Amd1.pdf
PDF 67 KB Posted
- Solicitation number
- W912HN-17-B-0003
About this file
Amd 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.01.02_Bid_Opening_Attendance_Sheet_-_W921HN-17-B-0003.pdf | ||
| B.01.02_Abstract_-_W912HN-17-B-0003.pdf | ||
| 17B03.PDF | ||
| Exam-UpperEastRiver-8june2017.xyz | XYZ file | |
| Exam-EastRiverTB-8ajune2017-20.xyz | XYZ file | |
| Exam-CedarHammock-9june2017.xyz | XYZ file | |
| Exam-SouthBrunsRiver-9june2017.xyz | XYZ file | |
| BrunsOSMDS-31may2017-50.xyz | XYZ file | |
| Exam-EastRiverTB-8june2017.xyz | XYZ file | |
| Amd2.pdf | ||
| Exam-LowerEastRiver-8june2017.xyz | XYZ file | |
| Exam-34+000to36+000-9june2017.xyz | XYZ file | |
| W912HN-17-B-0003_AMD1.pdf | ||
| 17B03.PDF | ||
| 17B03.PDF | ||
| W912HN-17-B-0003.PDF |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912HN-17-B-0003 Brunsw ick Inner Harbor Maintenance is amended as follow s:
The Bid Opening date and time is changed from 2:00pm ET, 27 June 2017 to 2:00pm ET, 30 June 2017.
See section 00 00 00 Procurement and Contracting Requirements for all applicable changes w ithin Amendment 0001.
All other conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN17B0003
X 9B. DATED (SEE ITEM 11)
25-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jun-2017
CODE
SAS EXECUTION BRANCH
USAED SAVANNAH
100 WEST OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN17B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
The following have been added by full text:
AMENDMENT 01 CHANGES
A. CONTRACT CHANGES: The scope of work in section SECTION 01 00 00 - GENERAL REQUIREMENTS has been updated. See below.
B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0001) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Sections 01 10 00.10 37 35 20 23
C. CONTRACT DRAWINGS – File No. CWK0580:
Sheets VH101, VH101A, VH102, VH102A, VH103, VH104, VH105, VH106, VH107, VH108, CB103, with Revision 1 dated 16 June 2017, are hereby added to and made a part of the Contract Drawings.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 27-Jun-2017 02:00 PM to 30-Jun-2017 02:00 PM.
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
SCOPE OF WORK
The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be two months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.
The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, GA, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County GA. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St.
Simon Sound, Brunswick River and East River.
Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately four months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that requires dredging and is primarily dredged every other year but is constantly monitored for shoaling. Also, the Cedar Hammock Range of Brunswick River (stations 16+000 to 21+366) will be dredged with a hydraulic cutter head dredge vs a hopper dredge.
The Cedar Hammock Range of Brunswick River (stations 10+000 to 25+000) will be dredged with a hydraulic cutter head dredge with disposal in the Andrews Island Disposal Area or a mechanical dredge with scows with disposal in the Brunswick Harbor ODMDS or Andrews Island Disposal Area. The contractor shall not overflow/pump for more than 5 minutes in high silt areas between stations 0+000 and the Sidney Lanier Bridge. No overflow is allowed above the Sidney Lanier Bridge. If the contractor elects to use dump scows to dispose of the material from the Cedar Hammock Range into the Brunswick Harbor ODMDS, all applicable restrictions regarding disposal in the ODMDS shall be adhered to. Road J and the area on the Turtle River side of the Andrews Island Disposal Area Dike are the only access points for pipeline access to the disposal area as indicated on the drawings.
Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River every other year, and approximately 85,000 cubic yards of material has been removed annually from this portion of Brunswick River. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Disposal Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland disposal area in the Brunswick Inner Harbor.
Advanced Maintenance Depths and Locations for Brunswick Inner Harbor is as follows:
East River, 0+000 to 2+500 project depth is 36’ with 1’ of advanced maintena nce East River, 2+500 to 4+500 project depth is 36’ with 5’ of advanced maintenance East River, 4+500 to 6+250 project depth is 36’ with 1’ of advanced maintenance East River, 6+250 to 12+000 project depth is 36’ with no advanced maintenance South Brunswick River, 0+000 to 7+000 project depth is 36’ with no advanced maintenance
Environmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August.
AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award http://jko.jten.mil/courses/atl1/launch.html%3B and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222‐ 38, FAR Clause 52.222‐35, FAR Clause 52.222‐37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set‐aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
(End of Summary of Changes) http://www.uscis.gov/e-verify) http://www.fedshirevets.gov/index.aspx http://www.dol.gov/vets/ http://benefits.va.gov/vow/ http://wtc.army.mil/modules/employers/index.html http://www.hiringourheroes.org/ http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-