operator..............$ 14.88 Roller (Finish).............$ 17.94 Roller (Rough)..............$ 17.06 Scraper Pan Operator........$ 13.00 Shot Blast Machine Operator.$ 16.02 Shovel Operator (2 yds and under)......................$ 16.00 Shovel Operator (over 2 yds)........................$ 25.00 Slip-Form Paver.............$ 21.00 Slurry Seal Paver Machine Operator....................$ 13.75 Slurry Seal Paver Truck Operator....................$ 10.32 Stabilizer Operator.........$ 15.70 Stone-Spreader..............$ 13.35 Subgrade Machine Operator...$ 19.00 Tractor Operator, Crawlers..$ 12.47 Tractor Operator, Utility...$ 12.25 Trenching Machine...........$ 29.87 Vacuum Machine..............$ 18.20
TRAFFIC SIGNALIZATION:
Traffic Signal Installation......$ 21.16
TRUCK DRIVER
Fuel & Lubricant Service Truck Driver................$ 17.73 Transit Mix Truck Driver....$ 15.00 Truck Driver (Multi-Rear Axle).......................$ 16.69 Truck Driver (Single Rear Axle).......................$ 17.50 Truck Driver (Tandem Rear Axle).......................$ 16.91 Truck Driver, Heavy Duty....$ 17.29
WELDER...........................$ 18.15
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
STATEMENT OF WORK
Statement of Work (SOW) United States Army Corps of Engineers Humphreys Engineer Center Bldg. 2593 – Pedestrian Walkway Restoration 22-Jul-16 Version 1.0 Bldg. 2593 – Pedestrian Walkway Restoration
| C.1. - Introduction | 18 |
| C.1.2. - Requirements | 18 |
| C.1.2. - Period of Performance | 20 |
| C.1.3. - Place of Performance | 20 |
| C.1.4. - Applicable Publications | 20 |
| C.1.5. - Definitions | 21 |
| C.1.6. - Acronyms | 22 |
| C.2. - General Requirements | 23 |
| C.2.1. - Preconstruction Conference | 25 |
| C.2.2. - Progress Meetings | 26 |
| C.2.3. - Required Submittals | 26 |
| C.2.4. - Key Personnel | 27 |
| C.2.5. - Identification of Contractor Employees | 28 |
| C.2.6. - Quality Control | 28 |
| C.2.7. - Quality Assurance | 28 |
| C.2.8. - Warranties | 29 |
| C.3. - General Information | 29 |
| C.3.1. - Accident Prevention | 29 |
| C.3.2. - Security Requirements | 30 |
| C.3.2. - Local Security Policy | 30 |
| C.3.3. - Hours of Operation | 32 |
| C.3.4. - Recognized Holidays | 32 |
| C.4. - Attachment/Technical Exhibit List | 32 |
Statement of Work (SOW) Bldg. 2593 – Pedestrian Walkway Restoration
C.1. - Introduction The intent of this Statement of Work is to obtain the services needed to deconstruct and dispose of existing cast in place concrete and install new cast in place concrete pedestrian walkways, curbs, ADA curb ramps and miscellaneous concrete placement at Bldg. 2593, Kingman Bldg., Humphreys Engineer Center, and Alexandria, VA. The end state shall be a durable, slip-resistant surface that provides a safe transition between adjacent buildings, sidewalks and parking lots.
C.1.2. - Requirements The Contractor shall provide all personnel, equipment, materials, supervision, and non-personal services necessary to complete all work identified in, implied by or otherwise required by this Statement of Work (SOW). The intent is to obtain a complete and functional system that provides the intended or specified performance and is in conformance with applicable standards, laws and codes.
The performance criteria shall include the design, demolition, manufacture, transportation, testing, placing, consolidating, curing and finishing of Portland cement concrete walkways. There shall be no exclusions.
The project shall be quantified based on three (3) distinct areas as identified in the (see Technical Exhibit) and at a minimum shall incorporate the following construction elements, systems and products to include all incidental items and accessories required to produce a functional and complete installation:
Selective Demolition, Disposal, Concrete Cutting, Dewatering, Type II Portland Cement, Concrete Forms and Accessories, Hand Grading, Subgrade Compaction and Re-compaction, Subgrade Aggregates, Sand, Concrete Reinforcement, Reinforcement Supports, Polyethylene Vapor Barrier, Pre Molded Expansion Joint Filler Strips, Concrete Protection, Rigid Pavement Concrete Flatwork with Exposed Aggregate Finish, Miscellaneous Cast In Place Concrete with Stamped Finish, Miscellaneous Cast In Place Concrete with Abrasive Finish, Expansion & Construction Joints Elastomeric Sealant, Concrete Sealer, ADA Curb Ramps, ADA Detectable Tactile Warning Strips
Concrete shall develop a compressive strength of 3,500 pounds per square inch (psi) in 28 days.
Reinforcing shall be welded wire fabric, WWF 6 X 6 W10 x W10, at a minimum. Deliver reinforcement to the project site bundled, tagged and marked.
All soft and unsuitable material shall be removed and replaced with suitable material. The subgrade shall be compacted to 92% maximum density as determined by AASHTO T 180, Method A, after which it shall be accurately trimmed to the proper shape and required grade.
Vapor barrier shall be 6-mil polyethylene.
Expansion joint filler shall be 1/2-inch X 4-inch asphalt impregnated fiberboard.
Concrete mixture proportions are the responsibility of the Contractor.
Deposit and consolidate concrete slabs in a continuous operation.
Isolate flatwork joints from building elements
Protect freshly placed concrete from premature drying, excessive cold or hot temperatures. When hot weather conditions exist that would seriously impair the quality and strength of concrete, place concrete in compliance with ACI 305R.
Provide positive drainage to area drains; Finish grades shall slope to drains; surface water shall be diverted away from the building.
Provide complete containment and daily cleanup of concrete slurry created from water lubricated equipment.
Protect existing finishes against splatter during concrete placement.
The Contractor warrants, that he possesses the particular competence and skill in construction necessary to build this project without full engineering and architectural services, and will rely upon his own competence.
The Contractor acknowledges that the Contract Documents may contain errors, omissions, conflicts, or inconsistencies and it is recognized by all parties that the concept drawings and sketches provided are diagrammatic in showing certain physical relationships of the variable elements and systems, and their interfacing with other elements and systems.
Establishment and coordination of these relationships and field verification of dimensions is the exclusive responsibility of the Contractor. No relief will be given if the contractor fails to make this verification. Verification should begin immediately, coordinated with the agency, and be accomplished in the earliest possible time frame prior to bidding.
Construction conditions may require that the Contractor adapt the scope to conform to existing field conditions encountered and make logical adjustments. In the event additional detail, need for clarification or guidance is needed to complete construction of any aspect of the project, immediately notify the Contracting Officer in writing. Any work performed prior to receipt of direction from the Contracting Officer will be done at the Contractor’s risk and no request for added cost or extension of time will be considered.
C.1.2. - Period of Performance The performance period is 75 working days after the contract is awarded.
C.1.3. - Place of Performance The work to be performed under this contract will be performed at the Humphreys Engineer Center, Bldg. 2593 - Kingman Building C.1.4. - Applicable Publications The publications listed below form a part of this scope of work. All materials and installation shall comply with applicable regulations, standards, building codes, state and federal codes, base standards and manufacturer’s instructions in effect on the effective date of the contract. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.
United States Codes, Standards, Laws & Regulations (latest editions) Model Building Codes (International Code Council) Accessibility Laws, Codes, and Standards American Concrete Institute International (ACI) ASTM International (ASTM) Concrete Reinforcing Steel Institute (CRSI) National Institute Of Standards and Technology (NIST) National Ready Mixed Concrete Association (NRMCA) U.S. Department Of Energy (DOE) Environmental Protection Agency (EPA) OSHA CFR 1910 and 1926 Compliance DOD Regulations, Permits and Policies:
Army Regulation AR 200-1 U.S. Army Corps of Engineers Safety and Health Requirements, EM 385-1-1 U.S. Army Garrison Fort Belvoir Permit for Hazardous Waste Storage RCRA Part B U.S. Army Garrison Fort Belvoir Title V Air Permit U.S. Army Garrison Fort Belvoir Stationary Source Permit to Modify and Operate C.1.5. - Definitions CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications CONTRACT DOCUMENTS. Those items so designated in the Agreement, and which together comprise the Contract.
CONTRACT. The entire and integrated written contract between the Owner and Contractor concerning the Work.
DRAWINGS. The part of the Contract that graphically shows the scope, extent, and character of the Work to be performed by Contractor.
DEFECTIVE SERVICE. The word “defective,” when modifying the word “Work,” refers to Work that is unsatisfactory, faulty, or deficient in that it does not conform to the Contract Documents; does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents.
PROGRESS SCHEDULE. A schedule, prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract Times.
PROJECT. The total undertaking to be accomplished for Owner by engineers, contractors, and others, including planning, study, design, construction, testing, commissioning, and start-up, and of which the Work to be performed under the Contract Documents is a part.
QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
SAMPLES. Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and that establish the standards by which such portion of the Work will be judged.
SPECIFICATIONS. The part of the Contract that consists of written requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work.
SUBCONTRACTOR. An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work.
SUBSTANTIAL COMPLETION. The time at which the Work (or a specified part thereof) has progressed to the point where, in the opinion of Engineer, the Work (or a specified part thereof) is sufficiently complete, in accordance with the Contract Documents, so that the Work (or a specified part thereof) can be utilized for the purposes for which it is intended. The terms “substantially complete” and “substantially completed” as applied to all or part of the Work refer to Substantial Completion thereof.
WORK. The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction; furnishing, installing, and incorporating all materials and equipment into such construction; and may include related services such as testing, start-up, and commissioning, all as required by the Contract Documents.
WORK WEEK. Monday through Friday, unless specified otherwise.
C.1.6. - Acronyms
AR
CFR
COR
DA
DOD
FAR
KO
POC
PRS
QA
QASP
QC
QCP
QAP
Army Regulation Code of Federal Regulations Contracting Officer Representative Department of the Army Department of Defense Federal Acquisition Regulation Contracting Officer Point of Contact Performance Requirements Summary Quality Assurance Quality Assurance Surveillance Plan Quality Control Quality Control Program Quality Assurance Program
C.2. - General Requirements Supervision and Superintendence. The Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction.
The Project Manager and Project Superintendent shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Project Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
Coordination. The Contractor shall be responsible for coordinating all construction activities, verifying dimensions and existing field conditions, establishing on-site lines of authority and communication, monitoring schedules and progress, monitoring quality, maintaining records and reports and in general assuring the proper administration of the Work.
The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and mission.