W912HP-15-R-0004 Amendment 5

View the file

Other files for this federal contract opportunity

Other files attached to Basic Training Complex IV Phase I, newest first.
File Type Posted
Award_Notice.pdf PDF
15R00040008Amendment_8.pdf PDF
15R00040007Amendment_7.pdf PDF
JA51937_AMD6_Specs.pdf PDF
JA51937_AMD6_CADD_Proposed_Grading_Plan.dgn —
JA51937_AMD6_CADD_Existing_Topography.dgn —
Amendment_6.pdf PDF
JA51937_AMD6_Drawings.pdf PDF
JA51937_AMD5_Specs.pdf PDF
JA51937_AMD5_Drawings.pdf PDF
Amendment_4.pdf PDF
JA51937_AMD3_Specs.pdf PDF
Amendment_3.pdf PDF
JA51937_AMD3_Drawings.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
W912HP-15-R-0004_Solicitation.pdf PDF
CombineddrawingsJA51937_RTA_V2-V4.PDF PDF
JA51937_RTA_V1.pdf PDF
Combined_SpecsJA51937vol1-7.pdf PDF
Combined_Design_Analysis.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE PURPOSE OF THIS AMENDMENT IS TO:

1. The required response date/time has changed from 9 Sep 2015, 2pm to 06 Oct 2015, 2pm EST.

2. SEE SECTION SF 30 BLOCK 14 CONTINUATION PAGE FOR ADDITIONAL INFORMATION.

3. ANNOUNCE THAT THERE IS NOT AN APPROVED BIDDERS LIST FOR THIS PROJECT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-15-R-0004

X 9B. DATED (SEE ITEM 11)

28-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2015

CODE

US ARMY CORPS OF ENGINEERS, CHARLESTON

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP-15-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time has changed from 09-Sep-2015 02:00 PM to 06-Oct-2015 02:00 PM.

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been added by full text:

AMENDMENT 5 CHANGES

SUMMARY OF CHANGES

1. Section 00 21 16 - Instructions to Proposers, BIDDER INQUIRY (issued in Amendment 0001)

ADD the following as a third paragraph: “New technical inquiries regarding ONLY the GOVERNMENT

RESPONSES TO PRIOR BIDDER INQUIRIES AND FOR THE CHANGES MADE BY

AMENDMENTS 0002 through 0005 are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet using Bidder Inquiry Key T2K78C-QGSGD8. All questions must be submitted in writing via aforementioned method no later than 3:00 P.M. EST, 10 September 2015. Inquiries entered that are not in reference to Government Responses to prior Bidder Inquiries or not in reference to the Amendments listed above will not be considered.”

2. Replacement Sections – Replace the following sections with the attached new sections, bearing the notation “(Revised by Amendment 05).” Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).:

Volume 1-3:

PROJECT TABLE OF CONTENTS

01 33 00 Attachment - SUBMITTAL REGISTER

10 10 00 - VISUAL COMMUNICATIONS SPECIALTIES

21 13 13.00 10 - WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

Volume 4:

11 46 01.06 - FOOD SERVICE EQUIPMENT

3. Added Sections – Add the following attached new sections, bearing the notation “(Added by Amendment 05):”

Volume 1-3:

02 82 14.00 10 - ASBESTOS HAZARD CONTROL ACTIVITIES

4. Replacement Drawings – Replace the following drawings with the attached new drawings:

Volume 1:

ES104, ES105, ES107, ES108, ES111, ES112, ES601, and ES603 with Revision 2 dated 26 August 2015 bearing the notation “REVISED IN ACCORDANCE WITH AMENDMENT 0005”

W912HP-15-R-0004

Volume 2:

Sheet S-506, A-130, A-222, A-601, A-603, and A-604 with Revision 1 dated 26 August 2015 bearing the notation “REVISED IN ACCORDANCE WITH AMENDMENT 0005”

(End of Summary of Changes)