JA51937_AMD5_Specs.pdf

PDF 1 MB Posted

Attached to
Basic Training Complex IV Phase I Federal contract opportunity
Solicitation number
W912HP-15-R-0004
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

W912HP-15-R-0004 JA51937_AMD5_Specs

View the file

Other files for this federal contract opportunity

Other files attached to Basic Training Complex IV Phase I, newest first.
File Type Posted
Award_Notice.pdf PDF
15R00040008Amendment_8.pdf PDF
15R00040007Amendment_7.pdf PDF
JA51937_AMD6_Specs.pdf PDF
JA51937_AMD6_CADD_Proposed_Grading_Plan.dgn —
JA51937_AMD6_CADD_Existing_Topography.dgn —
Amendment_6.pdf PDF
JA51937_AMD6_Drawings.pdf PDF
JA51937_AMD5_Drawings.pdf PDF
Amendment_5.pdf PDF
Amendment_4.pdf PDF
Amendment_3.pdf PDF
JA51937_AMD3_Specs.pdf PDF
JA51937_AMD3_Drawings.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
W912HP-15-R-0004_Solicitation.pdf PDF
CombineddrawingsJA51937_RTA_V2-V4.PDF PDF
JA51937_RTA_V1.pdf PDF
Combined_SpecsJA51937vol1-7.pdf PDF
Combined_Design_Analysis.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Trainee Barracks Complex JA51937 Ft. Jackson, SC

PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 05)

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29.37 LEED(TM) DOCUMENTATION

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.37 INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS

01 74 19.37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 02.00 10 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.80 COMMISSIONING

*5

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 83 30 SYNTHETIC SPORTS SURFACE

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 20 00.00 10 CONCRETE REINFORCING

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

04 21 13.13 NONBEARING MASONRY VENEER/STEEL STUD WALLS

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 12 00 STRUCTURAL STEEL

05 21 16 LONGSPAN STEEL JOIST FRAMING

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

PROJECT TABLE OF CONTENTS Page 2 (Revised by Amendment 05)

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 21 29 SPRAY-APPLIED FOAM INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 41 00 METAL SOFFIT PANELS

07 41 13 METAL ROOF PANELS

07 42 13 METAL WALL PANELS

07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 13 METAL ROLLING COUNTER DOORS

08 34 59 VAULT DOORS AND DAY GATES

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPET

09 83 13 ACOUSTICAL WALL TREATMENT

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 09 00.00 44 MISCELLANEOUS ITEMS

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 14 01 EXTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 22 39 FOLDING PANEL PARTITIONS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 56 13 *3 DELETEDSTEEL SHELVING

DIVISION 11 - EQUIPMENT

11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 24 13 ROLLER WINDOW SHADES

PROJECT TABLE OF CONTENTS Page 3 (Revised by Amendment 05)

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 SITE FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS (COVERED TRAINING CANOPY)

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 65 00 COOLING TOWERS

23 81 47 WATER-LOOP HEAT PUMP SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 12 21 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 V ARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

PROJECT TABLE OF CONTENTS Page 4 (Revised by Amendment 05)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 16 01.00 10 SMALL INTRUSION DETECTION SYSTEM

28 20 01.00 11 DOOR MONITORING SYSTEM

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEMS

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16 BASE COURSE FOR RIGID PAVING

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 51 15 NATURAL-GAS/LIQUID PETROLEUM GAS DISTRIBUTION

33 61 00 PREFABRICATED UNDERGROUND COOLING DISTRIBUTION SYSTEM

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

APPENDICES

Appendix A Asbestos Survey Reports

-- End of Project Table of Contents --

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 98 PAGES

Trainee Barracks Complex

01 30 00 SD-01 Preconstruction Submittals

1.4.1 G ROUtility Outage Requests

1.4.1 G ROUtility Connection Requests

1.4.2 G ROExcavation Permits

1.9Antiterrorism Operations Security

Requirements

1.12 G ROList of contact personnel

1.10 G ROProgress and completion pictures

1.7 G ROEnergy rebate and incentive

applications 01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROQualifications

3.4 G ROProject Schedule;

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29.37 SD-01 Preconstruction Submittals

1.4 G ROLEED Implementation Plan

3.1Preconstruction Meeting

SD-07 Certificates 3.1Pre-Closeout Meeting

SD-11 Closeout Submittals

1.5 G ROLEED Documentation Notebook

3.1Closeout Meeting

01 35 26 SD-01 Preconstruction Submittals

1.6 G ROAccident Prevention Plan (APP)

1.7 G ROActivity Hazard Analysis (AHA)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(Revised by Amendment 05)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 98 PAGES

01 35 26 1.6 G ROCrane Critical Lift Plan

1.5.1.2 G ROCrane Operators

SD-06 Test Reports 1.11.1Accident Notification 1.11.2Accident Reports 1.11.3Crane Reports

SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.12Hot work permit

1.13 G ROLicense Certificates

1.11.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan 01 45 35 SD-01 Preconstruction Submittals

3.1.2Written Practices 3.1.2NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Steel Truss Plant 2.1Steel Joist Institute Membership

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 98 PAGES

01 45 35 2.1Certificate of Compliance

1.5 G ROSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

2.1 G ROComprehensive Final Report

3.1.2 G ROComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction site plan

3.3.1 G ROTraffic control plan

SD-02 Shop Drawings

2.1.2 G ROSign Legend Orders;

01 57 19.37 SD-01 Preconstruction Submittals

1.3 G ROIndoor Air Quality (IAQ)

Management Plan SD-06 Test Reports

1.3.2Air contamination testing SD-11 Closeout Submittals

1.3.2LEED

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 G ROEnvironmental Protection Plan

1.8 G ROCondition Survey

01 57 23 SD-06 Test Reports 1.3.2Storm Water Inspection Reports for General Permit 1.3Erosion and Sediment Controls

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 98 PAGES

01 57 23 2.1.3Mill Certificate or Affidavit 01 62 35 SD-01 Preconstruction Submittals

1.7 G ROBiobased Products

01 74 19.37 SD-11 Closeout Submittals

1.5Records 01 78 02.00 10 SD-02 Shop Drawings

1.3.1 G ROAs-Built Record Drawings

SD-03 Product Data

1.3.2 G ROAs-Built Record of Equipment

and Materials

1.6.1 G ROWarranty Management Plan

1.6.6 G ROWarranty Tags

1.4 G ROSpare Parts Data

SD-10 Operation and Maintenance Data

1.6.1 G ROInstructions

SD-11 Closeout Submittals

1.3.1 G ROAs-Built Record Drawings

1.5 G ROCertification of EPA Designated

Items

1.3.5 G ROEquipment-In-Place List

1.11 G ROInterim Form DD1354

1.10 G ROFinal Cleaning

1.9 G RORed Zone Meeting Checklist

1.11 G ROChecklist for Form DD1354

3.1Release of Claim

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 98 PAGES

01 78 23 SD-10 Operation and Maintenance Data

1.2 G ROOperation and Maintenance

Manuals

01 91 00.80 SD-03 Product Data

1.11 G ROFinal Commissioning Plan

1.9.2 G ROCommissioning Schedule

1.8.3 G ROCx Related Submittals

1.8.3 G ROStart-up and Initial Checkout

Plans

1.8.3 G ROControls Contractor Initial

Checkout Plan

1.8.3 G ROTAB Plan and Approach

1.8.3 G ROPrefunctional Checklists

1.8.3 G ROFunctional Performance Tests

SD-06 Test Reports

1.8.3 G ROCommissioning Report

1.8.3 G ROTAB Progress reports

1.8.3 G RODraft TAB report

1.8.3 G ROFinal TAB report

1.8.3Cx Issues Log 1.8.3Cx Progress reports

1.8.3 G ROStart-up and initial checkout

reports SD-07 Certificates

1.5 G ROCommissioning Firm

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 98 PAGES

01 91 00.80 1.3.1 G ROCommissioning Specialist

1.5 G ROCommissioning Specialist

1.7 G ROCertificate of Readiness

SD-11 Closeout Submittals

1.8.3 G ROSystems Manual

1.8.3 G ROThermal Comfort Survey

02 41 00 SD-01 Preconstruction Submittals

1.10 G ROExisting Conditions

SD-07 Certificates

1.2.1 G RODemolition Plan

1.6 G RONotification

SD-11 Closeout Submittals 3.3.4Receipts

02 82 14.00 10 SD-02 Shop Drawings

1.4 GDetailed Drawings

SD-03 Product Data

3.6.3.1 GAsbestos Waste Shipment

Records 1.1Weight Bills and Delivery Tickets

GEncapsulants

1.9.1 GRespiratory Protection Program

3.6 GCleanup and Disposal

1.6.1 GQualifications

1.11Training Program 1.8.1Licenses, Permits, and

Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 98 PAGES

02 82 14.00 10 3.6.3.2 GAsbestos Management Plan SD-06 Test Reports

3.4Exposure Assessment and Air Monitoring

1.9Medical Surveillance Requirements

02 83 30 SD-03 Product Data 2.1Primer 2.2Rubber Surfacing

SD-07 Certificates 1.3Qualifications

SD-08 Manufacturer’s Instructions 2.1Primer 2.2Rubber Surfacing

SD-11 Closeout Submittals 1.4Warranty

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G ROFormwork

3.1.1 G ROFormwork

2.2.1Form Removal Schedule

SD-03 Product Data 2.2Form Materials

SD-05 Design Data 2.1Calculations

SD-06 Test Reports 3.2Inspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 98 PAGES

03 20 00.00 10 SD-02 Shop Drawings

3.1 G ROReinforcement

SD-07 Certificates 2.3Reinforcing Steel 1.3.1Qualified Welders 1.3.2Qualification of Steel Bar

Butt-Splicers 03 30 53 SD-02 Shop Drawings

1.5 G DOInstallation Drawings

SD-03 Product Data

2.2.3.1Air-Entraining Admixture 2.2.3.2Water-Reducing or Retarding

Admixture 2.2.8Curing Materials 2.2.5Expansion Joint Filler Strips, Premolded 2.2.6Joint Sealants - Field Molded

Sealants 2.4.1Waterstops 2.4.2Chemical Floor Hardener 3.2Conveying and Placing Concrete

2.3 G ROMix Design Data

2.3Ready-Mix Concrete 2.4.3Curing Compound

SD-06 Test Reports 2.2.2Aggregates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 98 PAGES

03 30 53 2.1.3 G ROConcrete Mixture Proportions 3.3.3.2Measurement of Floor

Tolerances

3.9.3 G ROCompressive Strength Testing

3.9.3 G ROSlump

3.9.3Air Content 2.2.4Water

SD-07 Certificates 2.2.1Cementitious Materials 2.2.1.2Pozzolan 1.5.1CPG for recycled materials or appropriate Waiver Form 2.2.2Aggregates 2.3Delivery Tickets

SD-08 Manufacturer’s Instructions 2.4.2Chemical Floor Hardener 2.4.3Curing Compound

04 20 00 SD-02 Shop Drawings

1.4.5 G RODetail Drawings

SD-03 Product Data 2.2Clay or Shale Brick 2.7.3Cement

1.6.2 G ROCold Weather Installation

2.8Water-Repellant Admixture

1.2.1LEED

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 98 PAGES

04 20 00 2.4 G ROConcrete Masonry Units (CMU)

2.2 G ROClay or Shale Brick

2.5 G ROArchitectural Cast Stone Items

2.10Anchors, Ties, and Bar

Positioners 2.14Expansion-Joint Materials 2.11Joint Reinforcement 1.4.3Portable Panel

SD-06 Test Reports 3.20.3Efflorescence Test 3.20.1Field Testing of Mortar 3.20.2Field Testing of Grout 2.7.3Masonry Cement 1.4.4Masonry Inspector Qualifications 2.4.4Fire-Rated CMU

SD-07 Certificates 2.2Clay or Shale Brick 2.3Concrete Brick 2.4Concrete Masonry Units (CMU) 2.10Anchors, Ties, and Bar

Positioners 2.14Expansion-Joint Materials 2.11Joint Reinforcement 2.7.3Masonry Cement 2.7.1Admixtures for Masonry Mortar 2.9.1Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 98 PAGES

04 20 00 1.4.2Contamination SD-08 Manufacturer’s Instructions

2.7.3Masonry Cement 04 21 13.13 SD-02 Shop Drawings

1.3.3Detail Drawings SD-03 Product Data

1.5LEED

2.4Insulation

SD-04 Samples 2.11Expansion Joint Materials 1.3.1Sample Panel

SD-06 Test Reports 3.1Calculations

SD-07 Certificates 2.2Joint Reinforcement 2.7.1Moisture Barrier 2.6Exterior Sheathing 2.8Veneer Anchors 2.1Welding 2.9.2Welding

05 05 23 SD-03 Product Data

1.5 G ROWelding Procedure Qualifications

1.5.4Welder, Welding Operator, and

Tacker Qualification 1.5.5Inspector Qualification 1.5.2Previous Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 98 PAGES

05 05 23 SD-06 Test Reports 3.2Quality Control 3.4Nondestructive Examination

05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 G ROErection Drawings

SD-02 Shop Drawings

1.5.2 G DOFabrication drawings

SD-03 Product Data 2.5.2Shop primer 2.4.1Welding electrodes and rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout

SD-06 Test Reports 2.5.2Class B coating 2.3Bolts, nuts, and washers 3.6.1.2Weld Inspection Reports 3.6.2.1Direct Tension Indicator Washer

Inspection Reports 3.6.3.1Bolt Testing Reports

SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers 1.3AISC Fabrication Plant Quality

Certification 1.3AISC Erector Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 98 PAGES

05 12 00 1.5.3.1Welding procedures and qualifications

2.4.1Welding electrodes and rods 05 21 16 SD-01 Preconstruction Submittals

1.4.2Welder qualification 1.4.2Material Safety Data Sheets

SD-02 Shop Drawings

1.4.1 G DOLongspan Steel Joist Framing

SD-06 Test Reports 3.4Erection inspection 3.4Welding inspections

SD-07 Certificates 1.4.1Accessories 1.4.2Certification of Compliance

05 21 19 SD-01 Preconstruction Submittals 1.5.2Welder qualification 1.5.2Material Safety Data Sheets

SD-02 Shop Drawings

1.5.1 G DOSteel joist framing

SD-06 Test Reports 3.4Erection inspection 3.4Welding inspections

SD-07 Certificates 2.1Accessories 1.5.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 98 PAGES

05 30 00 1.3.5Fabrication Drawings 2.3.2.1Cant Strips 2.3.2.2Ridge and Valley Plates 2.3.2.3Metal Closure Strips

SD-03 Product Data 2.2Accessories 2.1.3Galvanizing Repair Paint 2.1.6Galvanizing Repair Paint 2.1.5Joint Sealant Material 1.3.2Powder-Actuated Tool Operator 2.3.4Repair Paint 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.3Metal Floor Deck Units 2.3Metal Roof Deck Units 2.1.7Flexible Closure Strips 2.3Flexible Closure Strips 2.2Accessories

SD-07 Certificates

1.3.1 G DODeck Units

1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance

05 40 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 98 PAGES

05 40 00 1.6.1 G DOFraming Components SD-03 Product Data

2.1Studs, Joists SD-05 Design Data

1.6.2 G DOMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.1.1Welds 05 50 13 SD-02 Shop Drawings

2.10 G ROStructural Steel Door Frames

2.3Access Doors And Panels 2.6Expansion Joint Covers

2.9 G ROAngles And Plates

SD-03 Product Data 2.3Access doors and panels 2.4Control-joint covers 2.6Expansion joint covers 2.10Structural steel door frames

SD-04 Samples 2.6Expansion joint covers 2.4Control-joint covers

05 51 00 SD-02 Shop Drawings

2.1 G ROIron and Steel Hardware

2.1 G ROSteel Shapes, Plates, Bars and

Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 98 PAGES

05 51 00 2.11 G ROMetal Stair System SD-03 Product Data

2.2Structural Steel Plates, Shapes, and Bars

2.4Hot-Rolled Carbon Steel Sheets and Strips

2.3Hot-Rolled Carbon Steel Bars 2.5Galvanized Carbon Steel Sheets 2.6Gray Iron Castings 2.9Concrete Inserts 2.12Protective Coating

2.13 G ROSteel Pan Stairs

2.13.5 G ROSteel Stairs

SD-07 Certificates 1.3Welding Procedures 1.3Welder Qualification

SD-08 Manufacturer’s Instructions 2.2Structural Steel Plates, Shapes, and Bars 2.4Hot-Rolled Carbon Steel Sheets and Strips 2.3Hot-Rolled Carbon Steel Bars 2.5Galvanized Carbon Steel Sheets 2.7Malleable Iron Castings 2.12Protective Coating

05 51 33 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 98 PAGES

05 51 33 2.3Ladders 2.4Ship's ladders

SD-03 Product Data 2.3Ladders 2.4Ship's Ladders

05 52 00 SD-02 Shop Drawings

1.2 G ROFabrication Drawings

2.1 G ROIron and Steel Hardware

3.1 G ROIron and Steel Hardware

2.1 G ROSteel Shapes, Plates, Bars and

Strips

3.1 G ROSteel Shapes, Plates, Bars and

Strips SD-03 Product Data

1.2Structural Steel Plates, Shapes, and Bars

2.3Structural Steel Plates, Shapes, and Bars

1.2Structural Steel Tubing 2.4Structural Steel Tubing 1.2Hot-Rolled Carbon Steel Bars 2.5Hot-Rolled Carbon Steel Bars 1.2Concrete Inserts 2.7Concrete Inserts 1.2Protective Coating 2.9Protective Coating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 98 PAGES

05 52 00 1.2 G ROSteel Railings and Handrails

2.10 G ROSteel Railings and Handrails

1.2 G ROAnchorage and Fastening

Systems SD-07 Certificates

1.4.1Welding Procedures 1.4.2Welder Qualification

SD-08 Manufacturer’s Instructions 3.1Installation Instructions

06 10 00 SD-02 Shop Drawings

2.1 G RONailing Strips

SD-03 Product Data

1.9LEED

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.8Certificates of grade 1.7Preservative treatment

06 20 00 SD-02 Shop Drawings 1.3Detail Drawings

SD-03 Product Data

1.7LEED

SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance

06 41 16.00 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 98 PAGES

06 41 16.00 10 1.5.2Shop Drawings 2.11Shop Drawings Part 3Installation

SD-03 Product Data 2.1Wood Materials 2.9Wood Finishes 2.11.4.3Finish Schedule

1.3.1LEED

SD-04 Samples 2.3Plastic Laminates 2.6Cabinet Hardware

SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework Part 3Laminate Clad Casework

06 61 16 SD-02 Shop Drawings 1.5.2Detail Drawings 3.1Installation

SD-03 Product Data 2.1Solid polymer material 1.5.1Qualifications 2.3Fabrications

1.3LEED

SD-04 Samples

2.1 G ROMaterial

2.3.6 G ROCounter Tops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 98 PAGES

06 61 16 SD-06 Test Reports 2.1Solid polymer material

SD-07 Certificates 2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.2 G ROThermal Imaging Camera

SD-07 Certificates

1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G ROPressure Test Procedures

3.5.5 G ROAir Leakage Test Report

3.6.5 G RODiagnostic Test Report

07 21 13 SD-03 Product Data 2.1Block or board insulation 2.2Vapor retarder 2.3Pressure sensitive tape 2.4Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 98 PAGES

07 21 13 SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.4.1Adhesive

07 21 16 SD-03 Product Data 2.1Blanket Insulation 2.3Accessories

1.5LEED

SD-08 Manufacturer’s Instructions 3.3Insulation

07 21 29 SD-03 Product Data

2.1 G ROSpray Urethane Foam

SD-07 Certificates 1.3.1Qualification of Manufacturer 1.3.3Qualification of Applicator 2.2ICC Evaluation Report

SD-08 Manufacturer’s Instructions 2.1Spray Urethane Foam 3.3.1Surface preparation

07 22 00 SD-02 Shop Drawings 2.1.4Tapered Roof Insulation

SD-03 Product Data 2.3Fasteners 2.1Insulation

1.4.3LEED

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 98 PAGES

07 22 00 1.4.1Flame spread and smoke developed ratings

SD-07 Certificates 1.3Qualifications

SD-08 Manufacturer’s Instructions 2.3Fasteners 2.1Insulation

07 27 10.00 10 SD-02 Shop Drawings

1.3.2 G CAAir Barrier Assembly

SD-03 Product Data

2.1 G ROFluid-Applied Air Barrier/Moisture

Membrane

2.2 G ROAir Barrier Component Materials

SD-04 Samples

3.1.2 G ROMock-up

SD-06 Test Reports

1.8 G DODesign Review Report

3.1.3 G ROTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 41 00 SD-02 Shop Drawings

2.1 G ROSoffit Panels

2.1 G ROSoffit Panels

SD-03 Product Data

2.1 G ROSoffit panels

2.1 G ROSoffit panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 98 PAGES

07 41 00 2.2Attachment clips 2.3Accessories 2.3.1Fasteners 2.3.2Sealants

SD-04 Samples 2.1Soffit panels 2.1Soffit panels 2.3Accessories 2.3.2Sealants

SD-06 Test Reports 3.5Field Inspection 1.4.2Finish

SD-08 Manufacturer’s Instructions 3.3Installation

07 41 13 SD-02 Shop Drawings

1.4.5 G DORoofing Panels

1.4.5Flashing And Accessories

SD-03 Product Data 2.1Roof panels 1.4.5Factory-Applied Color Finish 2.4Accessories 1.4.5Fasteners 1.4.5Pressure Sensitive Tape 2.6Underlayment 2.7Gaskets and Sealing/Insulating

Compounds

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 98 PAGES

07 41 13 1.4.5Coil Stock

1.10LEED

SD-04 Samples

2.1 G RORoof Panels

1.4.5 G ROFactory-applied Color Finish

2.4Accessories 1.4.5Fasteners 1.4.5Flashing And Accessories 1.4.5Gutter/Downspout Assembly 1.4.5Gaskets and Sealant/Insulating

Compounds SD-05 Design Data

1.2.2Wind Uplift Resistance SD-06 Test Reports

1.2.1 G CALeakage Test Report

1.2.2Wind Uplift Test Report 2.2Factory Finish and Color

Performance Requirements SD-07 Certificates

2.1Roof Panels 1.4.5Coil stock compatibility 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

SD-08 Manufacturer’s Instructions 1.4.5Installation Manual

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 98 PAGES

07 41 13 1.8 G ROWarranties

3.9 G ROInformation Card

07 42 13 SD-01 Preconstruction Submittals

1.5.3 G ROQualification of Manufacturer

1.5.4 G ROQualification of Installation

Contractor

1.5.4.1 G ROQualification of Welders

1.8 G ROWarranty

SD-02 Shop Drawings

1.5.1.1 G ROInstallation Drawings

SD-03 Product Data 2.1LEED Product Data

2.2.1 G ROWall Panels

1.5.5Closure Materials 2.5.4.4Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint 1.5.5Accessories 2.5Accessories

SD-04 Samples

2.2.1 G ROWall Panels

1.5.3.1 G ROFasteners

2.5.3 G ROMetal Closure Strips

2.2.3 G ROFactory Color Finish

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 98 PAGES

07 42 13 1.5.1.2 G ROwind load design analysis SD-06 Test Reports

3.7.2 G ROLeakage Tests

1.3.2 G ROWind Load Tests

2.2.3.6 G ROCoating

2.2.3.6 G ROChalking

1.3.2 G ROSeismic Tests

SD-07 Certificates

1.5.3.1 G ROCoil Stock

1.5.3.1 G ROFasteners

1.5.3.1 G ROGalvanizing Repair Paint

1.5.3.1 G ROEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

SD-09 Manufacturer’s Field Reports

3.8.1 G ROManufacturer's Field Reports

SD-10 Operation and Maintenance Data

1.5.6 G ROMaintenance Instructions

SD-11 Closeout Submittals

1.8 G ROWarranty

07 53 23 SD-02 Shop Drawings

1.4Roof Plan Drawing SD-03 Product Data

2.2Cement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 98 PAGES

07 53 23 2.1.1 G ROEPDM Sheet 2.1.2Seam Tape 2.1.4Bonding Adhesive 2.1.3Lap Splice Adhesive 2.1.6Water Cutoff Mastic/Water Block 2.1.5Lap Cleaner, Lap Sealant, and

Edge Treatment 3.3Flashings 2.1.7Flashing Accessories 2.1.7Flashing Tape 2.1.8Fasteners and Plates 2.1.10Roof Insulation 1.12LEED Product Data 1.13LEED Product Data 2.1.9Pre-Manufactured Accessories

1.9 G ROwarranty

SD-05 Design Data

1.5.4 G ROWind Uplift Calculations

SD-07 Certificates 1.5.1Qualification of Manufacturer 1.5.2Qualification of Applicator

1.5.4 G ROWind Uplift Resistance

1.5.3 G ROFire Resistance

SD-08 Manufacturer’s Instructions

3.2.3 G ROMembrane Application

3.3.2 G ROMembrane Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 98 PAGES

07 53 23 2.1.2Seam Tape 3.2.4Tape Seams/Lap Splices 3.2.5Adhesive Seams/Lap Splices 3.2.6Perimeter Attachment 3.2.4Primer 3.2.7Fasteners 2.1.9Pre-Manufactured Accessories

1.7 G ROCold Weather

SD-11 Closeout Submittals 1.9Warranty 3.9Information Card 3.8Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

3.1.22Covering on flat, sloped, or curved surfaces

3.1.15Gutters 3.1.16Downspouts 3.1.23Expansion joints 3.1.19Splash pans 3.1.17Flashing for Roof Drains 3.1.10Base flashing 3.1.11Counterflashing 3.1.24Flashing at roof penetrations 3.1.12Reglets 3.1.18Scuppers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 98 PAGES

07 60 00 3.1.14Drip edge 3.1.20Open valley flashing 3.1.21Eave flashing 3.1.26Soffit and Fascia

SD-03 Product Data

1.5LEED

07 84 00 SD-02 Shop Drawings 1.2.3Firestopping Materials, with related assemblies SD-03 Product Data

1.6LEED

SD-07 Certificates

1.4.2Manufacturer's Technical Representative

Part 2Firestopping Materials 1.4.1Installer 3.3Inspection

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-03 Product Data

2.1 G RODoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 98 PAGES

08 11 13 2.7 G ROFrames 2.5Moldings

1.5LEED

08 11 16 SD-02 Shop Drawings

1.5.1 G RODoors, windows and frames

SD-03 Product Data

1.6LEED

SD-04 Samples 1.5.2Finish sample

SD-05 Design Data 1.2.1Calculations

1.5.3 G RODesign Analysis

SD-06 Test Reports 1.5.4Minimum Condensation

Resistance Factor

1.2.5.3 G ROStandard Airblast Test

SD-08 Manufacturer’s Instructions 2.1Doors and frames

08 14 00 SD-02 Shop Drawings

2.1 G RODoors

SD-03 Product Data 2.1Doors 2.2Accessories 2.3.6Water-resistant sealer 1.5warranty

2.1.2 G ROFire resistance rating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 98 PAGES

08 14 00 1.3LEED

SD-04 Samples

2.1Doors

2.3.5.2 G RODoor finish colors

SD-06 Test Reports 2.4Cycle-slam 2.4Hinge loading resistance

08 33 13 SD-02 Shop Drawings

1.4 G RODetail Drawings

SD-03 Product Data 1.6Warranty 2.1Rolling Counter Doors 3.1Installation 3.5Cleaning

SD-06 Test Reports 3.3Drop-test

SD-11 Closeout Submittals 1.2LEED Documentation

08 34 59 SD-02 Shop Drawings

2.1 G ROVault door Unit

2.3 G RODay gate

SD-03 Product Data 2.2Vault Door and Frame

SD-07 Certificates

2.2 G ROVault Door and Frame

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 98 PAGES

08 34 59 3.1Installation SD-11 Closeout Submittals

1.2LEED Documentation 08 34 73 SD-02 Shop Drawings

2.1Wood Sound Retardant Doors 2.1Door Frames

SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Intumescent Seals and Gasketing

SD-06 Test Reports 1.3.3Acoustical Tests 1.3.3Air Infiltration Tests 1.3.3Positive Pressure Tests

SD-07 Certificates 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds

08 44 00 SD-02 Shop Drawings 1.5Glazed curtain wall system

SD-03 Product Data 1.5Glazed curtain wall system

1.14LEED

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 98 PAGES

08 44 00 1.13Preventive Maintenance and Inspection

2.2Metals For Fabrication 2.3Nonskinning Sealing Compound 2.4.1Metal Accessories 2.5Curtain-wall Framing Members 2.10Curtain-Wall Installation Materials 2.10.4Masonry Anchorage Devices 1.9Sample warranties

SD-04 Samples 1.4.2Mockup

SD-05 Design Data 1.3Calculations 2.4.5Finish 2.4.5Exposed-to-View Aluminum

Finish 1.5.6Seismic Calculations 2.1.7.3Insulating glass

SD-11 Closeout Submittals 1.8Warranty

08 51 13 SD-02 Shop Drawings

2.1 G ROWindows

1.10Fabrication Drawings

SD-03 Product Data 2.1Windows 2.2.2Fasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 98 PAGES

08 51 13 1.11 G ROWindow performance 2.3Mullions 2.2.4Accessories 1.11.5Thermal performance

1.7LEED

SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample

SD-05 Design Data G DOStructural calculations for deflectio;

1.4.3 G DODesign Analysis

SD-06 Test Reports 1.4.4Minimum condensation resistance factor

1.11.2.3 G DOStandard Airblast Test

SD-10 Operation and Maintenance Data

2.1 G ROWindows

08 71 00 SD-02 Shop Drawings

1.3 G ROHardware schedule

2.3.9 G ROKeying system;

SD-03 Product Data

2.3 G ROHardware items

1.7LEED

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 98 PAGES

08 71 00 3.1Installation SD-10 Operation and Maintenance Data

1.3 G ROHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 08 81 00 SD-02 Shop Drawings

3.2Installation SD-03 Product Data

2.2Insulating Glass Units 1.3Glazing Accessories

1.6LEED

SD-04 Samples 2.2Insulating Glass Units 2.3.2Glazing Compound 2.3.5Tape 2.3.3.1Sealant

SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting

SD-11 Closeout Submittals 1.7Warranty

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 98 PAGES

08 91 00 2.2Metal Wall Louvers

1.6LEED

SD-04 Samples

1.4 G ROWall louvers

1.5 G ROWall louvers

09 22 00 SD-02 Shop Drawings

2.1 G ROMetal Support Systems

SD-03 Product Data

1.4LEED

09 29 00 SD-03 Product Data 2.1.1Gypsum Board 2.1.7Cementitious backer units 2.1.5Glass Mat Covered or Reinforced

Gypsum Sheathing 2.1.6Impact Resistant Gypsum Board 2.1.10Shaftwall Liner Panel 2.1.11Accessories

1.5LEED

SD-07 Certificates

2.1 G ROAsbestos Free Materials

SD-10 Operation and Maintenance Data

3.9Waste Management 09 30 13 SD-02 Shop Drawings

3.2 G RODetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 98 PAGES

09 30 13 2.3Mortar, Grout, and Adhesive 2.1Tile

1.2LEED

SD-04 Samples

2.1 G ROTile

2.1 G ROAccessories

2.1.4 G ROAccessories

2.1 G ROTransition Strips

2.4 G ROTransition Strips

2.3Grout

SD-07 Certificates 2.1Tile 2.3Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions

SD-10 Operation and Maintenance Data

3.2Installation 09 51 00 SD-02 Shop Drawings

1.2Approved Detail Drawings SD-03 Product Data

1.2.1Acoustical Ceiling Systems 2.1Acoustical Ceiling Systems

1.4LEED

SD-04 Samples 2.1Acoustical Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

This is the start of the file's text. The full file is on GovTribe.