Questions_and_Answers_Set_1.doc
DOC document 23 KB Posted
- Attached to
- Task Lighting Federal contract opportunity
- Solicitation number
- W912GY16B0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF_1419.xls | XLS spreadsheet | |
| Questions_and_Answers_Set_6.doc | DOC document | |
| Questions_and_Answers_Set_5.doc | DOC document | |
| Questions_and_Answers_Set_3.doc | DOC document | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| Bldg_358_Lighting_Layout_08-Sep-16.pdf | ||
| Questions_and_Answers_Set_4.doc | DOC document | |
| QUESTIONS_AND_ANSWERS_SET_2.doc | DOC document | |
| IMG_9715.JPG | JPG image | |
| Existing_LED_lights_4.JPG | JPG image | |
| Existing_LED_lights.JPG | JPG image | |
| Existing_LED_lights_3.JPG | JPG image | |
| Drawing_-_Bldg.306_Lighting_Layout_28-Jul-16.pdf | ||
| Drawing_-_Bldg_358_Lighting_Layout_28-Jul-16.pdf | ||
| Existing_LED_lights_1.JPG | JPG image | |
| Existing_LED_lights_2.JPG | JPG image | |
| BLDG_307_Lighting_Layout_08Aug16.pdf | ||
| Drawing_Ver_2.pdf | ||
| W912GY-16-B-0009.pdf | ||
| Drawing_-_Bldg._310_Lighting_Layout_28-Jul-16.pdf | ||
| Existing_LED_lights_5.JPG | JPG image |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Set 1
1. On the scope, it shows panel, device and general wiring for 308 and
307. The pricing breakdown shows all 5 buildings but the description only includes lighting for all 5. How is the power priced?
ANSWER: Install the lights and ice machine as stated in the Statement of Work.
2. 1.3.14 Ice Machine.
a. Where is the water connection for this machine?
b. Is one of the receptacles shown near the restrooms for the machine?
ANSWER: ) Install the stated machine as stated. The location outside the restrooms shown on the drawing. The single outlet shown will power the ice machine. Water is present at the location, 1/2" copper, solder joints.
3. Bldg. 308. Outlet shown next to new panel noted as 3 phase. Do you have the device configuration needed?
ANSWER: See attached photo.