Solicitation_W912GY-16-T-0005.pdf
PDF 336 KB Posted
- Attached to
- Repair Roll Up Doors
- Solicitation number
- W912GY-16-T-0005
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLIN_0007_P2_Door_Statement_of_Work_Update.doc | DOC document | |
| Questions_and_Answers_Roll_Up_Doors.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912GY-16-T-0005 10-Nov-2015
b. TELEPHONE NUMBER
530-827-4258
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 10 Dec 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912GY9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
TAMARA A. GAGE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
SIERRA ARMY DEPOT
CONTRACTING OFFICE
74 C STREET BUILDING 60
HERLONG CA 96113
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W62G2W 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
TEL: FAX:
530-827-4722FAX:
TEL: 530-827-5146 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
7,500,000
NAICS:
811310
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF80
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912GY-16-T-0005
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Inspect Door 305
FFP
Inspect door and provide quote for repair of roll up door 305 in accordance with statement of work.
FOB: Destination
NSN: AASSVC524002UD
MILSTRIP: W62G2W524002UD
PURCHASE REQUEST NUMBER: W62G2W524002UD
NET AMT
0002 1 Lot Repair Door Motor 318
FFP
Repair roll up door motor, replace slats and inspect door 318 and per statement of work.
FOB: Destination
NSN: AASSVC524002UC
MILSTRIP: W62G2W524002UC
PURCHASE REQUEST NUMBER: W62G2W524002UC
0003 1 Lot Inspect Door 362
FFP
Inspect door and provide quote for repair of roll up door 362 in accordance with statement of work.
FOB: Destination
NSN: AASSVC524002UB
MILSTRIP: W62G2W524002UB
PURCHASE REQUEST NUMBER: W62G2W524002UB
0004 1 Lot Replace Roll up Door 206
FFP
Replace Roll up Door 206 per statement of work.
FOB: Destination
NSN: AASSVC524002U9
MILSTRIP: W62G2W524002U9
PURCHASE REQUEST NUMBER: W62G2W524002U9
0005 1 Lot Inspect Roll up Door 235
FFP
Inspect door and provide quote for repair of roll up door 235 in accordance with statement of work.
FOB: Destination
NSN: AASSVC524002U8
MILSTRIP: W62G2W524002U8
PURCHASE REQUEST NUMBER: W62G2W524002U8
0006 1 Lot Inspect Door 210
FFP
Inspect door and provide quote for repair of roll up door 210 in accordance with statement of work.
FOB: Destination
NSN: AASSVC524002U7
MILSTRIP: W62G2W524002U7
PURCHASE REQUEST NUMBER: W62G2W524002U7
0007 1 Lot OPTION Replace Edge Sensors on Doors P2
FFP
Replace roll up door sensors per statement of work. Subject to availability of funds.
FOB: Destination
0008 1 Lot Inspect Roll up Door Motors 543
FFP
Inspect door motors and provide quote for repair of roll up door 543 in accordance with statement of work.
FOB: Destination
NSN: AASSVC524002U5
MILSTRIP: W62G2W524002U5
PURCHASE REQUEST NUMBER: W62G2W524002U5
0009 1 Lot Repair Door 79
FFP
Replace Door 79 in accordance with statement of work.
FOB: Destination
NSN: AASSVC524002U3
MILSTRIP: W62G2W524002U3
PURCHASE REQUEST NUMBER: W62G2W524002U3
0010 1 Lot Replace Door 310
FFP
Replace roll up door bldg 310 in accordance with statement of work.
FOB: Destination
NSN: AASSVC524002U2
MILSTRIP: W62G2W524002U2
PURCHASE REQUEST NUMBER: W62G2W524002U2
0011 1 Lot Repair Miscellaneous Doors and Motors
FFP
Repair miscellaneous roll up doors and motors per statement of work.
FOB: Destination
NSN: AASSVC524002U1
MILSTRIP: W62G2W524002U1
PURCHASE REQUEST NUMBER: W62G2W524002U1
0012 1 Each Contractor Manpower Report
FFP
Contractor Manpower Report in accordance with FAR 52.237-4000
NSN: AASSVC524002U5
STATEMENT OF WORK
11/4/2015
STATEMENT OF WORK
Repair Roll up Doors
1.0 PART I – GENERAL:
1.1 GENERAL: The contractor shall provide all labor, materials, equipment and supervision necessary to implement Scope of Work Items listed below at SIERRA ARMY DEPOT, Herlong, CA. 96113
1.2 Minimum Requirements: All work shall be done within all manufacture’s specifications and in accordance with all Federal, State and local regulations. Work shall be done in a professional workman like manner and to industrial standards. It is highly suggested a PRE- BID SITE VISIT take place to afford the opportunity to get familiarized with all the different aspects of this project. All door openings and Gear Heads are estimated and need to be verified for proper door and motor sizes. See Project Overview by Facility Number for door locations.
1.3 Scope of Work Items:
Repair Roll-up Doors: Repair existing roll-up doors at buildings at various locations.
Project overview by facility number:
Project # 14-03939 Bldg 305
1.3.1 Provide necessary repairs to a manually operated roll up door located at the
Northwest end of building. Door size is 12’6”W X 14’ H
1.3.2 Highly suggested a pre-site visit to evaluate the door condition;
1.3.3 Suspected door problems are; barrel may need replacing due to free falling of door, unable to adjust tension on the inner spring. Check alignment of slats, check end locks, and adjust spring tension to balance door, check guides and mounting angles for alignment. Note: This is a Bonanza roll-up door
1.3.4 Lube and check door for proper operation
1.3.5 Any sliding door components or damaged/replaced roll up door components shall be disposed of off depot
Project # 15-04108 Bldg 318
1.3.6 Replace (1) door motor at South end of building. Current motor is a Lift-
Master gear-head.
1.3.7 Highly suggested a pre-site visit to evaluate the doors’ current specifications, and inspect as other problems may exist.
1.3.8 Replace the bottom 6 slats, re-aligned slats. Slate size is 2 ¾”.
1.3.9 Perform a complete door inspection, check barrel and tension spring operation, Check alignment of other slats, and check end locks.
1.3.10 Lube and check door for proper operation
1.3.11 Any sliding door components or damaged/replaced roll up door components shall be disposed of off depot.
1.3.12 Motor specifications: Vendor to determine size of gear-head by using manufacturers’ recommended horse power for the size of door and available power source at the facility, Continuous-duty high-starting torque motor with instant reverse and overload protection, Floor Level Chain Disconnect for emergency operations
Project # 15-04109 Bldg 362
1.3.13 Provide necessary repairs to a manually operated roll up door located at the Southwest end of building, Door # 22. Door size is 12’6”W X 12’ H. Door manufacturer is Overhead Door
1.3.14 Highly suggested a pre-site visit to evaluate the door condition;
1.3.15 Suspected door problems are; barrel and torsion spring needs adjustment and/or replacement due to free falling of door, Check alignment of other slats, check end, check guides and mounting angles for alignment.
1.3.16 Any sliding door components or damaged/replaced roll up door components
1.3.17 Lube and check door for proper operation
Project # 15-04111 Bldg 206
1.3.18 Replace (1) Manual roll-up door with motorized door and curtain at South end of building.
1.3.19 Install electrical circuit in panel which is about 30 feet from door location.
208v, 3phase coming from sub panel L1.
1.3.20 Highly suggested a pre-site visit to evaluate the doors’ current specifications and inspect as other problems may exist.
1.3.21 Any sliding door components or damaged/replaced roll up door components shall be disposed of off depot
1.3.22 Lube and check door for proper operation
1.3.23 Door specification: The door shall be roll formed interlocking slats made of 22 gauge galvanized steel and gray in color. Curtain will be provided with stamped steel end locks on alternate slats to maintain slat alignment. Door is required to meet a minimum wind load of 30psf. Counterbalance assembly shall contain a counter-balance torsion spring housed in a steel pipe and adjustable by means of an external tension wheel. Guides assemblies shall be made of structural steel angle able to support the entire weight of the door and have a weather stripping on exterior side. Brackets: minimum 3/16” steel plate that bolts to the guide assembly and supports the barrel, counterbalance shaft, and hood. Hood shall be galvanized steel and gray in color. Door shall be equipped with a 2” X 2” X 1/8” back to back structural steel angles with a weather seal bottom bar. All galvanized, exposed, ferrous surfaces will be receive one coat of rust inhibitive primer and shall be painted gray in color Motor specifications: Vendor to determine size of gear-head by using manufacturers’ recommended horse power for the size of door and available power source at the facility, Continuous-duty high-starting torque motor with instant reverse and overload protection, Floor Level Chain Disconnect for emergency operations.
Project # 15-04112 Bldg 235
1.3.24 Provide necessary repairs to motorized roll-up door located at the South end of building.
1.3.25 Highly suggested a pre-site visit to evaluate the door condition;
Suspected door problems are; total replacement of curtain, bottom bars, and safety stops. Check guides and mounting angles for alignment.
1.3.26 Lube and check door for proper operation
1.3.27 Any sliding door components or damaged/replaced roll up door components shall be disposed of off depot
1.3.28 Door specification: The door shall be roll formed interlocking slats made of
22 gauge galvanized steel and gray in color. Curtain will be provided with stamped steel end locks on alternate slats to maintain slat alignment. Door is required to meet a minimum wind load of 30psf. Counterbalance assembly shall contain a counter-balance torsion spring housed in a steel pipe and adjustable by means of an external tension wheel. Guides assemblies shall be made of structural steel angle able to support the entire weight of the door and have a weather stripping on exterior side. Brackets: minimum 3/16” steel plate that bolts to the guide assembly and supports the barrel, counterbalance shaft, and hood. Hood shall be galvanized steel and gray in color. Door shall be equipped with a 2” X 2” X 1/8” back to back structural steel angles with a weather seal bottom bar. All galvanized, exposed, ferrous surfaces will be receive one coat of rust inhibitive primer and shall be painted gray in color.
Project # 15-04117 Bldg 210
1.3.29 Repair (1) inner North door curtain approximate size is 18’w X 14’6”h, curtain
(Cornell) is in need of repair and has been locked in the up position and is difficult to roll down.
1.3.30 Highly suggested a pre-site visit to evaluate the door condition;
1.3.31 Suspected door problems are; total replacement of curtain and bottom bars.
Check guides and mounting angles for alignment. Check motor to insure proper operation, may need replacement (LiftMaster).
1.3.32 Lube and check door for proper operation
1.3.33 If curtain needs replacement please use specification below
1.3.34 Any sliding door components or damaged/replaced roll up door components shall be disposed of off depot
1.3.35 Door specification: The door shall be roll formed interlocking slats made of
22 gauge galvanized steel and gray in color. Curtain will be provided with stamped steel end locks on alternate slats to maintain slat alignment. Door is required to meet a minimum wind load of 30psf. Counterbalance assembly shall contain a counter-balance torsion spring housed in a steel pipe and adjustable by means of an external tension wheel. Guides assemblies shall be made of structural steel angle able to support the entire weight of the door and have a weather stripping on exterior side. Brackets: minimum 3/16” steel plate that bolts to the guide assembly and supports the barrel, counterbalance shaft, and hood. Hood shall be galvanized steel and gray in color. Door shall be equipped with a 2” X 2” X 1/8” back to back structural steel angles with a weather seal bottom bar. All galvanized, exposed, ferrous surfaces will be receive one coat of rust inhibitive primer and shall be painted gray in color
Project # 15-04115 Bldg P-2
1.3.36 Replace monitored telescopic Edge Sensor on eight (8) roll-up doors. See product information below.
1.3.37 Product Information: Reference or equal to a Millers’ Monitored Light Curtain
(MLC-K36)
Light Curtain Kit has a 3’ foot coverage Equipped with emitters and Receivers that mount to the door brackets Equipped with Red LED light to reflect object detected Equipped with Green LED light to reflect power OK Supply Voltage 12 thru 24 VAC/DC Housing Material; Black PVC over Aluminum
1.3.38 Lube and check door for proper operation
1.3.39 Any sliding door components or damaged/replaced roll up door components
Project # 15-04116 Bldg 543
1.3.40 Replace (4) Four door motors that are inoperable
1.3.41 These motor are the old pneumatic types motors and are mounted on the outside of the building in which birds have nested in. If electrical runs are required estimate 50’ per door.
1.3.42 Any sliding door components or damaged/replaced roll up door components shall be disposed of off depot
1.3.43 Motor specifications: Vendor to determine size of gear-head by using manufacturers’ recommended horse power for the size of door and available power source at the facility, Continuous-duty high-starting torque motor with instant reverse and overload protection, Floor Level Chain Disconnect for emergency operations.
1.3.44 Door sizes are (2) two at 10’ X 10’6” and (2) two at 13’ X 21’6”
1.3.45 Check alignment of other slats, check end locks and replace as needed
(note: end locks are from several different manufacturers), check guides and mounting angles for alignment.
1.3.46 Lube and check door for proper operation
Project # 15-04128 Bldg 79
1.3.47 Replace (2) sliding doors with (1) motorized roll-up door
1.3.48 Approximate door opening is 16’ W X 13’ H on wood framed construction.
From panel to door opening is approximately 100’. 208v, 3phase, from panel.
Require (3)- two button remotes.
1.3.49 Any sliding door components or damaged/replaced roll up door components shall be disposed of off depot
1.3.50 Motor specifications: Vendor to determine size of gear-head by using manufacturers’ recommended horse power for the size of door and available power source at the facility, Continuous-duty high-starting torque motor with instant reverse and overload protection, Floor Level Chain Disconnect for emergency operations.
1.3.51 Door specification: The door shall be roll formed interlocking slats made of 22 gauge galvanized steel and gray in color. Curtain will be provided with stamped steel end locks on alternate slats to maintain slat alignment. Door is required to meet a minimum wind load of 30psf. Counterbalance assembly shall contain a counter-balance torsion spring housed in a steel pipe and adjustable by means of an external tension wheel. Guides assemblies shall be made of structural steel angle able to support the entire weight of the door and have a weather stripping on exterior side. Brackets: minimum 3/16” steel plate that bolts to the guide assembly and supports the barrel, counterbalance shaft, and hood. Hood shall be galvanized steel and gray in color. Door shall be equipped with a 2” X 2” X 1/8” back to back structural steel angles with a weather seal bottom bar. All galvanized, exposed, ferrous surfaces will be receive one coat of rust inhibitive primer and shall be painted
1.3.52 Lube and check door for proper operation
Project # 15-04132 Bldg 310
1.3.53 Replace (1) sliding door with manual roll-up door. Mount door on the inside of building
1.3.54 Approximate door opening is 12’6 W X 12’ H
1.3.55 Any sliding door components or damaged/replaced roll up door components
1.3.56 Door specification: The door shall be roll formed interlocking slats made of 22 gauge galvanized steel and gray in color. Curtain will be provided with stamped steel end locks on alternate slats to maintain slat alignment. Door is required to meet a minimum wind load of 30psf. Counterbalance assembly shall contain a counter-balance torsion spring housed in a steel pipe and adjustable by means of an external tension wheel. Guides assemblies shall be made of structural steel angle able to support the entire weight of the door and have a weather stripping on exterior side. Brackets: minimum 3/16” steel plate that bolts to the guide assembly and supports the barrel, counterbalance shaft, and hood. Hood shall be galvanized steel and gray in color. Door shall be equipped with a 2” X 2” X 1/8” back to back structural steel angles with a weather seal bottom bar. All galvanized, exposed, ferrous surfaces will be receive one coat of rust inhibitive primer and shall be painted
1.3.57 Lube and check door for proper operation
Project # Optional Door Repairs
1.3.58 Contractor shall provide the POC with a listing of repairs to damaged roll up doors as required.
1.3.59 All optional door repairs shall be reviewed by the POC prior to completion.
1.3.60 Note: the majority of the facilities on depot are wood framed construction.
1.3.61 Estimate a minimum (3) door replacements with a manual operation, door sizes 12’6”W X 12’H to replace sliding doors. Estimate a minimum of (2) door replacements with motorized operation door sizes 12’6”W X 12’H to replace sliding doors. Estimate (2) ½ horse gear head and (1) ¾ horse gear head to replace any motors. Estimate (2) 12’6”W X 12’H curtains to replace any damaged curtains. Estimate (2) barrel replacements on 12’6”W X 12’H doors.
Damaged/replaced roll up door components shall be disposed of off depot
1.3.62 Motor specifications: Vendor to determine size of gear-head by using manufacturers’ recommended horse power for the size of door and available power source at the facility, Continuous-duty high-starting torque motor with instant reverse and overload protection, Floor Level Chain Disconnect for emergency operations.
1.3.63 Door specification: The door shall be roll formed interlocking slats made of 22 gauge galvanized steel and gray in color. Curtain will be provided with stamped steel end locks on alternate slats to maintain slat alignment. Door is required to meet a minimum wind load of 30psf. Counterbalance assembly shall contain a counter-balance torsion spring housed in a steel pipe and adjustable by means of an external tension wheel. Guides assemblies shall be made of structural steel angle able to support the entire weight of the door and have a weather stripping on exterior side. Brackets: minimum 3/16” steel plate that bolts to the guide assembly and supports the barrel, counterbalance shaft, and hood. Hood shall be galvanized steel and gray in color. Door shall be equipped with a 2” X 2” X 1/8” back to back structural steel angles with a weather seal bottom bar. All galvanized, exposed, ferrous surfaces will be receive one coat of rust inhibitive primer and shall be painted
1.3.64 Lube and check door for proper operation after repairs are made.
1.4 Applicable Documents:
1.4.1 SIAD Regulation 420-7 (Fire Prevention and Protection).
1.4.2 COE regulation 385-1-1 (Safety).
1.4.3 All local, state and federal laws, codes and regulations.
1.4.4 NEC Electrical Codes.
1.4.5 IBC Building Codes.
1.4.6 UFC 3-600-01 Code.
1.4.7 NFPA fire Codes.
1.5 Material Approval: All materials shall be approved by the Technical POC prior to installation.
1.6 Submittals required: (2 weeks prior to construction): Designs, drawings, special materials, material colors, material safety data sheets (MSDS) and certifications.
1.6.1 Timeline Plan: Complete construction time line plan. The plan shall be updated weekly and a copy presented to the POC.
1.6.2 Operations and Maintenance Manual: Three (3) sets of manufacturer operation and maintenance manual describing capabilities, maintenance of the proposed improvements, if applicable, to be submitted with close out documents.
1.7 Pre-Commencement Meeting: Prior to the commencement of work, a meeting will be held with the contractor and the government representatives to discuss matters of mutual interest concerning the contract. General conditions, work schedules and phasing, security, safety, depot siren, operations during lightning/thunderstorm, character of work, operations & storage areas, housekeeping and clean-up, days of work, equipment, fire prevention, smoking areas, accidents, local rules and regulations, delays, quality assurance, inspections, digging permits, hazardous waste, debris disposal and other matters pertinent to work accomplishments will be discussed at this time. At this time the contractor shall submit their Safety and Quality assurance plans, forecasted gannt chart time line plan and other submittals.
1.8 Drawings: SIAD drawings may be available upon request for reference to the awarded contractor. If stated in 1.3, a copy of the as built drawing shall be on site and updated on a regular bases to be reviewed by the POC & COR. Upon the completion of the project a clean new set shall be turned over to Sierra for their retention.
1.9 Point of Contact (POC): The Technical Point of Contact (POC) for this action will be Mr. Jerry Rose 530-827-4347. The Administrative COR shall be responsible for verifying that services have been rendered.
1.10 Work Coordination: All work shall be coordinated with the Technical POC.
1.11 Work Commencement: Contractor shall commence within the first 10 days, after receiving their Notice to Proceed (NTP) and shall complete the work within 120 days unless otherwise stated per the Contract. This may change for the convenience of the government and after notification to the contractor.
1.12 Smoking Areas: Smoking will be permitted only at locations designated by the Technical POC.
1.13 Safety:
1.13.1 Regulations: All installation safety regulations shall be followed.
1.13.2 Signage: Appropriate signs designated by Fire, Safety & Security shall be provided by the contractor and placed as indicated in work areas. In most cases this is not needed expect in high risk and high hazard projects. It shall be decided and made clear at the pre-con meeting.
1.13.3 Work Area Closures: The work areas shall be closed off with barricades, ribbon, signage, etc. to unauthorized personnel not in direct control of the contractor.
1.13.4 Accidents: All accidents shall be reported to the Safety Office through the Technical POC. This is to be accomplished within the same shift, preferably as soon after the accident as is practical.
An occupational Safety and Health Administration (OSHA) Form 101 shall be submitted to the Safety Office within three working days after an accident. In the event of serious injury or damage, work will stop and everything will be left in place exactly as it was at the time of the accident, excepting when the possibility of more damage or injury exists.
1.14 Housekeeping and Cleanup: After completion of each phase of the work, the contractor shall at the end of each work day leave all work areas in a neat, clean and workmanlike condition satisfactory to the POC. After completion of the entire job, the contractor shall remove from the premises all tools, equipment, and materials.
1.15 Unscheduled Interruptions: Work operations are subject to unscheduled interruptions and contractor personnel may be required to immediately leave the designated work area or be denied access due to security operations. Mission requirements may necessitate suspension or cancellation of custodial operations for that period. All incomplete work shall be rescheduled for completion at a later time/date mutually agreed upon by the contracting officer (KO) and contractor. Modification to the contact may or may not be necessary.
1.16 Working Area Verification: The contractor shall be responsible for the coordination and proper relationship of this work to the building premises, and thoroughly familiarize himself with all details of the Scope of Work and working conditions, to verify all dimensions in the field, and advise the POC/COR of any discrepancies before performing any work.
1.17 Quality Assurance: While performing this work the contractor shall be subject to on site inspections by the Technical POC and QA personnel. The contractor shall provide a manager to conduct and oversee daily QA and safety issues. If the work is found to be in violation of specification requirements, the Contracting Officer (KO) Representative (COR) will issue a QA deficiency report to the contractor, who will acknowledge and respond to the deficiencies within 24 hours. The contraction officer (KO) may issue a stop work order until the violation is resolved.
Standby time and expenses required resolving the violation shall be at the contractor expense.
1.17.1 There shall be announced and unannounced spot checks.
1.17.2 QA visual observations may be performed by the COR, POC & QA personnel.
1.17.3 Evaluation of customer complaints and/or comments, shall be reviewed jointly by the
COR and Technical POC.
1.17.4 Coordination of communication with contractor and others shall be done through the
Technical POC.
1.18 Debris:
1.18.1 Non-Hazardous Waste: All scrap, solid waste and non-hazardous materials shall be disposed off the depot and in accordance with applicable laws and regulations at Contractor's expense, unless otherwise specified in the contract.
1.18.2 Hazardous Waste: Hazardous waste generated by Contractors on Sierra Army Depot shall be disposed of in accordance with Depot Policy, contact the Environmental Office, 530-827-4318, for proper disposal instructions. Government receptacles or containers shall not be used for disposal. Unless previously arranged for by POC as part of the Scope (see 1.3.). The contractor shall submit an abatement plan were and when applicable as part of the Scope (see 1.3.) to the POC.
1.19 Delays: The government is not liable for any delay caused by, security inspections at any entrance gates or any security measures imposed by the Installation Commander and/or higher authority.
1.20 Damages: Contractor shall be responsible for repairing damage caused by construction and or repair activities. Any damages incurred as a result of contractor’s actions shall be repaired or replaced at no additional cost to the government.
1.21 Materials and Equipment Stored on Depot: The government shall not assume any responsibility for the security or protection of any materials or equipment stored on the depot by the contractor.
1.22 Dimensions: All dimension supplied to contractor in any form shall be verified by the contractor.
1.23 Contract Additions and Deletions: The Government reserves the right to add or delete items from the contract, subject to their change in use. Resulting contract price adjustments will be negotiated based upon costs in place at that time and per contract performance period. The Contracting Officer (KO) is the only person that can make any changes (scope, costs or time) to the contract. Any change made will be affective only after both the contractor and the Government sign the modification revising the contract.
2 PART II - PRODUCTS:
2.1 Contractor Supplied Materials: The contractor shall supply normal industry standard domestic approved materials.
2.2 Minimum Requirements: All items shall be installed per code (see 1.4), as per plans, specification and manufactures recommendations. All products shall be in conformance with the “Buy in America Act”. Workmanship and installation standards shall be that of a high quality commercial/industrial standard.
2.3 Government Supplied Materials: The Gov. shall supply any items described as “Gov.
supplied” in the Scope of Work in a timely manner to coincide with the contractors time line.
3 PART III - EXECUTION:
3.1 Performance Notification: The contractor or their manager shall provide the POC by 0630am of each working a Daily project Report, to verify the project status, time delays, percent of overall completion, task completion status, adjusted completion date and any other issues directly related to the project completion. This information will be compared to the submitted contractor’s time line. Upon completion gannt chart shall be provided showing the original performance time line verses the actual time line running concurrently under one another.
3.2 Demolition: The contractor shall identify and contact Technical POC prior to any demolition necessary. Technical POC will approve any demolition required.
3.3 Installation: The work will be done in a timely workman like manner with a professional looking appearance and function.
3.4 Completion: The contractor shall contact the Technical POC to inspect installation of all components of this project.
3.5 Warranties: The contractor shall provide a minimum of a one year warranty on all work unless otherwise stated in the Scope of Work Items. Any manufacturer warranties shall be passed on to Sierra Amy Depot.
QASP
PERFORMANCE REQUIREMENTS SUMMARY
Performance Objective
Performance Indicator Performance Threshold
Method of Surveillance
Installation
Equipment is installed IAW the manufacturer’s specifications
100% accuracy and completeness with no more than one correction
100% inspection of deliverables
Testing
Operation test upon completion of installation
100% accuracy
100% inspection of
Inspection Random inspection of all work performed.
100% accuracy 100% inspection of
WAGE DETERMINATION
WD 05-2333 (Rev.-16) was first posted on www.wdol.gov on 07/14/2015
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT
OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS
ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR
DIVISION
| WASHINGTON D.C.
20210 | Wage Determination No.:
2005-2333 Daniel W. Simms Division of | Revision No.:
Director Wage Determinations| Date Of Revision:
07/08/2015 Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Service Contract Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
States: California, Nevada
Area: California Counties of Lassen, Mono Nevada - All Counties except : Clark, Esmeralda, Lincoln, Nye **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE
FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.00 01012 - Accounting Clerk II 16.46 01013 - Accounting Clerk III 18.34 01020 - Administrative Assistant 23.69 01040 - Court Reporter
19.55 01051 - Data Entry Operator I 11.86 01052 - Data Entry Operator II 13.86 01060 - Dispatcher, Motor Vehicle 21.62 01070 - Document Preparation Clerk 15.67 01090 - Duplicating Machine Operator 15.67 01111 - General Clerk I 14.06 01112 - General Clerk II 15.35 01113 - General Clerk III 17.51 01120 - Housing Referral Assistant 21.80 01141 - Messenger Courier 11.66 01191 - Order Clerk I 12.52 01192 - Order Clerk II 14.81 01261 - Personnel Assistant (Employment) I 15.66 01262 - Personnel Assistant (Employment) II 17.52 01263 - Personnel Assistant (Employment) III 19.53 01270 - Production Control Clerk 18.98 01280 - Receptionist 14.53 01290 - Rental Clerk 14.77 01300 - Scheduler, Maintenance 17.48 01311 - Secretary I 17.48 01312 - Secretary II 19.55 01313 - Secretary III 21.80 01320 - Service Order Dispatcher
17.78 01410 - Supply Technician 23.69 01420 - Survey Worker 17.81 01531 - Travel Clerk I 13.06 01532 - Travel Clerk II 13.87 01533 - Travel Clerk III 14.50 01611 - Word Processor I 14.86 01612 - Word Processor II 16.69 01613 - Word Processor III 18.66 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 23.47 05010 - Automotive Electrician 21.13 05040 - Automotive Glass Installer 19.65 05070 - Automotive Worker 19.65 05110 - Mobile Equipment Servicer 17.34 05130 - Motor Equipment Metal Mechanic 21.13 05160 - Motor Equipment Metal Worker 19.65 05190 - Motor Vehicle Mechanic 21.73 05220 - Motor Vehicle Mechanic Helper 17.34 05250 - Motor Vehicle Upholstery Worker 19.65 05280 - Motor Vehicle Wrecker 19.65 05310 - Painter, Automotive 20.49 05340 - Radiator Repair Specialist 19.65 05370 - Tire Repairer 14.76
05400 - Transmission Repair Specialist 21.13 07000 - Food Preparation And Service Occupations 07010 - Baker 13.19 07041 - Cook I 11.79 07042 - Cook II 13.25 07070 - Dishwasher 9.30 07130 - Food Service Worker 9.66 07210 - Meat Cutter 19.04 07260 - Waiter/Waitress 8.11 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 18.99 09040 - Furniture Handler 14.83 09080 - Furniture Refinisher 18.99 09090 - Furniture Refinisher Helper 15.28 09110 - Furniture Repairer, Minor 17.11 09130 - Upholsterer 17.31 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 10.89 11060 - Elevator Operator 10.23 11090 - Gardener 15.14 11122 - Housekeeping Aide 10.23 11150 - Janitor 10.23 11210 - Laborer, Grounds Maintenance 12.80 11240 - Maid or Houseman 10.03 11260 - Pruner
11.64 11270 - Tractor Operator 14.51 11330 - Trail Maintenance Worker 12.60 11360 - Window Cleaner 11.07 12000 - Health Occupations 12010 - Ambulance Driver 18.95 12011 - Breath Alcohol Technician 16.75 12012 - Certified Occupational Therapist Assistant 27.17 12015 - Certified Physical Therapist Assistant 23.73 12020 - Dental Assistant 18.09 12025 - Dental Hygienist 38.07 12030 - EKG Technician 30.03 12035 - Electroneurodiagnostic Technologist 30.03 12040 - Emergency Medical Technician 18.95 12071 - Licensed Practical Nurse I 18.01 12072 - Licensed Practical Nurse II 20.15 12073 - Licensed Practical Nurse III 22.47 12100 - Medical Assistant 16.51 12130 - Medical Laboratory Technician 16.92 12160 - Medical Record Clerk 15.91 12190 - Medical Record Technician 16.31 12195 - Medical Transcriptionist 20.17 12210 - Nuclear Medicine Technologist 38.38 12221 - Nursing Assistant I 10.39
12222 - Nursing Assistant II 11.68 12223 - Nursing Assistant III 12.74 12224 - Nursing Assistant IV 14.31 12235 - Optical Dispenser 18.41 12236 - Optical Technician 13.13 12250 - Pharmacy Technician 15.46 12280 - Phlebotomist 14.31 12305 - Radiologic Technologist 29.43 12311 - Registered Nurse I 27.63 12312 - Registered Nurse II 35.14 12313 - Registered Nurse II, Specialist 35.14 12314 - Registered Nurse III 40.94 12315 - Registered Nurse III, Anesthetist 40.94 12316 - Registered Nurse IV 49.04 12317 - Scheduler (Drug and Alcohol Testing) 24.88 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 21.37 13012 - Exhibits Specialist II 25.68 13013 - Exhibits Specialist III 32.35 13041 - Illustrator I 21.37 13042 - Illustrator II 25.68 13043 - Illustrator III 32.35 13047 - Librarian 29.32 13050 - Library Aide/Clerk
17.58 13054 - Library Information Technology Systems 26.48 Administrator 13058 - Library Technician 18.86 13061 - Media Specialist I 18.53 13062 - Media Specialist II 20.73 13063 - Media Specialist III 23.84 13071 - Photographer I 15.87 13072 - Photographer II 17.74 13073 - Photographer III 21.98 13074 - Photographer IV 26.88 13075 - Photographer V 32.53 13110 - Video Teleconference Technician 20.97 14000 - Information Technology Occupations 14041 - Computer Operator I 15.70 14042 - Computer Operator II 17.56 14043 - Computer Operator III 19.59 14044 - Computer Operator IV 21.76 14045 - Computer Operator V 24.09 14071 - Computer Programmer I (see 1) 22.61 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 15.70 14160 - Personal Computer Support Technician
21.76 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 29.62 15020 - Aircrew Training Devices Instructor (Rated) 39.42 15030 - Air Crew Training Devices Instructor (Pilot) 40.72 15050 - Computer Based Training Specialist / Instructor 29.62 15060 - Educational Technologist 34.68 15070 - Flight Instructor (Pilot) 40.72 15080 - Graphic Artist 22.57 15090 - Technical Instructor 17.84 15095 - Technical Instructor/Course Developer 20.61 15110 - Test Proctor 16.24 15120 - Tutor 16.24 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 9.62 16030 - Counter Attendant 9.62 16040 - Dry Cleaner 12.34 16070 - Finisher, Flatwork, Machine 9.62 16090 - Presser, Hand 9.62 16110 - Presser, Machine, Drycleaning 9.62 16130 - Presser, Machine, Shirts 9.62 16160 - Presser, Machine, Wearing Apparel, Laundry 9.62 16190 - Sewing Machine Operator 13.24 16220 - Tailor 14.02 16250 - Washer, Machine
10.55 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 21.40 19040 - Tool And Die Maker 25.47 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 18.40 21030 - Material Coordinator 17.92 21040 - Material Expediter 19.69 21050 - Material Handling Laborer 14.34 21071 - Order Filler 14.13 21080 - Production Line Worker (Food Processing) 18.40 21110 - Shipping Packer 16.09 21130 - Shipping/Receiving Clerk 16.09 21140 - Store Worker I 13.51 21150 - Stock Clerk 17.12 21210 - Tools And Parts Attendant 18.40 21410 - Warehouse Specialist 18.40 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 26.47 23021 - Aircraft Mechanic I 25.39 23022 - Aircraft Mechanic II 26.47 23023 - Aircraft Mechanic III 27.47 23040 - Aircraft Mechanic Helper 19.61 23050 - Aircraft, Painter 25.84 23060 - Aircraft Servicer 21.97
23080 - Aircraft Worker 23.14 23110 - Appliance Mechanic 21.84 23120 - Bicycle Repairer 13.42 23125 - Cable Splicer 24.46 23130 - Carpenter, Maintenance 22.71 23140 - Carpet Layer 20.85 23160 - Electrician, Maintenance 25.61 23181 - Electronics Technician Maintenance I 20.33 23182 - Electronics Technician Maintenance II 23.14 23183 - Electronics Technician Maintenance III 28.00 23260 - Fabric Worker 19.56 23290 - Fire Alarm System Mechanic 22.68 23310 - Fire Extinguisher Repairer 18.41 23311 - Fuel Distribution System Mechanic 25.17 23312 - Fuel Distribution System Operator 21.51 23370 - General Maintenance Worker 18.24 23380 - Ground Support Equipment Mechanic 25.39 23381 - Ground Support Equipment Servicer 21.97 23382 - Ground Support Equipment Worker 23.14 23391 - Gunsmith I 18.41 23392 - Gunsmith II 20.69 23393 - Gunsmith III 23.01 23410 - Heating, Ventilation And Air-Conditioning 23.45
Mechanic 23411 - Heating, Ventilation And Air Contditioning 24.63 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 23.00 23440 - Heavy Equipment Operator 24.61 23460 - Instrument Mechanic 23.90 23465 - Laboratory/Shelter Mechanic 21.84 23470 - Laborer 11.62 23510 - Locksmith 20.89 23530 - Machinery Maintenance Mechanic 22.80 23550 - Machinist, Maintenance 20.64 23580 - Maintenance Trades Helper 16.61 23591 - Metrology Technician I 23.90 23592 - Metrology Technician II 24.97 23593 - Metrology Technician III 26.19 23640 - Millwright 23.01 23710 - Office Appliance Repairer 20.16 23760 - Painter, Maintenance 18.20 23790 - Pipefitter, Maintenance 27.67 23810 - Plumber, Maintenance 26.88 23820 - Pneudraulic Systems Mechanic 23.01 23850 - Rigger 23.01 23870 - Scale Mechanic 20.69 23890 - Sheet-Metal Worker, Maintenance 23.24
23910 - Small Engine Mechanic 16.80 23931 - Telecommunications Mechanic I 21.44 23932 - Telecommunications Mechanic II 22.62 23950 - Telephone Lineman 22.80 23960 - Welder, Combination, Maintenance 21.89 23965 - Well Driller 25.17 23970 - Woodcraft Worker 23.01 23980 - Woodworker 18.21 24000 - Personal Needs Occupations 24570 - Child Care Attendant 10.95 24580 - Child Care Center Clerk 14.96 24610 - Chore Aide 10.24 24620 - Family Readiness And Support Services 15.19 Coordinator 24630 - Homemaker 16.68 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 22.88 25040 - Sewage Plant Operator 26.90 25070 - Stationary Engineer 22.88 25190 - Ventilation Equipment Tender 17.28 25210 - Water Treatment Plant Operator 26.90 27000 - Protective Service Occupations 27004 - Alarm Monitor 24.00 27007 - Baggage Inspector 11.95 27008 - Corrections Officer 25.60
27010 - Court Security Officer 25.60 27030 - Detection Dog Handler 18.18 27040 - Detention Officer 25.60 27070 - Firefighter 22.91 27101 - Guard I 11.95 27102 - Guard II 18.18 27131 - Police Officer I 30.96 27132 - Police Officer II 34.42 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 11.60 28042 - Carnival Equipment Repairer 12.13 28043 - Carnival Equpment Worker 9.05 28210 - Gate Attendant/Gate Tender 13.43 28310 - Lifeguard 11.84 28350 - Park Attendant (Aide) 15.03 28510 - Recreation Aide/Health Facility Attendant 11.10 28515 - Recreation Specialist 18.62 28630 - Sports Official 12.42 28690 - Swimming Pool Operator 17.68 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 21.53 29020 - Hatch Tender 21.53 29030 - Line Handler 21.53 29041 - Stevedore I 20.81
29042 - Stevedore II 23.24 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 35.77 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 24.66 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 27.16 30021 - Archeological Technician I 18.02 30022 - Archeological Technician II 20.17 30023 - Archeological Technician III 24.55 30030 - Cartographic Technician 24.55 30040 - Civil Engineering Technician 22.23 30061 - Drafter/CAD Operator I 18.02 30062 - Drafter/CAD Operator II 20.17 30063 - Drafter/CAD Operator III 22.50 30064 - Drafter/CAD Operator IV 27.19 30081 - Engineering Technician I 16.00 30082 - Engineering Technician II 17.96 30083 - Engineering Technician III 20.10 30084 - Engineering Technician IV 24.88 30085 - Engineering Technician V 30.45 30086 - Engineering Technician VI 36.85 30090 - Environmental Technician 27.01 30210 - Laboratory Technician 17.03 30240 - Mathematical Technician 26.12 30361 - Paralegal/Legal Assistant I
20.22 30362 - Paralegal/Legal Assistant II 25.06 30363 - Paralegal/Legal Assistant III 30.36 30364 - Paralegal/Legal Assistant IV 37.09 30390 - Photo-Optics Technician 24.55 30461 - Technical Writer I 25.32 30462 - Technical Writer II 30.65 30463 - Technical Writer III 32.80 30491 - Unexploded Ordnance (UXO) Technician I 22.74 30492 - Unexploded Ordnance (UXO) Technician II 27.51 30493 - Unexploded Ordnance (UXO) Technician III 32.97 30494 - Unexploded (UXO) Safety Escort 22.74 30495 - Unexploded (UXO) Sweep Personnel 22.74 30620 - Weather Observer, Combined Upper Air Or (see 3) 22.50 Surface Programs 30621 - Weather Observer, Senior (see 3) 24.55 31000 - Transportation/Mobile Equipment Operation Occupations 31020 - Bus Aide 13.07 31030 - Bus Driver 17.04 31043 - Driver Courier 15.81 31260 - Parking and Lot Attendant 9.63 31290 - Shuttle Bus Driver 16.04 31310 - Taxi Driver 11.80 31361 - Truckdriver, Light 16.04 31362 - Truckdriver, Medium
17.68 31363 - Truckdriver, Heavy 22.69 31364 - Truckdriver, Tractor-Trailer 22.69 99000 - Miscellaneous Occupations 99030 - Cashier 10.48 99050 - Desk Clerk 10.44 99095 - Embalmer 22.74 99251 - Laboratory Animal Caretaker I 10.53 99252 - Laboratory Animal Caretaker II 11.22 99310 - Mortician 20.20 99410 - Pest Controller 16.43 99510 - Photofinishing Worker 12.53 99710 - Recycling Laborer 12.46 99711 - Recycling Specialist 14.37 99730 - Refuse Collector 14.50 99810 - Sales Clerk 14.32 99820 - School Crossing Guard 14.70 99830 - Survey Party Chief 29.98 99831 - Surveying Aide 20.22 99832 - Surveying Technician 21.98 99840 - Vending Machine Attendant 13.60 99841 - Vending Machine Repairer 16.29 99842 - Vending Machine Repairer Helper 13.60
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.27 per hour or $170.80 per week or $740.13 per month
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; 3 weeks after 5 years, and 4 weeks after 15 years.
Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg.
29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year, New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.)
(See 29 CFR 4174)
THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES
RECEIVE THE FOLLOWING:
1) COMPUTER EMPLOYEES: Under the SCA at section 8(b), this wage determination does not apply to any employee who individually qualifies as a bona fide executive, administrative, or professional employee as defined in 29 C.F.R.
Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals, (29 C.F.R. 541.
400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition, because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds $27.63 per hour conformances may be necessary for certain nonexempt employees. For example, if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate, then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.
Additionally, because job titles vary widely and change quickly in the computer industry, job titles are not determinative of the application of the computer professional exemption. Therefore, the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:
(1) The application of systems analysis techniques and procedures, including consulting with users, to determine hardware, software or system functional specifications;
(2) The design, development, documentation, analysis, creation, testing or modification of computer systems or programs, including prototypes, based on and related to user or system design specifications;
(3) The design, documentation, testing, creation or modification of computer programs related to machine operating systems; or
(4) A combination of the aforementioned duties, the performance of which requires the same level of skills. (29 C.F.R. 541.400).
2) APPLICABLE TO AIR TRAFFIC CONTROLLERS ONLY - NIGHT
DIFFERENTIAL: An employee is entitled to pay for all work performed between the hours of 6:00 P.M. and 6:00 A.M.
at the rate of basic pay plus a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .