SECTION 01 22 00

Water Supply System Improvements for Lachin IDP Communities Region of Aghajabadi, Azerbaijan

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

12/18

PART 1 GENERAL

SINGLE JOB PAYMENT ITEMS

-- End of Section Table of Contents --

PRICE AND PAYMENT PROCEDURES

12/18

PART 1 GENERAL

SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BID SCHEDULE and described below.

All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for design and for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included in the first base bid item.

1.1.1 Base Item 1: New Artesian-Fed Storage Tank And Associated Yard Piping And Fittings

1.1.1.1 Payment

Payment will be made for costs associated with the design and construction of a new artesian-fed storage tank to include, but in not limited to, mobilization, demobilization, site investigations, site improvements, demolition of the existing tank, associated new piping and fittings, distribution hub, valves, all applicable civil, geotechnical, structural, electrical and mechanical requirements, signage and final clean-up. This item excludes any requirements included in Option Item 1.

1.1.2 Base Bid Item 2: Piping & Fittings From The Well Site To The Finga IDP Service Distribution Endpoint

1.1.2.1 Payment

Payment will be made for costs associated with the design and construction of 2.50 km of new piping and fittings and a new water distribution endpoint terminal. This item includes all associated mobilization, demobilization, site investigations, site improvements, demolition, new piping and fittings, valves, all applicable civil, geotechnical, structural, electrical and mechanical requirements for this particular site.

1.1.3 Base Bid Item 3: Piping & Fittings From The Canal Crossing Of The Ardushlu IDP Water Line To The Nuraddin IDP Service Distribution Endpoint, Including Connection To The Ardushlu IDP Water Line

1.1.3.1 Payment

Payment will be made for costs associated with the design and construction of a new tee in Ardushlu water supply line immediately west of the existing canal crossing, 1.58 km of new piping and fittings and new water distribution endpoint terminal. This item includes all associated mobilization, demobilization, site investigations, site improvements, demolition, new piping and fittings, valves, all applicable civil, geotechnical, structural, electrical and mechanical requirements for this particular site. This item excludes any requirements included in Option Item 2.

1.1.4 Base Bid Item 4: Piping & Fittings From The Well Site To The Ardeshevi IDP Service Distribution Endpoint, Including The Major Canal Crossing Near The Well Site

1.1.4.1 Payment

Payment will be made for costs associated with the design and construction of 150 m of primary distribution pipe, 3.15 km of new piping and fittings and new water distribution endpoint terminal. This item includes all associated mobilization, demobilization, site investigations, site improvements, demolition, new piping and fittings, valves, all applicable civil, geotechnical, structural, electrical and mechanical requirements for this particular site.

1.1.5 Base Bid Item 5: Piping & Fittings From The Ardeshevi Water Line At The Canal Crossing To The Alkhasli IDP Service Distribution Endpoint

1.1.5.1 Payment

Payment will be made for costs associated with the design and construction of 2.64 km of new piping and fittings and a new water distribution endpoint terminal. This item includes all associated mobilization, demobilization, site investigations, site improvements, demolition, new piping and fittings, valves, all applicable civil,

1.1.6 Base Bid Item 6: Piping & Fittings From The Alkhasli Service Distribution Endpoint To The Sheylanli IDP Service Distribution Endpoint

1.1.6.1 Payment

Payment will be made for costs associated with the design and construction of 1.23 km of new piping and fittings and a new water distribution endpoint terminal. This item includes all associated mobilization, demobilization, site investigations, site improvements, demolition, new piping and fittings, valves, all applicable civil,

1.1.7 Option Item 1: Replacement Of An Existing Water Supply Booster Pump At The Well Site, Including Design And Installation Of A New Photovoltaic Array with Battery System (And Associated Concrete Pad) Array To Power The Pump

1.1.7.1 Payment

Payment will be made for all costs associated with the design and installation of a new photovoltaic array with battery system and associated concrete pad to power the pump for the recently constructed, pump-fed elevated water tank. This item excludes any requirements included in Base Item 1.

1.1.8 Option Item 2: Piping & Fittings From The Well Site, Parallel Along The Ardushlu IDP Water Line To The Canal Crossing, Connecting To The Nuraddin IDP Water Line Installed In Base Bid Item 3 Above. If Option 2 is awarded, an extra 90 days will be added to the period of performance of 365 days for a total of 455 days.

1.1.8.1 Payment

Payment will be made for costs associated with the design and construction of 0.94 km water distribution pipe extension from the tee location west of the existing canal crossing to the well site. This item excludes any requirements included in Base Item 3.

-- End of Section --

PART 1 GENERAL
1.1 SINGLE JOB PAYMENT ITEMS
1.1.1 Base Item 1: New Artesian-Fed Storage Tank And Associated Yard Piping And Fittings
1.1.1.1 Payment
1.1.2 Base Bid Item 2: Piping & Fittings From The Well Site To The Finga IDP Service Distribution Endpoint
1.1.2.1 Payment
1.1.3 Base Bid Item 3: Piping & Fittings From The Canal Crossing Of The Ardushlu IDP Water Line To The Nuraddin IDP Service Distribution Endpoint, Including Connection To The Ardushlu IDP Water Line
1.1.3.1 Payment
1.1.4 Base Bid Item 4: Piping & Fittings From The Well Site To The Ardeshevi IDP Service Distribution Endpoint, Including The Major Canal Crossing Near The Well Site
1.1.4.1 Payment
1.1.5 Base Bid Item 5: Piping & Fittings From The Ardeshevi Water Line At The Canal Crossing To The Alkhasli IDP Service Distribution Endpoint
1.1.5.1 Payment
1.1.6 Base Bid Item 6: Piping & Fittings From The Alkhasli Service Distribution Endpoint To The Sheylanli IDP Service Distribution Endpoint
1.1.6.1 Payment
1.1.7 Option Item 1: Replacement Of An Existing Water Supply Booster Pump At The Well Site, Including Design And Installation Of A New Photovoltaic Array with Battery System (And Associated Concrete Pad) Array To Power The Pump
1.1.7.1 Payment
1.1.8 Option Item 2: Piping & Fittings From The Well Site, Parallel Along The Ardushlu IDP Water Line To The Canal Crossing, Connecting To The Nuraddin IDP Water Line Installed In Base Bid Item 3 Above. If Option 2 is awarded, an extra 90 days will be...
1.1.8.1 Payment