JA51937_AMD5_Specs.pdf
PDF 1 MB Posted
- Attached to
- Basic Training Complex IV Phase I Federal contract opportunity
- Solicitation number
- W912HP-15-R-0004
About this file
W912HP-15-R-0004 JA51937_AMD5_Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Award_Notice.pdf | ||
| 15R00040008Amendment_8.pdf | ||
| 15R00040007Amendment_7.pdf | ||
| JA51937_AMD6_Specs.pdf | ||
| JA51937_AMD6_CADD_Proposed_Grading_Plan.dgn | — | |
| JA51937_AMD6_CADD_Existing_Topography.dgn | — | |
| Amendment_6.pdf | ||
| JA51937_AMD6_Drawings.pdf | ||
| JA51937_AMD5_Drawings.pdf | ||
| Amendment_5.pdf | ||
| Amendment_4.pdf | ||
| Amendment_3.pdf | ||
| JA51937_AMD3_Specs.pdf | ||
| JA51937_AMD3_Drawings.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| W912HP-15-R-0004_Solicitation.pdf | ||
| CombineddrawingsJA51937_RTA_V2-V4.PDF | ||
| JA51937_RTA_V1.pdf | ||
| Combined_SpecsJA51937vol1-7.pdf | ||
| Combined_Design_Analysis.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Trainee Barracks Complex JA51937 Ft. Jackson, SC
PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 05)
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29.37 LEED(TM) DOCUMENTATION
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.37 INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS
01 74 19.37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 02.00 10 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.80 COMMISSIONING
*5
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 30 SYNTHETIC SPORTS SURFACE
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 20 00.00 10 CONCRETE REINFORCING
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
04 21 13.13 NONBEARING MASONRY VENEER/STEEL STUD WALLS
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 16 LONGSPAN STEEL JOIST FRAMING
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 2 (Revised by Amendment 05)
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 29 SPRAY-APPLIED FOAM INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 41 00 METAL SOFFIT PANELS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 13 METAL ROLLING COUNTER DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 90 COLOR SCHEDULE
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPET
09 83 13 ACOUSTICAL WALL TREATMENT
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 09 00.00 44 MISCELLANEOUS ITEMS
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 14 01 EXTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 56 13 *3 DELETEDSTEEL SHELVING
DIVISION 11 - EQUIPMENT
11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 24 13 ROLLER WINDOW SHADES
PROJECT TABLE OF CONTENTS Page 3 (Revised by Amendment 05)
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS (COVERED TRAINING CANOPY)
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS
23 81 47 WATER-LOOP HEAT PUMP SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 12 21 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 V ARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
PROJECT TABLE OF CONTENTS Page 4 (Revised by Amendment 05)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 16 01.00 10 SMALL INTRUSION DETECTION SYSTEM
28 20 01.00 11 DOOR MONITORING SYSTEM
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEMS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16 BASE COURSE FOR RIGID PAVING
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 24.00 10 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
33 51 15 NATURAL-GAS/LIQUID PETROLEUM GAS DISTRIBUTION
33 61 00 PREFABRICATED UNDERGROUND COOLING DISTRIBUTION SYSTEM
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
APPENDICES
Appendix A Asbestos Survey Reports
-- End of Project Table of Contents --
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 98 PAGES
Trainee Barracks Complex
01 30 00 SD-01 Preconstruction Submittals
1.4.1 G ROUtility Outage Requests
1.4.1 G ROUtility Connection Requests
1.4.2 G ROExcavation Permits
1.9Antiterrorism Operations Security
Requirements
1.12 G ROList of contact personnel
1.10 G ROProgress and completion pictures
1.7 G ROEnergy rebate and incentive
applications 01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROQualifications
3.4 G ROProject Schedule;
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29.37 SD-01 Preconstruction Submittals
1.4 G ROLEED Implementation Plan
3.1Preconstruction Meeting
SD-07 Certificates 3.1Pre-Closeout Meeting
SD-11 Closeout Submittals
1.5 G ROLEED Documentation Notebook
3.1Closeout Meeting
01 35 26 SD-01 Preconstruction Submittals
1.6 G ROAccident Prevention Plan (APP)
1.7 G ROActivity Hazard Analysis (AHA)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(Revised by Amendment 05)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 98 PAGES
01 35 26 1.6 G ROCrane Critical Lift Plan
1.5.1.2 G ROCrane Operators
SD-06 Test Reports 1.11.1Accident Notification 1.11.2Accident Reports 1.11.3Crane Reports
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.12Hot work permit
1.13 G ROLicense Certificates
1.11.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan 01 45 35 SD-01 Preconstruction Submittals
3.1.2Written Practices 3.1.2NDT Procedures and Equipment
Calibration Records SD-06 Test Reports
3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1Steel Truss Plant 2.1Steel Joist Institute Membership
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 98 PAGES
01 45 35 2.1Certificate of Compliance
1.5 G ROSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
2.1 G ROComprehensive Final Report
3.1.2 G ROComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction site plan
3.3.1 G ROTraffic control plan
SD-02 Shop Drawings
2.1.2 G ROSign Legend Orders;
01 57 19.37 SD-01 Preconstruction Submittals
1.3 G ROIndoor Air Quality (IAQ)
Management Plan SD-06 Test Reports
1.3.2Air contamination testing SD-11 Closeout Submittals
1.3.2LEED
01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 G ROEnvironmental Protection Plan
1.8 G ROCondition Survey
01 57 23 SD-06 Test Reports 1.3.2Storm Water Inspection Reports for General Permit 1.3Erosion and Sediment Controls
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 98 PAGES
01 57 23 2.1.3Mill Certificate or Affidavit 01 62 35 SD-01 Preconstruction Submittals
1.7 G ROBiobased Products
01 74 19.37 SD-11 Closeout Submittals
1.5Records 01 78 02.00 10 SD-02 Shop Drawings
1.3.1 G ROAs-Built Record Drawings
SD-03 Product Data
1.3.2 G ROAs-Built Record of Equipment
and Materials
1.6.1 G ROWarranty Management Plan
1.6.6 G ROWarranty Tags
1.4 G ROSpare Parts Data
SD-10 Operation and Maintenance Data
1.6.1 G ROInstructions
SD-11 Closeout Submittals
1.3.1 G ROAs-Built Record Drawings
1.5 G ROCertification of EPA Designated
Items
1.3.5 G ROEquipment-In-Place List
1.11 G ROInterim Form DD1354
1.10 G ROFinal Cleaning
1.9 G RORed Zone Meeting Checklist
1.11 G ROChecklist for Form DD1354
3.1Release of Claim
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 98 PAGES
01 78 23 SD-10 Operation and Maintenance Data
1.2 G ROOperation and Maintenance
Manuals
01 91 00.80 SD-03 Product Data
1.11 G ROFinal Commissioning Plan
1.9.2 G ROCommissioning Schedule
1.8.3 G ROCx Related Submittals
1.8.3 G ROStart-up and Initial Checkout
Plans
1.8.3 G ROControls Contractor Initial
Checkout Plan
1.8.3 G ROTAB Plan and Approach
1.8.3 G ROPrefunctional Checklists
1.8.3 G ROFunctional Performance Tests
SD-06 Test Reports
1.8.3 G ROCommissioning Report
1.8.3 G ROTAB Progress reports
1.8.3 G RODraft TAB report
1.8.3 G ROFinal TAB report
1.8.3Cx Issues Log 1.8.3Cx Progress reports
1.8.3 G ROStart-up and initial checkout
reports SD-07 Certificates
1.5 G ROCommissioning Firm
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 98 PAGES
01 91 00.80 1.3.1 G ROCommissioning Specialist
1.5 G ROCommissioning Specialist
1.7 G ROCertificate of Readiness
SD-11 Closeout Submittals
1.8.3 G ROSystems Manual
1.8.3 G ROThermal Comfort Survey
02 41 00 SD-01 Preconstruction Submittals
1.10 G ROExisting Conditions
SD-07 Certificates
1.2.1 G RODemolition Plan
1.6 G RONotification
SD-11 Closeout Submittals 3.3.4Receipts
02 82 14.00 10 SD-02 Shop Drawings
1.4 GDetailed Drawings
SD-03 Product Data
3.6.3.1 GAsbestos Waste Shipment
Records 1.1Weight Bills and Delivery Tickets
GEncapsulants
1.9.1 GRespiratory Protection Program
3.6 GCleanup and Disposal
1.6.1 GQualifications
1.11Training Program 1.8.1Licenses, Permits, and
Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 98 PAGES
02 82 14.00 10 3.6.3.2 GAsbestos Management Plan SD-06 Test Reports
3.4Exposure Assessment and Air Monitoring
1.9Medical Surveillance Requirements
02 83 30 SD-03 Product Data 2.1Primer 2.2Rubber Surfacing
SD-07 Certificates 1.3Qualifications
SD-08 Manufacturer’s Instructions 2.1Primer 2.2Rubber Surfacing
SD-11 Closeout Submittals 1.4Warranty
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 G ROFormwork
3.1.1 G ROFormwork
2.2.1Form Removal Schedule
SD-03 Product Data 2.2Form Materials
SD-05 Design Data 2.1Calculations
SD-06 Test Reports 3.2Inspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 98 PAGES
03 20 00.00 10 SD-02 Shop Drawings
3.1 G ROReinforcement
SD-07 Certificates 2.3Reinforcing Steel 1.3.1Qualified Welders 1.3.2Qualification of Steel Bar
Butt-Splicers 03 30 53 SD-02 Shop Drawings
1.5 G DOInstallation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture 2.2.3.2Water-Reducing or Retarding
Admixture 2.2.8Curing Materials 2.2.5Expansion Joint Filler Strips, Premolded 2.2.6Joint Sealants - Field Molded
Sealants 2.4.1Waterstops 2.4.2Chemical Floor Hardener 3.2Conveying and Placing Concrete
2.3 G ROMix Design Data
2.3Ready-Mix Concrete 2.4.3Curing Compound
SD-06 Test Reports 2.2.2Aggregates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 98 PAGES
03 30 53 2.1.3 G ROConcrete Mixture Proportions 3.3.3.2Measurement of Floor
Tolerances
3.9.3 G ROCompressive Strength Testing
3.9.3 G ROSlump
3.9.3Air Content 2.2.4Water
SD-07 Certificates 2.2.1Cementitious Materials 2.2.1.2Pozzolan 1.5.1CPG for recycled materials or appropriate Waiver Form 2.2.2Aggregates 2.3Delivery Tickets
SD-08 Manufacturer’s Instructions 2.4.2Chemical Floor Hardener 2.4.3Curing Compound
04 20 00 SD-02 Shop Drawings
1.4.5 G RODetail Drawings
SD-03 Product Data 2.2Clay or Shale Brick 2.7.3Cement
1.6.2 G ROCold Weather Installation
2.8Water-Repellant Admixture
1.2.1LEED
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 98 PAGES
04 20 00 2.4 G ROConcrete Masonry Units (CMU)
2.2 G ROClay or Shale Brick
2.5 G ROArchitectural Cast Stone Items
2.10Anchors, Ties, and Bar
Positioners 2.14Expansion-Joint Materials 2.11Joint Reinforcement 1.4.3Portable Panel
SD-06 Test Reports 3.20.3Efflorescence Test 3.20.1Field Testing of Mortar 3.20.2Field Testing of Grout 2.7.3Masonry Cement 1.4.4Masonry Inspector Qualifications 2.4.4Fire-Rated CMU
SD-07 Certificates 2.2Clay or Shale Brick 2.3Concrete Brick 2.4Concrete Masonry Units (CMU) 2.10Anchors, Ties, and Bar
Positioners 2.14Expansion-Joint Materials 2.11Joint Reinforcement 2.7.3Masonry Cement 2.7.1Admixtures for Masonry Mortar 2.9.1Admixtures for Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 98 PAGES
04 20 00 1.4.2Contamination SD-08 Manufacturer’s Instructions
2.7.3Masonry Cement 04 21 13.13 SD-02 Shop Drawings
1.3.3Detail Drawings SD-03 Product Data
1.5LEED
2.4Insulation
SD-04 Samples 2.11Expansion Joint Materials 1.3.1Sample Panel
SD-06 Test Reports 3.1Calculations
SD-07 Certificates 2.2Joint Reinforcement 2.7.1Moisture Barrier 2.6Exterior Sheathing 2.8Veneer Anchors 2.1Welding 2.9.2Welding
05 05 23 SD-03 Product Data
1.5 G ROWelding Procedure Qualifications
1.5.4Welder, Welding Operator, and
Tacker Qualification 1.5.5Inspector Qualification 1.5.2Previous Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 98 PAGES
05 05 23 SD-06 Test Reports 3.2Quality Control 3.4Nondestructive Examination
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 G ROErection Drawings
SD-02 Shop Drawings
1.5.2 G DOFabrication drawings
SD-03 Product Data 2.5.2Shop primer 2.4.1Welding electrodes and rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout
SD-06 Test Reports 2.5.2Class B coating 2.3Bolts, nuts, and washers 3.6.1.2Weld Inspection Reports 3.6.2.1Direct Tension Indicator Washer
Inspection Reports 3.6.3.1Bolt Testing Reports
SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers 1.3AISC Fabrication Plant Quality
Certification 1.3AISC Erector Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 98 PAGES
05 12 00 1.5.3.1Welding procedures and qualifications
2.4.1Welding electrodes and rods 05 21 16 SD-01 Preconstruction Submittals
1.4.2Welder qualification 1.4.2Material Safety Data Sheets
SD-02 Shop Drawings
1.4.1 G DOLongspan Steel Joist Framing
SD-06 Test Reports 3.4Erection inspection 3.4Welding inspections
SD-07 Certificates 1.4.1Accessories 1.4.2Certification of Compliance
05 21 19 SD-01 Preconstruction Submittals 1.5.2Welder qualification 1.5.2Material Safety Data Sheets
SD-02 Shop Drawings
1.5.1 G DOSteel joist framing
SD-06 Test Reports 3.4Erection inspection 3.4Welding inspections
SD-07 Certificates 2.1Accessories 1.5.2Certification of Compliance
05 30 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 98 PAGES
05 30 00 1.3.5Fabrication Drawings 2.3.2.1Cant Strips 2.3.2.2Ridge and Valley Plates 2.3.2.3Metal Closure Strips
SD-03 Product Data 2.2Accessories 2.1.3Galvanizing Repair Paint 2.1.6Galvanizing Repair Paint 2.1.5Joint Sealant Material 1.3.2Powder-Actuated Tool Operator 2.3.4Repair Paint 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
SD-04 Samples 2.3Metal Floor Deck Units 2.3Metal Roof Deck Units 2.1.7Flexible Closure Strips 2.3Flexible Closure Strips 2.2Accessories
SD-07 Certificates
1.3.1 G DODeck Units
1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance
05 40 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 98 PAGES
05 40 00 1.6.1 G DOFraming Components SD-03 Product Data
2.1Studs, Joists SD-05 Design Data
1.6.2 G DOMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal Framing
3.1.1Welds 05 50 13 SD-02 Shop Drawings
2.10 G ROStructural Steel Door Frames
2.3Access Doors And Panels 2.6Expansion Joint Covers
2.9 G ROAngles And Plates
SD-03 Product Data 2.3Access doors and panels 2.4Control-joint covers 2.6Expansion joint covers 2.10Structural steel door frames
SD-04 Samples 2.6Expansion joint covers 2.4Control-joint covers
05 51 00 SD-02 Shop Drawings
2.1 G ROIron and Steel Hardware
2.1 G ROSteel Shapes, Plates, Bars and
Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 98 PAGES
05 51 00 2.11 G ROMetal Stair System SD-03 Product Data
2.2Structural Steel Plates, Shapes, and Bars
2.4Hot-Rolled Carbon Steel Sheets and Strips
2.3Hot-Rolled Carbon Steel Bars 2.5Galvanized Carbon Steel Sheets 2.6Gray Iron Castings 2.9Concrete Inserts 2.12Protective Coating
2.13 G ROSteel Pan Stairs
2.13.5 G ROSteel Stairs
SD-07 Certificates 1.3Welding Procedures 1.3Welder Qualification
SD-08 Manufacturer’s Instructions 2.2Structural Steel Plates, Shapes, and Bars 2.4Hot-Rolled Carbon Steel Sheets and Strips 2.3Hot-Rolled Carbon Steel Bars 2.5Galvanized Carbon Steel Sheets 2.7Malleable Iron Castings 2.12Protective Coating
05 51 33 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 98 PAGES
05 51 33 2.3Ladders 2.4Ship's ladders
SD-03 Product Data 2.3Ladders 2.4Ship's Ladders
05 52 00 SD-02 Shop Drawings
1.2 G ROFabrication Drawings
2.1 G ROIron and Steel Hardware
3.1 G ROIron and Steel Hardware
2.1 G ROSteel Shapes, Plates, Bars and
Strips
3.1 G ROSteel Shapes, Plates, Bars and
Strips SD-03 Product Data
1.2Structural Steel Plates, Shapes, and Bars
2.3Structural Steel Plates, Shapes, and Bars
1.2Structural Steel Tubing 2.4Structural Steel Tubing 1.2Hot-Rolled Carbon Steel Bars 2.5Hot-Rolled Carbon Steel Bars 1.2Concrete Inserts 2.7Concrete Inserts 1.2Protective Coating 2.9Protective Coating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 98 PAGES
05 52 00 1.2 G ROSteel Railings and Handrails
2.10 G ROSteel Railings and Handrails
1.2 G ROAnchorage and Fastening
Systems SD-07 Certificates
1.4.1Welding Procedures 1.4.2Welder Qualification
SD-08 Manufacturer’s Instructions 3.1Installation Instructions
06 10 00 SD-02 Shop Drawings
2.1 G RONailing Strips
SD-03 Product Data
1.9LEED
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates 1.8Certificates of grade 1.7Preservative treatment
06 20 00 SD-02 Shop Drawings 1.3Detail Drawings
SD-03 Product Data
1.7LEED
SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance
06 41 16.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 98 PAGES
06 41 16.00 10 1.5.2Shop Drawings 2.11Shop Drawings Part 3Installation
SD-03 Product Data 2.1Wood Materials 2.9Wood Finishes 2.11.4.3Finish Schedule
1.3.1LEED
SD-04 Samples 2.3Plastic Laminates 2.6Cabinet Hardware
SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework Part 3Laminate Clad Casework
06 61 16 SD-02 Shop Drawings 1.5.2Detail Drawings 3.1Installation
SD-03 Product Data 2.1Solid polymer material 1.5.1Qualifications 2.3Fabrications
1.3LEED
SD-04 Samples
2.1 G ROMaterial
2.3.6 G ROCounter Tops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 98 PAGES
06 61 16 SD-06 Test Reports 2.1Solid polymer material
SD-07 Certificates 2.3Fabrications 1.5.1Qualifications
SD-10 Operation and Maintenance Data
3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals
1.4 G ROWork Plan
SD-03 Product Data
2.2 G ROThermal Imaging Camera
SD-07 Certificates
1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 G ROPressure Test Procedures
3.5.5 G ROAir Leakage Test Report
3.6.5 G RODiagnostic Test Report
07 21 13 SD-03 Product Data 2.1Block or board insulation 2.2Vapor retarder 2.3Pressure sensitive tape 2.4Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 98 PAGES
07 21 13 SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.4.1Adhesive
07 21 16 SD-03 Product Data 2.1Blanket Insulation 2.3Accessories
1.5LEED
SD-08 Manufacturer’s Instructions 3.3Insulation
07 21 29 SD-03 Product Data
2.1 G ROSpray Urethane Foam
SD-07 Certificates 1.3.1Qualification of Manufacturer 1.3.3Qualification of Applicator 2.2ICC Evaluation Report
SD-08 Manufacturer’s Instructions 2.1Spray Urethane Foam 3.3.1Surface preparation
07 22 00 SD-02 Shop Drawings 2.1.4Tapered Roof Insulation
SD-03 Product Data 2.3Fasteners 2.1Insulation
1.4.3LEED
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 98 PAGES
07 22 00 1.4.1Flame spread and smoke developed ratings
SD-07 Certificates 1.3Qualifications
SD-08 Manufacturer’s Instructions 2.3Fasteners 2.1Insulation
07 27 10.00 10 SD-02 Shop Drawings
1.3.2 G CAAir Barrier Assembly
SD-03 Product Data
2.1 G ROFluid-Applied Air Barrier/Moisture
Membrane
2.2 G ROAir Barrier Component Materials
SD-04 Samples
3.1.2 G ROMock-up
SD-06 Test Reports
1.8 G DODesign Review Report
3.1.3 G ROTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 41 00 SD-02 Shop Drawings
2.1 G ROSoffit Panels
2.1 G ROSoffit Panels
SD-03 Product Data
2.1 G ROSoffit panels
2.1 G ROSoffit panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 98 PAGES
07 41 00 2.2Attachment clips 2.3Accessories 2.3.1Fasteners 2.3.2Sealants
SD-04 Samples 2.1Soffit panels 2.1Soffit panels 2.3Accessories 2.3.2Sealants
SD-06 Test Reports 3.5Field Inspection 1.4.2Finish
SD-08 Manufacturer’s Instructions 3.3Installation
07 41 13 SD-02 Shop Drawings
1.4.5 G DORoofing Panels
1.4.5Flashing And Accessories
SD-03 Product Data 2.1Roof panels 1.4.5Factory-Applied Color Finish 2.4Accessories 1.4.5Fasteners 1.4.5Pressure Sensitive Tape 2.6Underlayment 2.7Gaskets and Sealing/Insulating
Compounds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 98 PAGES
07 41 13 1.4.5Coil Stock
1.10LEED
SD-04 Samples
2.1 G RORoof Panels
1.4.5 G ROFactory-applied Color Finish
2.4Accessories 1.4.5Fasteners 1.4.5Flashing And Accessories 1.4.5Gutter/Downspout Assembly 1.4.5Gaskets and Sealant/Insulating
Compounds SD-05 Design Data
1.2.2Wind Uplift Resistance SD-06 Test Reports
1.2.1 G CALeakage Test Report
1.2.2Wind Uplift Test Report 2.2Factory Finish and Color
Performance Requirements SD-07 Certificates
2.1Roof Panels 1.4.5Coil stock compatibility 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator
SD-08 Manufacturer’s Instructions 1.4.5Installation Manual
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 98 PAGES
07 41 13 1.8 G ROWarranties
3.9 G ROInformation Card
07 42 13 SD-01 Preconstruction Submittals
1.5.3 G ROQualification of Manufacturer
1.5.4 G ROQualification of Installation
Contractor
1.5.4.1 G ROQualification of Welders
1.8 G ROWarranty
SD-02 Shop Drawings
1.5.1.1 G ROInstallation Drawings
SD-03 Product Data 2.1LEED Product Data
2.2.1 G ROWall Panels
1.5.5Closure Materials 2.5.4.4Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint 1.5.5Accessories 2.5Accessories
SD-04 Samples
2.2.1 G ROWall Panels
1.5.3.1 G ROFasteners
2.5.3 G ROMetal Closure Strips
2.2.3 G ROFactory Color Finish
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 98 PAGES
07 42 13 1.5.1.2 G ROwind load design analysis SD-06 Test Reports
3.7.2 G ROLeakage Tests
1.3.2 G ROWind Load Tests
2.2.3.6 G ROCoating
2.2.3.6 G ROChalking
1.3.2 G ROSeismic Tests
SD-07 Certificates
1.5.3.1 G ROCoil Stock
1.5.3.1 G ROFasteners
1.5.3.1 G ROGalvanizing Repair Paint
1.5.3.1 G ROEnamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 G ROInstallation
SD-09 Manufacturer’s Field Reports
3.8.1 G ROManufacturer's Field Reports
SD-10 Operation and Maintenance Data
1.5.6 G ROMaintenance Instructions
SD-11 Closeout Submittals
1.8 G ROWarranty
07 53 23 SD-02 Shop Drawings
1.4Roof Plan Drawing SD-03 Product Data
2.2Cement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 98 PAGES
07 53 23 2.1.1 G ROEPDM Sheet 2.1.2Seam Tape 2.1.4Bonding Adhesive 2.1.3Lap Splice Adhesive 2.1.6Water Cutoff Mastic/Water Block 2.1.5Lap Cleaner, Lap Sealant, and
Edge Treatment 3.3Flashings 2.1.7Flashing Accessories 2.1.7Flashing Tape 2.1.8Fasteners and Plates 2.1.10Roof Insulation 1.12LEED Product Data 1.13LEED Product Data 2.1.9Pre-Manufactured Accessories
1.9 G ROwarranty
SD-05 Design Data
1.5.4 G ROWind Uplift Calculations
SD-07 Certificates 1.5.1Qualification of Manufacturer 1.5.2Qualification of Applicator
1.5.4 G ROWind Uplift Resistance
1.5.3 G ROFire Resistance
SD-08 Manufacturer’s Instructions
3.2.3 G ROMembrane Application
3.3.2 G ROMembrane Flashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 98 PAGES
07 53 23 2.1.2Seam Tape 3.2.4Tape Seams/Lap Splices 3.2.5Adhesive Seams/Lap Splices 3.2.6Perimeter Attachment 3.2.4Primer 3.2.7Fasteners 2.1.9Pre-Manufactured Accessories
1.7 G ROCold Weather
SD-11 Closeout Submittals 1.9Warranty 3.9Information Card 3.8Instructions To Government
Personnel 07 60 00 SD-02 Shop Drawings
3.1.22Covering on flat, sloped, or curved surfaces
3.1.15Gutters 3.1.16Downspouts 3.1.23Expansion joints 3.1.19Splash pans 3.1.17Flashing for Roof Drains 3.1.10Base flashing 3.1.11Counterflashing 3.1.24Flashing at roof penetrations 3.1.12Reglets 3.1.18Scuppers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 98 PAGES
07 60 00 3.1.14Drip edge 3.1.20Open valley flashing 3.1.21Eave flashing 3.1.26Soffit and Fascia
SD-03 Product Data
1.5LEED
07 84 00 SD-02 Shop Drawings 1.2.3Firestopping Materials, with related assemblies SD-03 Product Data
1.6LEED
SD-07 Certificates
1.4.2Manufacturer's Technical Representative
Part 2Firestopping Materials 1.4.1Installer 3.3Inspection
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-03 Product Data
2.1 G RODoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 98 PAGES
08 11 13 2.7 G ROFrames 2.5Moldings
1.5LEED
08 11 16 SD-02 Shop Drawings
1.5.1 G RODoors, windows and frames
SD-03 Product Data
1.6LEED
SD-04 Samples 1.5.2Finish sample
SD-05 Design Data 1.2.1Calculations
1.5.3 G RODesign Analysis
SD-06 Test Reports 1.5.4Minimum Condensation
Resistance Factor
1.2.5.3 G ROStandard Airblast Test
SD-08 Manufacturer’s Instructions 2.1Doors and frames
08 14 00 SD-02 Shop Drawings
2.1 G RODoors
SD-03 Product Data 2.1Doors 2.2Accessories 2.3.6Water-resistant sealer 1.5warranty
2.1.2 G ROFire resistance rating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 98 PAGES
08 14 00 1.3LEED
SD-04 Samples
2.1Doors
2.3.5.2 G RODoor finish colors
SD-06 Test Reports 2.4Cycle-slam 2.4Hinge loading resistance
08 33 13 SD-02 Shop Drawings
1.4 G RODetail Drawings
SD-03 Product Data 1.6Warranty 2.1Rolling Counter Doors 3.1Installation 3.5Cleaning
SD-06 Test Reports 3.3Drop-test
SD-11 Closeout Submittals 1.2LEED Documentation
08 34 59 SD-02 Shop Drawings
2.1 G ROVault door Unit
2.3 G RODay gate
SD-03 Product Data 2.2Vault Door and Frame
SD-07 Certificates
2.2 G ROVault Door and Frame
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 98 PAGES
08 34 59 3.1Installation SD-11 Closeout Submittals
1.2LEED Documentation 08 34 73 SD-02 Shop Drawings
2.1Wood Sound Retardant Doors 2.1Door Frames
SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Intumescent Seals and Gasketing
SD-06 Test Reports 1.3.3Acoustical Tests 1.3.3Air Infiltration Tests 1.3.3Positive Pressure Tests
SD-07 Certificates 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds
08 44 00 SD-02 Shop Drawings 1.5Glazed curtain wall system
SD-03 Product Data 1.5Glazed curtain wall system
1.14LEED
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 98 PAGES
08 44 00 1.13Preventive Maintenance and Inspection
2.2Metals For Fabrication 2.3Nonskinning Sealing Compound 2.4.1Metal Accessories 2.5Curtain-wall Framing Members 2.10Curtain-Wall Installation Materials 2.10.4Masonry Anchorage Devices 1.9Sample warranties
SD-04 Samples 1.4.2Mockup
SD-05 Design Data 1.3Calculations 2.4.5Finish 2.4.5Exposed-to-View Aluminum
Finish 1.5.6Seismic Calculations 2.1.7.3Insulating glass
SD-11 Closeout Submittals 1.8Warranty
08 51 13 SD-02 Shop Drawings
2.1 G ROWindows
1.10Fabrication Drawings
SD-03 Product Data 2.1Windows 2.2.2Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 98 PAGES
08 51 13 1.11 G ROWindow performance 2.3Mullions 2.2.4Accessories 1.11.5Thermal performance
1.7LEED
SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample
SD-05 Design Data G DOStructural calculations for deflectio;
1.4.3 G DODesign Analysis
SD-06 Test Reports 1.4.4Minimum condensation resistance factor
1.11.2.3 G DOStandard Airblast Test
SD-10 Operation and Maintenance Data
2.1 G ROWindows
08 71 00 SD-02 Shop Drawings
1.3 G ROHardware schedule
2.3.9 G ROKeying system;
SD-03 Product Data
2.3 G ROHardware items
1.7LEED
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 98 PAGES
08 71 00 3.1Installation SD-10 Operation and Maintenance Data
1.3 G ROHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting 08 81 00 SD-02 Shop Drawings
3.2Installation SD-03 Product Data
2.2Insulating Glass Units 1.3Glazing Accessories
1.6LEED
SD-04 Samples 2.2Insulating Glass Units 2.3.2Glazing Compound 2.3.5Tape 2.3.3.1Sealant
SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting
SD-11 Closeout Submittals 1.7Warranty
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 98 PAGES
08 91 00 2.2Metal Wall Louvers
1.6LEED
SD-04 Samples
1.4 G ROWall louvers
1.5 G ROWall louvers
09 22 00 SD-02 Shop Drawings
2.1 G ROMetal Support Systems
SD-03 Product Data
1.4LEED
09 29 00 SD-03 Product Data 2.1.1Gypsum Board 2.1.7Cementitious backer units 2.1.5Glass Mat Covered or Reinforced
Gypsum Sheathing 2.1.6Impact Resistant Gypsum Board 2.1.10Shaftwall Liner Panel 2.1.11Accessories
1.5LEED
SD-07 Certificates
2.1 G ROAsbestos Free Materials
SD-10 Operation and Maintenance Data
3.9Waste Management 09 30 13 SD-02 Shop Drawings
3.2 G RODetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 98 PAGES
09 30 13 2.3Mortar, Grout, and Adhesive 2.1Tile
1.2LEED
SD-04 Samples
2.1 G ROTile
2.1 G ROAccessories
2.1.4 G ROAccessories
2.1 G ROTransition Strips
2.4 G ROTransition Strips
2.3Grout
SD-07 Certificates 2.1Tile 2.3Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SD-10 Operation and Maintenance Data
3.2Installation 09 51 00 SD-02 Shop Drawings
1.2Approved Detail Drawings SD-03 Product Data
1.2.1Acoustical Ceiling Systems 2.1Acoustical Ceiling Systems
1.4LEED
SD-04 Samples 2.1Acoustical Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
This is the start of the file's text. The full file is on GovTribe.