Amendment_4.pdf
PDF 89 KB Posted
- Attached to
- Basic Training Complex IV Phase I Federal contract opportunity
- Solicitation number
- W912HP-15-R-0004
About this file
W912HP-15-R-0004 Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Award_Notice.pdf | ||
| 15R00040008Amendment_8.pdf | ||
| 15R00040007Amendment_7.pdf | ||
| JA51937_AMD6_Specs.pdf | ||
| JA51937_AMD6_CADD_Proposed_Grading_Plan.dgn | — | |
| JA51937_AMD6_CADD_Existing_Topography.dgn | — | |
| Amendment_6.pdf | ||
| JA51937_AMD6_Drawings.pdf | ||
| JA51937_AMD5_Drawings.pdf | ||
| Amendment_5.pdf | ||
| JA51937_AMD5_Specs.pdf | ||
| Amendment_3.pdf | ||
| JA51937_AMD3_Drawings.pdf | ||
| JA51937_AMD3_Specs.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| W912HP-15-R-0004_Solicitation.pdf | ||
| JA51937_RTA_V1.pdf | ||
| Combined_SpecsJA51937vol1-7.pdf | ||
| Combined_Design_Analysis.pdf | ||
| CombineddrawingsJA51937_RTA_V2-V4.PDF |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
SEE SECTION SF 30 BLOCK 14 CONTINUATION PAGE FOR ADDITIONAL INFORMATION.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-15-R-0004
X 9B. DATED (SEE ITEM 11)
28-Jul-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2015
CODE
US ARMY CORPS OF ENGINEERS, CHARLESTON
69-A HAGOOD AVENUE
CHARLESTON SC 29403
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP-15-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SUMMARY OF CHANGES
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been added by full text:
AMENDMENT FOUR CHANGES
SUMMARY OF CHANGES
1. Section 00 21 16 - Instructions to Proposers, paragraph 2.2.1.1:
DELETE the following: “Electronic submission sent via email or facsimile will not be accepted. Hand carried delivery or USPS/UPS/Fedex delivery of hard copies and CD/DVD is authorized.”
And REPLACE with: “See additional submission instructions in paragraph 2.4.3.”
2. Section 00 21 16 - Instructions to Proposers, paragraph 2.4.3:
DELETE the following: “Number of Copies. Submit original and 2 electronic copies and 4 hard copies of the proposal.”
And REPLACE with: “Volume Submission Instructions:
2.4.3.1: Volume I - Electronic Proposals. Each Offeror shall submit one (1) electronic copy of Volume I NO LATER THAN the date and time proposals are due. Facsimile submission is not authorized. Email submission is not authorized. ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE FEDBIZOPPS (FBO.GOV) “ELECTRONIC SUBMISSION” FEATURE. The FBO vendor user guide has information & instructions on how to utilize this feature (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).
2.4.3.1.1. File Size Limitations. Offerors are advised to follow the FBO instructions for uploading files larger than 10MB (java upload). FBO has not posted official file size limitations for its electronic response W912HP-15-R-0004 module, however it has been observed that uploads to FBO tend to be problematic when the files are sized 100MB or greater. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
2.4.3.1.2. File Names. To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention: Each filename shall begin with the solicitation number, followed by the word “RESPONSE”, followed by your firm’s name, and finally a brief file description. EXAMPLE: (1) “W912HP-15-R-0004 RESPONSE Firm name Volume I.pdf”
2.4.3.2 Volume II - Hand Carried or USPS/UPS/Fedex delivery. Each Offeror shall submit two (2) electronic CD/DVDs and four (4) hard copies of Volume II NO LATER THAN the date and time proposals are due. Submission sent via email, file transfer, FBO Electronic Submission, or facsimile will not be accepted for this Volume.”
3. Section 00 21 16 - Instructions to Proposers, paragraph 2.5.2, TAB C:
ADD the following after the last sentence: “NOTE: As an alternative to above, each offeror may submit a copy of their current online Representations and Certifications, also referred to as an Online Representations and Certifications Application (ORCA) to comply with the requirements of this TAB.”
4. Section 00 21 16 - Instructions to Proposers, paragraph 2.5.2, TAB F:
ADD the following after FINANCIAL INFORMATION: “In accordance with FAR Part 9.1, responsibility will be determined, prior to award, by the Contracting Officer through the performance of a pre-award survey. To facilitate this survey, each Offeror shall submit a copy of your most recent financial statements.
The statements must include a Balance Sheet and Income Statement. Include the names of banks and other financial institutions with which business is conducted (mailing addresses, Point of Contact and phone number). Please ensure the Bank is prepared to provide necessary information regarding average balances in your operating accounts, lines of credit and credit history. If the financial statements are more than 60 days old, attach a certificate stating that the financial condition is substantially the same, or if not the same, describe the changes which have taken place since the financial statements were prepared. Provide evidence of adequate financing arrangements, such as commitments from lending institutions, etc., to perform this contract. This information will be treated confidentially but may be verified. For a newly formed JV, each JV member must submit financial statements and information.”
5. Section 00 21 16 - Instructions to Proposers, paragraph 2.5.2, TAB G:
ADD the following after the last sentence: “The Subcontracting Targets are as follows: Small Business (40.0%), Small Disadvantaged Business (3.0%), Women-Owned Small Business (7.0%), HUBZone Small Business (1.0%), Veteran Owned Small Business (2.0%), Service-Disabled Veteran-Owned Small Business (3.0%).”
6. Section 00 22 16 - Supplementary Instructions to Proposers, paragraph 3.3.1:
DELETE “Offerors shall submit a resume demonstrating qualifications and experience of the person proposed for each of the four key personnel positions identified below.”
And REPLACE with “Offerors shall submit a resume demonstrating qualifications and experience of the person proposed for each of the two key personnel positions identified below.”
7. Section 00 21 16 - Instructions to Proposers, paragraph 8.1:
ADD the following after the last sentence: “The Government will analyze the financial information and make a risk assessment of the Offeror's financial capability to successfully accomplish this project.”
8. Section 00 21 16 - Instructions to Proposers, BIDDER INQUIRY (issued in Amendment 0001)
NOTICE: Bidder Inquiries will be reopened at a future date.
9. 52.228-1 BID GUARANTEE (SEP 1996)
REPLACE this clause in its entirety with reissued clause in this Amendment.
10. Section 00 72 00 – General Conditions, 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) –
ALTERNATE I (FEB 1995)
ADD the following “(d) An additional organized site visit has been scheduled for Tuesday, September 1, 2015 at 0900 EST.
(e) Participants will meet at--
Fort Jackson Visitor’s Center/Gate 2 Physical Security Office Strom Thurmond Blvd @ I-77 Interchange Fort Jackson, SC 29207
11. NOTICE: Contractors shall contact John Tyson at 803-312-2414 to confirm reservation for the site visit and to obtain instructions on how to access Fort Jackson.”Section 01 00 00 - General Requirements
ADD Wage Determination SC150057 05/22/2015; Construction Type: Heavy
-- End of Summary of Changes --
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be ___20_____ percent of the bid price or $_3M___, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been added by full text:
HEAVY CONSTRUCTION WD
General Decision Number: SC150057 05/22/2015 SC57
Superseded General Decision Number: SC20140057
State: South Carolina
Construction Type: Heavy
Counties: Calhoun, Lexington, Richland and Saluda Counties in South Carolina.
HEAVY CONSTRUCTION PROJECTS
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis‐Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 05/22/2015
* IRON0848‐001 12/01/2014
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 23.00 12.00
SUSC2011‐048 11/02/2011
Rates Fringes
CARPENTER, Includes Form Work....$ 14.85 0.00
LABORER: Common or General......$ 9.00 1.92
LABORER: Pipelayer..............$ 13.50 2.41
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.00 0.00
OPERATOR: Grader/Blade..........$ 20.11 1.39
OPERATOR: Loader................$ 10.50 1.98
TRUCK DRIVER.....................$ 14.15 2.32
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)