Questions_and_Answers_Set_6.doc

DOC document 23 KB Posted

Attached to
Task Lighting Federal contract opportunity
Solicitation number
W912GY16B0009
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Task Lighting, newest first.
File Type Posted
OF_1419.xls XLS spreadsheet
Questions_and_Answers_Set_5.doc DOC document
Questions_and_Answers_Set_3.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Bldg_358_Lighting_Layout_08-Sep-16.pdf PDF
Questions_and_Answers_Set_4.doc DOC document
QUESTIONS_AND_ANSWERS_SET_2.doc DOC document
IMG_9715.JPG JPG image
Questions_and_Answers_Set_1.doc DOC document
Existing_LED_lights_4.JPG JPG image
Existing_LED_lights.JPG JPG image
Existing_LED_lights_3.JPG JPG image
Drawing_-_Bldg.306_Lighting_Layout_28-Jul-16.pdf PDF
Existing_LED_lights_2.JPG JPG image
BLDG_307_Lighting_Layout_08Aug16.pdf PDF
Drawing_Ver_2.pdf PDF
W912GY-16-B-0009.pdf PDF
Drawing_-_Bldg_358_Lighting_Layout_28-Jul-16.pdf PDF
Existing_LED_lights_1.JPG JPG image
Drawing_-_Bldg._310_Lighting_Layout_28-Jul-16.pdf PDF
Existing_LED_lights_5.JPG JPG image
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Set 6 1.At the walk it was mentioned that between fixtures there was to be EMT conduit, same as currently installed at each building. The whip down to the fixture could be MC cable.

In the response to Set 5 it sounds like we can run to a box in EMT and then connect up to 4 fixtures together with MC cable, end to end.

I always understood the standard whip to be no longer than 6’ in length.

Please clarify if a fixture whip length and current installation method has changed.

ANSWER: In a group of 4 fixtures, on the same circuit, the Contractor may run EMT to the center of the group. Run MC down, from the EMT & box, to the 2nd fixture. From the 2nd fixture run MC back up, across to above the 1st fixture, then down to the 1st fixture.

Same process for fixtures 3 & 4. From the EMT & box, run MC down to 3rd fixture. From 3rd fixture run MC up, across to above the 4th fixture, then down to the 4th fixture.