QUESTIONS_AND_ANSWERS_SET_4.doc

DOC document 24 KB Posted

Attached to
Upgrade Breakroom 671
Solicitation number
W912GY16T0035
Issued by

View the file

Other files

File Type Posted
BLDG_671_BREAKROOM_CABINET.pdf PDF
Questions_and_Answers_Set_5.doc DOC document
Epoxy_Broadcast_Floor_Coating_system.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Questions_and_Answers_Set_3.doc DOC document
Questions_and_Answers_Set_2.doc DOC document
Questions_and_Answers_Set_1.doc DOC document
Asbestos_Survey.pdf PDF
Asbestos_Floor_Tile_Report_671_Break_room_26_May_16.pdf PDF
Amendment_0001.pdf PDF
W912GY-16-T-0035.pdf PDF
Drawing_-_671_Breakroom_Cabinet.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS SET 4

1. Do all existing outlets demo ?

ANSWER: No

2. Clarify product for Epoxy floor system ?

ANSWER: See attached. Match the specs.

3. Does shared water supply from drinking fountain need filtration ?

ANSWER: Yes

4. Center of floor Receptacles ?Do we abandon ?

ANSWER: No.

5. Conduit . Core drilling allowed or is there existing penetrations to use?

ANSWER: Drill as needed.

6. Is it possible for SIAD employees to use other entry/exit. During Project?

ANSWER: Yes.

7. Is there a color they would like the epoxy floor ?

ANSWER: Light earth tone.

8. Has anyone verified that Panel has the spare 160 amp spare ampacity to handle this and the (5) 20 amp 120 volt loads required to complete this project? The combined loads of the new circuits would be the maximum allowed on a 225 amp panel.

ANSWER: Yes, the smaller capacity is fine.