W912HN-16-Q-0013

COMBINED SYNOPSIS/SOLICITATION

This notice is being posted as an avenue to provide Request for Quotes, W912HN-16-Q-0013.

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information in this notice. THIS

ANNOUNCEMENT CONSTITUTES THE ONLY SOLICITATION; QUOTES ARE BEING

REQUESTED AND A WRITTEN SOLICITATION WILL NOT BE ISSUED. This will be a

100% Small Business set-aside procurement. The solicitation number is W912HN-16-Q-0013, and the solicitation is issued as a Request for Quote (RFQ). The NAICS code is 561730 with a small business size standard of $7.5M. This solicitation document incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-89.

PARTIES INTERESTED IN RESPONDING TO THIS RFQ may submit their Quote in accordance with standard commercial practice (i.e. Quote form, letterhead, etc.) and MUST

INCLUDE THE FOLLOWING INFORMATION: Solicitation number; offeror's complete mailing and remittance addresses; discount terms, DUNS number, and Tax Identification

Number. Any questions regarding this solicitation MUST be submitted in writing by email to the point of contact below. Any prospective awardee shall be registered and active in the SAM database prior to any award of a contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation. Offerors may obtain information on registration and annual confirmation requirements via the Internet at http://www.acquisition.gov or by calling 866-606-8220. QUOTES ARE DUE NOT LATER THAN 11:00AM, EASTERN TIME, 09 SEPTEMBER 2016. PLEASE SUBMIT QUOTES

ELECTRONICALLY BY EMAIL to the attention of the Contract Specialist, Mr. Matthew

Schoewe, matthew.m.schoewe@usace.army.mil.

The completed Offeror Representations and Certifications-Commercial Items (FAR 52.212-3) or

Notation that company is registered in SAM (https://www.sam.gov) must be submitted along with each Quote.

The Government reserves the right to cancel this solicitation.

Description of Services

The work to be performed under this contract consists of: APPLICATION OF HERBICIDE on Dobbins ARB, Georgia http://www.acquisition.gov/ mailto:matthew.m.schoewe@usace.army.mil

REQUEST FOR QUOTE

REQUEST FOR QUOTE

(RFQ) W912HN-16-Q-0013

FOREST APPLICATION OF HERBICIDE AND WOODLAND MAINTENACE

DOBBINS ARB, GEORGIA

The NAICS code is 561730 with a small business size standard of $7.5M. This solicitation document incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-

89.

US Army Corps of Engineers – Savannah District

POC: Matthew Schoewe

Phone: (912) 652-5076

Email:matthew.m.schoewe@usace.army.mil

QUOTES DUE BY: 11:00 am (ET) on 09 September 2016

CONTRACTOR: ______________________________________________________

DUNS NO.: ______________________________________________________

CAGE CODE: ______________________________________________________

TAX ID NO.: ______________________________________________________

E-MAIL: ______________________________________________________

PHONE NO.: ______________________________________________________

DATE OF QUOTE: ____________________________________________________

Quote Prepared By:

(Printed Name and Title) (Signature)

The Contractor, by signing this document, understands and complies with the requirements listed in the Statement of Work (SOW) and shall provide equipment meeting or exceeding requirements.

NOTES TO OFFEROR

Note 1: Quotes shall meet the Technical Requirements to be eligible for an award. PARTIES

INTERESTED IN RESPONDING TO THIS RFQ may submit their Quote in accordance with standard commercial practice (i.e. Quote form, letterhead, etc.) and MUST INCLUDE THE

FOLLOWING INFORMATION: Solicitation number; offerors complete mailing and remittance addresses; discount terms, DUNS number, and Tax Identification Number. Any prospective awardee shall be registered and active in the SAM database prior to any award of a contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation. Offerors may obtain information on registration and annual confirmation requirements via the Internet at http://www.acquisition.gov or by calling 866-606-8220.

Note 2: All questions are to be directed no later than 11:00 a.m. Eastern time 4 days prior to quote due date to Matthew Schoewe at matthew.m.schoewe@usace.army.mil . Please courtesy copy, Mr. Bruce Helms at bruce.a.helms@usace.army.mil.

Note 3: The Taxpayer Identification Number may be used by the Government to collect and report on any delinquent amounts arising out of the contractor’s relationship with the

Government.

Note 4: The completed Offeror Representations and Certifications (FAR 52.204-8) or Notation that company is registered in SAM (https://www.sam.gov) must be submitted along with each

Quote.

Note 5: This acquisition will utilize Simplified Procedures pursuant to FAR 13.1. Emailed quotes are the required method of submission.

mailto:bruce.a.helms@usace.army.mil

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 40 Acre

FOLIAR SPOT APPLICATION OF HERBICIDES FOR WISTERIA, PRIVET

KUDZU, MIMOSA,& ENGLISH IVY CONTROL on 40 acres at Dobbins ARB, Georgia.

FOB: Destination

MILSTRIP: W33SJG62048280

NET AMT

0002 1 Acre VEGETATIVE WEED CONTROL FOR HIKING TRAIL on 1.0 acre at Dobbins

ARB, Georgia.

0003 20 Acre

FOLIAR & CUT STUMP APPLICATION OF HERBICIDE FOR PRIVET

CONTROL on 20 acres at Dobbins ARB, Georgia

0004 5 Acre ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of roadside/road shoulder spraying on Dobbins ARB, Georgia.

0005 1 Miles REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS along 1 mile of

Nature trail at Dobbins ARB, Georgia.

0006 1,000 Linear

Foot

SPREADING OF CYPRESS MULCH along 1000 liner feet of Nature trail at

Dobbins ARB, Georgia.

0007 20 Cubic

Yard

SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic yards, onto woods roads at Dobbins ARB, Georgia.

0008 40 Acre

OPTION FOLIAR SPOT APPLICATION OF HERBICIDES FOR WISTERIA, PRIVET

Georgia. OPTION 1

0009 1 Acre OPTION VEGETATIVE WEED CONTROL FOR HIKING TRAIL on 1.0 acre at Dobbins

ARB, Georgia. OPTION 1

0010 20 Acre

OPTION FOLIAR & CUT STUMP APPLICATION OF HERBICIDE FOR PRIVET

CONTROL on 20 acres at Dobbins ARB, Georgia. OPTION 1

0011 5 Acre OPTION ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of roadside/road shoulder spraying on Dobbins ARB, Georgia. OPTION 1

0012 1 Miles OPTION REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS along 1 mile of

Nature trail at Dobbins ARB, Georgia. OPTION 1

0013 1,000 Linear

OPTION SPREADING OF CYPRESS MULCH along 1000 liner feet of Nature trail at

Dobbins ARB, Georgia. OPTION 1

0014 20 Cubic

OPTION SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic yards, onto woods roads at Dobbins ARB, Georgia. OPTION 1

0015 40 Acre

OPTION FOLIAR SPOT APPLICATION OF HERBICIDES FOR WISTERIA, PRIVET

Georgia. OPTION 2

0016 1 Acre

ARB, Georgia. OPTION 2

0017 20 Acre

CONTROL on 20 acres at Dobbins ARB, Georgia. OPTION 2

0018 5 Acre OPTION ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of roadside/road shoulder spraying on Dobbins ARB, Georgia. OPTION 2

0019 1 Miles OPTION REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS along 1 mile of

Nature trail at Dobbins ARB, Georgia. OPTION 2

0020 1,000 Linear

Dobbins ARB, Georgia. OPTION 2

0021 20 Cubic woods roads at Dobbins ARB, Georgia. OPTION 2

0022 40 Acre

OPTION FOLIAR SPOT APPLICATION OF HERBICIDES FOR WISTERIA, PRIVET

Georgia. OPTION 3

0023 1 Acre

ARB, Georgia. OPTION 3

0024 20 Acre

CONTROL on 20 acres at Dobbins ARB, Georgia. OPTION 3

0025 5 Acre OPTION ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of roadside/road shoulder spraying on Dobbins ARB, Georgia. OPTION 3

0026 1 Miles OPTION REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS along 1 mile of

Nature trail at Dobbins ARB, Georgia. OPTION 3

0027 1,000 Linear

Dobbins ARB, Georgia. OPTION 3

0028 20 Cubic woods roads at Dobbins ARB, Georgia. OPTION 3

0029 40 Acre

OPTION FOLIAR SPOT APPLICATION OF HERBICIDES FOR WISTERIA, PRIVET

Georgia. OPTION 4

0030 1 Acre

ARB, Georgia. OPTION 4

0031 20 Acre

CONTROL on 20 acres at Dobbins ARB, Georgia. OPTION 4

0032 5 Acre OPTION ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of roadside/road shoulder spraying on Dobbins ARB, Georgia. OPTION 4

0033 1 Miles OPTION REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS along 1 mile of

Nature trail at Dobbins ARB, Georgia. OPTION 4

0034 1,000 Linear

Dobbins ARB, Georgia. OPTION 4

0035 20 Cubic woods roads at Dobbins ARB, Georgia. OPTION 4

Section C - Descriptions and Specifications

FOREST APPLICATION OF HERBICIDE AND WOODLAND MAINTENACE

DOBBINS ARB, GEORGIA

SCOPE OF WORK

A. The work to be performed under this contract consists of: Application of Herbicide, and

Nature Trail/Forest Road Maintenance, on Dobbins ARB, Georgia.

Project:

1. FOLIAR SPOT APPLICATION OF HERBICIDES FOR WISTERIA, PRIVET

KUDZU, MIMOSA, & ENGLISH IVY CONTROL on 40 acres at Dobbins

2. VEGETATIVE WEED CONTROL FOR HIKING TRAIL on 1.0 acre at Dobbins

3. FOLIAR & CUT STUMP APPLICATION OF HERBICIDE FOR PRIVET

CONTROL on 20 acres at Dobbins ARB, Georgia

4. ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of roadside/road shoulder spraying on Dobbins ARB, Georgia.

5. REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS along 1 mile of

6. SPREADING OF CYPRESS MULCH along 1000 liner feet of Nature trail at Dobbins

7. SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic yards, onto woods roads at Dobbins ARB, Georgia

B. Pre-Inspection: During the Request for Quote (RFQ) solicitation process, the Contracting

Officer’s Representative (COR), Mr. Ean Jones (912-652-5006) or the Technical Point of

Contact (TPOC) Mr. Nate VanLandingham (864-333-1117 or CELL 864-237-1397) will be available to show the areas to be treated on TUESDAY and WEDNESDAY prior to the quote due date from 8:00 A.M. to 3:00 P.M at Dobbins ARB, Georgia. Any contractor who wishes to attend these site visits should contact Mr. van Landingham no later than the MONDAY prior to the quote due date. Site inspections of the entire project area are highly recommended. Please contact Nate VanLandingham, TPOC, at Fort Gordon Forest Resources Office, (864-333-1117, 864-237-1397 mobile) to arrange a site visit prior to placing a quotation. Dobbins ARB is a secure installation. Visitor badges will be necessary for all personnel entering the installations.

The COR or TPOC must accompany prospective bidders while they are on post to inspect treatment areas.

Care must be taken when operating equipment through natural areas not to damage seedlings or mature trees. Herbicide treatments must be accomplished in such a manner as to limit the spray to the target plants and minimize drift onto pine seedlings or other non-target vegetation on the site. The contractor shall take all these variations into account when submitting a quote for each item.

No equipment shall be operated in or herbicides applied within a designated special plant (Pink

Lady Slipper) area located in the vicinity of the Nature Trail, and within designated forested areas south of the Runway at Dobbins ARB, Georgia. These off limit areas will be identified by orange flagging.

C. Contract Work Period: Herbicide work shall commence on or before 30 September 2016 and be completed not later than 30 June 2017. Reapplication of herbicides shall be completed by 15

July 2017. Option year work, if exercised, will follow the same schedule as the base year. Work shall commence on or before 30 September and be completed by 30 June and reapplication completed by 15 July of each subsequent year.

D. Pre-Work Conference: A pre-work conference is required on-site with the Contractor prior to commencement of work. Actual application work shall commence no later than 30

September 2016. Contractor shall submit to the COR, a work schedule indicating the locations, date, and time work shall be accomplished. The schedule must be approved by the COR. The

Contractor shall arrange his work so as not to cause interference with normal conduct of

Government business.

Mr. Nate VanLandingham, TPOC, shall be contacted within 7 days of planned commencement of operations to make necessary on-site coordination. He may be contacted at the Thurmond

Lake/Fort Gordon Forest Resources Office, phone number. (864-333-1117, 864-237-1397 mobile).

E. Hours of Work: The Contractor will have access to the areas where the work is to be performed from 7:00 a.m. to 6:00 p.m. Monday-Friday, excluding federal holidays. Any change to this schedule requires the approval of the COR.

F. Security Provisions: Dobbins ARB, GA is a secure installation. The Contractor and

Contractor personnel will be required to obtain an Access Pass from the installations Security

Office during the performance period. To gain access onto post the Contractor and his/her representative may be required to provide the following documents: driver’s license and/or another form of picture I.D., vehicle registration and proof of insurance, and social security number. No weapons are allowed on the installation. Vehicles are subject to inspection.

G. Applicable Drawings: The attached location maps are applicable to the work required herein and are made part of these specifications. The location maps show the general location of each project and approximate size.

H. Contractor Qualifications: Contractor shall provide a sufficient number of certified, trained and competent personnel to accomplish the work of this contract.

All work shall be completed to standards specified below and/or as included in Section 3 of the

2009 publication of Georgia’s Best Management Practices for Forestry, hereafter referenced as

State BMP guidelines.

The Contractor shall possess a valid State of Georgia Pesticide Contractor’s License and a State of Georgia Commercial Applicator License in the appropriate category. Each individual directly involved with the application and/or supervision of the application of specified chemicals shall possess in the appropriate category a valid State of Georgia Commercial Applicator License and shall be certified in accordance with DOD Directive 4150.7.

Copies of individual licenses shall be furnished to the COR prior to work.

I. Details: All details below apply to application of herbicides.

1. HERBICIDE, MATERIALS, LABOR, & EQUIPMENT: Contractor shall supply herbicides, mixing water, surfactants, mixing/storage tanks, vehicles, and materials, parts, labor and equipment necessary to perform the work. A water source may be provided for tank mixing on the military installation as designated by the COR, back flow prevention is required. Tank mixing is subject to be spot-checked by Dobbins ARB Environmental and the COR or his representative. All herbicides must be secured within vehicles at all times while on the installation. Vehicles shall not be left unattended unless properly locked and secured. All vehicles shall be maintained with a clean and orderly appearance, free from observable herbicide spills, residues, or build-up. Equipment, tanks, and transport vehicles shall have observable signage stating “Pesticide Storage” when in use with herbicide application. Overnight parking of equipment and vehicles shall be in a place designated by the COR. The contractor will be required to provide the categories of equipment and materials listed below. Contractor may be required to supply COR with appropriate proof of quality and quantity on all materials required below. Minimum equipment requirements are stated in paragraphs below.

2. NECESSARY EQUIPMENT: Contractor shall provide all necessary equipment, including personal protective equipment (PPE), for completing specified work and in accordance with product label. One (1) copy of the label and MSDS shall be furnished to the COR prior to work performance. The Contractor shall have a label and MSDS on site at all times and readily available for inspection at any time during application.

a. FOLIAR SPOT APPLICATION OF HERBICIDES FOR WISTERIA, PRIVET KUDZU, MIMOSA, & ENGLISH IVY CONTROL on 40 acres at

Contractor shall apply as a foliar spray herbicides on Wisteria, Privet, Kudzu &

Mimosa at the rate specified below.

1. Kudzu Control are: Escort XP – 4 ounces plus 1 quart of 90/10 non-ionic surfactant per acre of Kudzu foliage, tank mixed in the equivalent to

100 gallons of water per acre, and applied until kudzu foliage is saturated.

2. Privet Control is: Glyphosate (41%) – 8 quarts plus 1 quart of 90/10 non-ionic surfactant per acre of Privet foliage, tank mixed in the equivalent to 100 gallons of water per acre, and applied until Privet foliage is saturated.

3. Wisteria Control are: Transline – 21 ounces plus 1 quart of 90/10 non-ionic surfactant per acre of Wisteria foliage, tank mixed in the equivalent to 100 gallons of water per acre, and applied until Wisteria foliage is saturated.

4. Mimosa Control are: Escort XP - 4 ounces plus 1 quart of 90/10 non-ionic surfactant per acre of Mimosa foliage, tank mixed in equivalent to

100 gallons of water per acre, and applied until mimosa foliage is saturated.

5. Herbicide to be applied as foliar spray for English Ivy growing on the ground: For English Ivy growing in close proximity to the pond… Apply a

5% solution of Garlon 3A with water, plus .5% surfactant per 35 gallons of water per acre applied until the vegetation is saturated.

b. VEGETATIVE WEED CONTROL ON THE HIKING TRAIL on 1.0 acres at

Dobbins, ARB, GA

Contractor shall traverse the 1.0 mile Nature Trail on Dobbins ARB, GA and apply a 2% solution of Garlon 3A with water, plus .25% surfactant on vegetation until saturated existing within the 10 foot wide trail.

c. FOLIAR SPRAY & CUT STUMP APPLICATION OF HERBICIDE FOR

PRIVET CONTROL on 20 acres (tracts) at Dobbins ARB, Georgia.

Contractor shall treat privet using foliar spray and in combination with the cut stump method of herbicide application.

1. Herbicide to be applied as foliar spray for privet less than 6 feet in height:

a. Shall be finish spray solution that consists of 3qt per acre of aquatic use Glyphosate, (5.4 lb product/53%) , (Rodeo) and .5% non-ionic surfactant with at least 80% active ingredient

(appropriate for use over water). Solution shall be applied to target species at the rate of 15 Gallon Per Acre. This will result in a 5% spray solution. Vegetation will NOT be sprayed until wet.

Application method will be by back pack sprayer or equipment capable and calibrated to low volume per acre broadcast application. This application method shall be applied between the dates of 15 April and 31 May of each year, unless otherwise instructed by the COR.

2. Herbicide to be applied as stump treatment for privet greater than 6 feet in height:

a. Garlon 4 undiluted sprayed or painted on the severed stump will be used in the upland terrestrial areas unless the proximity to water dictates the use of Aquatic labeled chemical.

b. When in close proximity to water or in standing water, use

Rodeo Herbicide (or similar aquatic generic) undiluted sprayed or painted on the severed stump

Additional requirements:

1. Privet bushes greater than 6 feet in height shall be severed and the rooted stump shall be treated with chemical

2. Stumps shall be cut as low as possible and not to exceed

6 inches in height

3. Contractor shall apply a marking dye to severed stumps.

4. Contractor shall apply herbicide to the cut stump within

5 minutes following severance.

d. ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of roadside/road shoulder/spraying on Dobbins ARB, Georgia

1. Road right of way spraying will be done along roads that are closed in from over growth. Roads needing to be sprayed will be determined by

COR or TPOC and applied via broadcast equipment by driving down the road side until vegetation is saturated.

2. Contractor will apply herbicide tank mix with appropriate equipment to completely saturate all vegetation growing along designated roads.

3. Tank mix to be used will consist of Roundup Pro (or any Glyphosate consisting of 41% or higher concentrate of active ingredient) and Garlon 4 along with a Non Ionic surfactant of at least 80% active ingredient.

a. Will be applied at the rate of 5qt/acre (2.5% concentration) of

Roundup with 16oz of Garlon4 per acre

b. The mix will be applied at the application rate of 50 gallons of solution to the acre.

e. REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS along 1 mile of Nature trail at Dobbins ARB, Georgia.

Contractor will remove any live or dead vegetation 4 foot (each side) of center line of trail for a total of 8 foot width along the one mile nature trail on

DARB. This will consist of branches, vines, brush, grass and trees. No trees with a stump diameter larger than 8 inches will be removed from this area, unless they are dead. Care will be taken not to damage live trees that will remain in or near the trail. Mechanical removal and equipment will be allowed as long as it doesn’t result in excessive soil damage or rutting, as determined by the contracting officer representative. All grasses, trees, vines, and other vegetation will be trimmed to ground level 2 foot from centerline of the trail or 4 foot in width, the outside 2 foot of the corridor can be trimmed down to a height approximately 2 inches from the ground. All dead logs and trees will be cut and removed to at least 4 foot from centerline along each side of the path. Debris can be relocated to the outside of the work area in the adjacent woods. All over hanging branches will be trimmed up to a height no less than 8 foot from ground level along this 8 foot corridor (4 foot from center line). Certain tree branches may be allowed to stay by direction of the contracting officer for specific reasons. There is an area of Pink Lady Slipper plants along the trail; at no time will any work happen without direct supervision of the contracting officer representative. This area may have the width of the trail narrowed to preserve and protect plants in the area.

f. SPREADING OF CYPRESS MULCH along 1000 liner feet of Nature trail at

Apply commercially available cypress mulch to 1000 linear feet on the

Nature Trail at DARB as directed by contracting officer representative. Small equipment capable of operating in an 8ft corridor will be allowed as long as no damage to surrounding trees and no excess damage (rutting, severe compaction) to soil in the surrounding area occur. Mulch will be spread to a uniform and average thickness of 2 inches in depth and will be 4 feet wide starting at point designated by contracting officer representative.

g. SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic yards onto woods roads at Dobbins ARB, Georgia.

Material will be spread either in one contiguous pour or in several different spots according to contracting officer representatives’ direction. All areas will be accessible by dump truck. Material will be spread to an average of 2 inches in depth; variation in thickness will be allowed to fill possible low spots and depressions as directed by contracting officer representative.

3. ALTERNATE PROPOSAL: The Contractor may propose to use herbicides other than the herbicides listed above. If a Contractor proposes to use herbicides other than those listed above he shall list the herbicides and the treatment rate in the quote. The Government will make a determination as to whether or not any proposed herbicides other than those listed above and the treatment rate are acceptable or unacceptable.

J. Contractor Equipment and Materials: The contractor shall be required to provide all equipment, labor, and materials necessary and correctly execute this work. All work shall be subject to approval of the COR for compliance with this scope of work.

Bidders shall submit with their bids a general description detailing his/hers methods of operation to accomplish each task. Include within this description the manpower, types/characteristic of equipment to be used and the method of operation to make foliar and cut stump applications of herbicides, vegetation removal, mulch spreading, and a timeline for completion.

K. General:

1. CLEAN WATER ACT: All work must be accomplished in accordance with the provisions of the Clean Water Act. According to Section 404 (40 CFR Part 232.3), this forest roadwork is exempt from further permitting provided fifteen baseline provisions are met. These provisions are listed in Section 3.3.1 of Georgia’s Best Management Practices for Forestry and the contractor is required to fully comply with them all. Use of temporary silt fencing or other filtering devices shall be required when working near running streams to deter silting during construction activities. The contractor is responsible for proper installation of temporary filtering devices prior to construction activity in these areas.

2. WASTE: If any hazardous waste (gasoline, used motor oil, etc.) is released into the environment during operations, it must be accumulated, managed and manifested off the installation in accordance with the regulations of the Resource Conservation and Recovery Act

(40 CFR 260 – 280) and State of Georgia hazardous waste regulations. All waste manifests will be only signed by authorized Dobbins ARB personnel. The COR shall be notified immediately of the occurrence of any such event. Contractor shall be responsible for reporting, cleanup, and proper disposal of any hazardous waste generated. No petroleum products, oils, or lubricants

(POL) may be willfully discharged into the environment, including spills due to negligence.

Care must be taken when maintaining equipment not to release POL’s onto the ground, and the contractor is responsible for immediate cleanup and reporting of any such accidental release as discussed in the pre-work conference.

3. ACCESS: Ingress/egress of all equipment deliveries shall be accomplished through use of the contractor’s gate (Gate 2). Contractor shall be required to register all vehicles, equipment, and personnel with Base Security Police prior to commencement of work.

4. MONITORING WELLS: Several active monitoring wells are located in the vicinity of the work. These wells appear as a section of pipe or a steel post approximately three feet (3’) in height from ground level. No work shall be allowed within forty feet (40’) of these wells.

Manholes for underground utilities exist along some of the work area. All efforts shall be taken not to damage these wells, manholes, or any other fixed utility or structure occurring on the base.

L. Superintendence by the Contractor: The Contractor shall give his personal superintendence to the work or provide a competent Superintendent on the work site at all times during progress, with the authority to act on his or her behalf. The superintendent shall coordinate daily with the

COR to advise of contract progress and to request access to upcoming work sites. A pre-work conference between the COR and the Contractor is required on-site prior to commencement of work.

M. Check-In Locator: The Contractor shall check in each workday at a site designated by the

COR. At the time of check-in the Contractor shall indicate the work and the sites of work for that date if different from previously scheduled activities.

N. Quality Control: The Contractor shall maintain a self-inspection system where the

Superintendent identifies and promptly corrects contract performance deficiencies.

O. Quality Assurance: The government will provide quality assurance by monitoring the quality control system, inspecting contract performance and reporting deficiencies to the Superintendent for correction.

P. Container Disposal: Contractor shall reseal and dispose of empty pesticide containers off the installation at an authorized disposal site. All containers shall be tripled rinsed and the rinsate to go into tank sprayer and sprayed on target vegetation. The work area shall be cleared daily of cans, container, or lunch articles deposited by the contractor.

Q. Herbicide Effectiveness: Contractor is required to obtain a 95% minimum kill within 2 weeks of application of each treatment area. The Contractor will be solely responsible for herbicide effectiveness. The COR will evaluate chemical effectiveness within 2 weeks following treatment to assess results. If vegetative kill is inadequate, the Contractor must re-apply chemical until a 95% kill is attained.

R. Care shall be taken to prevent chemical from entering streams or open water and all herbicide is to be applied in accordance with chemical labels. The herbicides shall be applied in such a manner as to prevent toxic exposure to personnel, pets, wildlife, ornamental plants, and any other non-target components of the environment. Applications shall not be made during or prior to imminent rainfall, immediately after heavy rains, rainfall of more than 1 inch in 24 hours, or while runoff is occurring, or following frost.

S. Care shall be taken to prevent chemical drift. The Contractor shall perform in strict accordance with the provisions of the Clean Air Act as applicable to this contract, including, but not limited to, no open burning or fugitive emissions. Extra care shall be taken to prevent drift off installation property to include, but not limited to, proper consideration of wind direction and variability at time of application.

T. Reports: Accurate records of the amounts of herbicide used shall be maintained and presented to the COR and application quantities must be closely tracked and presented to the

COR to insure proper reporting of quantity of active ingredients applied. The Contractor shall provide a daily report of active ingredient applied on DD Form 1532-1 which will be furnished by the COR. Report of pounds of active ingredient of specified herbicide applied per site or group of sites must be provided to the COR immediately following application. Herbicide usage records shall be completed daily (within 24 hours of application) and made immediately available on-site for inspection upon request of the COR. These daily usage reports shall be provided to the project office by mail at a minimum of once per workweek. Both postal and e-mail addresses shall be provided to the Contractor by the COR at the pre-work conference.

U. Antiterrorism/Operations Security:

1. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND

PROCEDURES: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency

Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor

Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition

(FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

2. FOR CONTRACTORS WHO DO NOT REQUIRE CAC, BUT REQUIRE ACCESS

TO A DOD FACILITY OR INSTALLATION: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime

Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database

(TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

3. SUSPICIOUS ACTIVITY REPORTING TRAINING (E.G. IWATCH,

CORPSWATCH, OR SEE SOMETHING, SAY SOMETHING): The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT calendar days after the completion of the training.

4. PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the

Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible

Candidates must be provided to the COR no later than 3 business days after the initial contract award.

V. Contract Manpower Reporting Requirement (CMRA): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address:

https://contractormanpower.army.pentagon.mil. The required information includes: (1)

Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative; (2)

Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-contractors); (7) Total payments (including sub-contractors); (8) Predominant Federal Service

Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army

Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.

W. Payments: For any contract resulting from this solicitation payment shall be made as follows: Upon the successful completion of the work outlined in the specification for:

1. BASE YEAR:

a. CLIN 0001 - FOLIAR SPOT APPLICATION OF HERBICIDES FOR

WISTERIA, PRIVET KUDZU, MIMOSA, & ENGLISH IVY CONTROL on 40 acres at Dobbins ARB, Georgia.

b. CLIN 0002 - VEGETATIVE WEED CONTROL FOR HIKING TRAIL on 1.0 acre at Dobbins ARB, Georgia.

c. CLIN 0003 - ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of roadside/road shoulder spraying on Dobbins ARB, Georgia.

d. CLIN 0004 - FOLIAR & CUT STUMP APPLICATION OF HERBICIDE FOR

PRIVET CONTROL on 20 acres at Dobbins ARB, Georgia

e. CLIN 0005 - REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS along 1 mile of Nature trail at Dobbins ARB, Georgia.

f. CLIN 0006 - SPREADING OF CYPRESS MULCH along 1000 liner feet of

g. CLIN 0007 - SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic yards onto woods roads at Dobbins ARB, Georgia.

2. OPTION YEAR 1:

a. CLIN 0008 - FOLIAR SPOT APPLICATION OF HERBICIDES FOR

b. CLIN 0009 - VEGETATIVE WEED CONTROL FOR HIKING TRAIL on 1.0

c. CLIN 0010 - ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of

d. CLIN 0011 - FOLIAR & CUT STUMP APPLICATION OF HERBICIDE FOR

e. CLIN 00012- REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS

f. CLIN 0013 - SPREADING OF CYPRESS MULCH along 1000 liner feet of

g. CLIN 0014 - SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic

3. OPTION YEAR 2:

a. CLIN 0015 - FOLIAR SPOT APPLICATION OF HERBICIDES FOR

b. CLIN 0016 - VEGETATIVE WEED CONTROL FOR HIKING TRAIL on 1.0

c. CLIN 0017 - ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of

d. CLIN 0018 - FOLIAR & CUT STUMP APPLICATION OF HERBICIDE FOR

e. CLIN 0019 - REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS

f. CLIN 0020 - SPREADING OF CYPRESS MULCH along 1000 liner feet of

g. CLIN 0021 - SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic

4. OPTION YEAR 3:

a. CLIN 0022 - FOLIAR SPOT APPLICATION OF HERBICIDES FOR

b. CLIN 0023 - VEGETATIVE WEED CONTROL FOR HIKING TRAIL on 1.0

c. CLIN 0024 - ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of

d. CLIN 0025 - FOLIAR & CUT STUMP APPLICATION OF HERBICIDE FOR

e. CLIN 0026 - REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS

f. CLIN 0027 - SPREADING OF CYPRESS MULCH along 1000 liner feet of

g. CLIN 0028 - SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic

5. OPTION YEAR 4:

a. CLIN 0029 - FOLIAR SPOT APPLICATION OF HERBICIDES FOR

b. CLIN 0030 - VEGETATIVE WEED CONTROL FOR HIKING TRAIL on 1.0

c. CLIN 0031 - ROAD RIGHT- OF- WAY SPRAYING consisting of 5 acres of

d. CLIN 0032 - FOLIAR & CUT STUMP APPLICATION OF HERBICIDE FOR

e. CLIN 0033 - REMOVAL OF VEGETATION AND VEGETATIVE DEBRIS

f. CLIN 0034 - SPREADING OF CYPRESS MULCH along 1000 liner feet of

g. CLIN 0035 - SPREADING OF ASPHALT MILLINGS in the amount of 20 cubic

The contractor shall submit an invoice and subsequently receive payment in accordance with the payment terms of the contract.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 26-SEP-2016 TO

31-JUL-2017

N/A DOBBINS AIR FORCE BASE

NATHANIEL VAN LANDINGHAM

1291 COBB PARKWAY S.

MARIETTA GA 30067

864-333-1117

W912HN

0002 POP 26-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 26-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 26-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 26-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 26-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 26-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 01-AUG-2017 TO

31-JUL-2018

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 01-AUG-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 01-AUG-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 01-AUG-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 01-AUG-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 01-AUG-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 01-AUG-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 01-AUG-2018 TO

31-JUL-2019

N/A (SAME AS PREVIOUS LOCATION)

0016 POP 01-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0017 POP 01-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 01-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0019 POP 01-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0020 POP 01-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0021 POP 01-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0022 POP 01-AUG-2019 TO

31-JUL-2020

N/A (SAME AS PREVIOUS LOCATION)

0023 POP 01-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0024 POP 01-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0025 POP 01-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0026 POP 01-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0027 POP 01-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0028 POP 01-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0029 POP 01-AUG-2020 TO

31-JUL-2021

N/A (SAME AS PREVIOUS LOCATION)

0030 POP 01-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0031 POP 01-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0032 POP 01-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0033 POP 01-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0034 POP 01-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0035 POP 01-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

Section H - Special Contract Requirements

WAGE DETERMINATION

Wage Determination can be found at www.wdol.gov

SCA Wage Determination 15-4471 revision 2 dated 06/28/2016 http://www.wdol.gov/

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-13 System for Award Management Maintenance JUL 2013

52.204-18 Commercial and Government Entity Code Maintenance JUL 2015

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information

Systems

JUN 2016

52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014

52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7997 (Dev) Prohibition on Contracting with Entities that Require Certain

Internal Confidentiality Agreements (Deviation 2016-O0003)

OCT 2015

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7006 Billing Instructions OCT 2005

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting.

DEC 2015

252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013

252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Aug 2016)

AUG 2016

252.225-7002 Qualifying Country Sources As Subcontractors AUG 2016

252.225-7036 Buy American--Free Trade Agreement--Balance of Payments

Program--Basic (AUG 2016)

AUG 2016

252.225-7048 Export-Controlled Items JUN 2013

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.244-7000 Subcontracts for Commercial Items JUN 2013

CLAUSES INCORPORATED BY FULL TEXT

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (JUN 2016)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19

U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995)

(41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June

2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment

Act of 2009.)

XX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L.

111-117, section 743 of Div. C).

___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41

U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014)

(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

XX (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Oct 2001) of 52.219-9.

____ (iii) Alternate II (Oct 2001) of 52.219-9.

____ (iv) Alternate III (Oct 2015) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.

657f).

XX (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-

Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns

Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

XX (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

XX(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2016) (E.O. 13126).

XX (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

XX (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).

____ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

XX (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

____ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

XX (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in

22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May

2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

XX (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).

____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(June, 2016) (E.O. 13693).

____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and

13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

(40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (41)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s

13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

XX (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O.

13513).

____ (43) 52.223-20, Aerosols (June, 2016) (E.O. 13693).

(44) 52.223-21, Foams (June, 2016) (E.O. 13693).

____ (45) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____(46) (i) 52.225-3, Buy…

This is the start of the file's text. The full file is on GovTribe.