Questions_and_Answers_Roll_Up_Doors.doc
DOC document 23 KB Posted
- Attached to
- Repair Roll Up Doors
- Solicitation number
- W912GY-16-T-0005
About this file
Questions and Answers Roll up Doors
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLIN_0007_P2_Door_Statement_of_Work_Update.doc | DOC document | |
| Solicitation_W912GY-16-T-0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Roll Up Doors
Optional Door Repairs
1.3.61: Statement of Work
a. There are 5 tasks listed for pricing. Are these priced together or separately?
(Separately within the line item)
b. Second option calls for replacing 2 doors with motorized version. How far do we plan to run power?
ANSWERS:
A. These are listed separately with a total for the line item.
B. 150’ would be the longest run for any of the warehouses.
File details come from the government source that posted it. Updated .