Equipment Price List
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | | |
| Equipment Price List | | | | |
| ITEM | DESCRIPTION | EST | | |
| QTY | U/I | Unit Price | Total Price | Catalog/Page Number | |
| 1 | Park Bench, with back, 6-foot | 20 | EA | € - 0 |
| 2 | Park Bench, without back, 6-foot | 10 | ES | € - 0 |
| 3 | Square Sunshade Structure, 10-foot x 10-foot | 5 | LS | € - 0 |
| 4 | Square Sunshade Structure, 15-foot x 15-foot | 5 | LS | € - 0 |
| 5 | Square Sunshade Structure, 20-foot x 20-foot | 10 | LS | € - 0 |
| 6 | Pre-school age (2 to 5 years old) Climb Structure | 15 | LS | € - 0 |
| 7 | School Age (5 to 12 years old) Climb Structure | 20 | LS | € - 0 |
| 8 | Swing Set, 7-foot (H) x 10-foot (W), two seats for pre-school age children | 15 | LS | € - 0 |
| 9 | Swing Set, 8-foot (H) x 10-foot (W), two seats for school age children | 15 | LS | € - 0 |
| 10 | Playhouse, 5-foot x 5-foot | 15 | EA | € - 0 |
| 11 | Picnic Table, 6-foot | 10 | EA | € - 0 |
| 12 | Picnic Table, 4-foot | 10 | EA | € - 0 |
| | Price for Equipment | | | € - 0 |
| | Discount | | | 0.00% |
0032 Equipment Total Price € 0.00
BASE YR 1
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | | | |
| BASE YEAR 1 | | | | | | |
| LINE | | | | | | |
| ITEM | | DESCRIPTION | EST | | | | |
| QTY | U/I | Unit Price | Total Price | | | | |
| 0001 | | Maintenance, Inspection, and Safety Services | | | | |
| IAW Section C, Paragraph C.1.6.1.8 | | | | | | |
| 0001 | AA | Labor -Project Manager | 200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Laborer | 1200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Tractor / Lift Operator | 800 | HR | € 0.00 | € 0.00 |
| 0001 | AB | Fall Material HIC test and report | 50 | EA | € 0.00 | € 0.00 |
| 0001 | AC | Preventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction). | 650 | EA | € 0.00 | € 0.00 |
0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00
TOTAL COST (0001AA-AD) € 0.00
| 0002 | | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0002 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0002 | | | | | | |
AGM: AGM:
What is the difference between AB and AC?
| AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € 0.00 | € 0.00 | |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0002AA-AE) | | | | € 0.00 |
| 0003 | | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0003 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0003AA-AE) | | | | € 0.00 |
| C-0004 | | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | | | | |
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | | | | | | |
| C-0004 | AA | Gravel | 3000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AB | Sand | 1000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € 0.00 | € 0.00 |
| | TOTAL COST (0004AA-AC) | | | | € 0.00 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € 0.00 | € 0.00 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € 0.00 | € 0.00 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € 0.00 | € 0.00 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € 0.00 | € 0.00 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € 0.00 | € 0.00 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € 0.00 | € 0.00 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € 0.00 | € 0.00 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € 0.00 | € 0.00 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € 0.00 | € 0.00 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € 0.00 | € 0.00 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € 0.00 | € 0.00 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € 0.00 | € 0.00 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € 0.00 | € 0.00 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € 0.00 | € 0.00 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € 0.00 | € 0.00 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € 0.00 | € 0.00 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € 0.00 | € 0.00 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € 0.00 | € 0.00 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € 0.00 | € 0.00 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € 0.00 | € 0.00 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € 0.00 | € 0.00 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € 0.00 | € 0.00 |
| TOTAL COST (0005-0028) | | | | € 0.00 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| Delivery and installation of resilient surface system IAW Section 02821 | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € 0.00 | € 0.00 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € 0.00 | € 0.00 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € 0.00 | € 0.00 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € 0.00 | € 0.00 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € 0.00 | € 0.00 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € 0.00 | € 0.00 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € 0.00 | € 0.00 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € 0.00 | € 0.00 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € 0.00 | € 0.00 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € 0.00 | € 0.00 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € 0.00 | € 0.00 |
| | TOTAL COST (0029AA-AK) | | | | € 0.00 |
| | DEMOLITION | | | | |
| IAW Section 02 41 00 | | | | | | |
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € 0.00 | € 0.00 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € 0.00 | € 0.00 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € 0.00 | € 0.00 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € 0.00 | € 0.00 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € 0.00 | € 0.00 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € 0.00 | € 0.00 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € 0.00 | € 0.00 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0030AA-AN) | | | | € 0.00 |
| COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES | |
| For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8 | | |
| 0031 | All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award. | Not Entered by Contractor |
TOTAL COST (0031)
| EQUIPMENT PRICING SCHEDULE |
| IAW Section H, B, and C.5 | |
| Attach the Equipment List Description Pricing Schedule from Section B for the BASE YEAR 1 | |
0032 AA Equipment Total Price in Euro. € - 0
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | |
| IAW Section B and C.5 | | |
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%) | % |
&KFF0000W912GB-17-D-00XX
&KFF0000W912GB-17-D-00XX
&KFF0000W912GB-17-D-00XX
12 September 2016
12 September 2016
12 September 2016
BASE YR 2
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | | | |
| BASE YEAR 2 | | | | | | |
| LINE | | | | | | |
| ITEM | | DESCRIPTION | EST | | | | |
| QTY | U/I | Unit Price | Total Price | | | | |
| 0001 | | Maintenance, Inspection, and Safety Services | | | | |
| IAW Section C, Paragraph C.1.6.1.8 | | | | | | |
| 0001 | AA | Labor -Project Manager | 200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Laborer | 1200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Tractor / Lift Operator | 800 | HR | € 0.00 | € 0.00 |
| 0001 | AB | Fall Material HIC test and report | 50 | EA | € 0.00 | € 0.00 |
| 0001 | AC | Preventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction). | 650 | EA | € 0.00 | € 0.00 |
0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00
TOTAL COST (0001AA-AD) € 0.00
| 0002 | | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0002 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0002 | | | | | | |
AGM: AGM:
What is the difference between AB and AC?
| AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € 0.00 | € 0.00 | |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0002AA-AE) | | | | € 0.00 |
| 0003 | | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0003 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0003AA-AE) | | | | € 0.00 |
| C-0004 | | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | | | | |
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | | | | | | |
| C-0004 | AA | Gravel | 3000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AB | Sand | 1000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € 0.00 | € 0.00 |
| | TOTAL COST (0004AA-AC) | | | | € 0.00 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € 0.00 | € 0.00 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € 0.00 | € 0.00 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € 0.00 | € 0.00 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € 0.00 | € 0.00 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € 0.00 | € 0.00 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € 0.00 | € 0.00 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € 0.00 | € 0.00 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € 0.00 | € 0.00 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € 0.00 | € 0.00 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € 0.00 | € 0.00 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € 0.00 | € 0.00 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € 0.00 | € 0.00 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € 0.00 | € 0.00 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € 0.00 | € 0.00 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € 0.00 | € 0.00 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € 0.00 | € 0.00 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € 0.00 | € 0.00 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € 0.00 | € 0.00 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € 0.00 | € 0.00 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € 0.00 | € 0.00 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € 0.00 | € 0.00 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € 0.00 | € 0.00 |
| TOTAL COST (0005-0028) | | | | € 0.00 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| Delivery and installation of resilient surface system IAW Section 02821 | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € 0.00 | € 0.00 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € 0.00 | € 0.00 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € 0.00 | € 0.00 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € 0.00 | € 0.00 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € 0.00 | € 0.00 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € 0.00 | € 0.00 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € 0.00 | € 0.00 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € 0.00 | € 0.00 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € 0.00 | € 0.00 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € 0.00 | € 0.00 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € 0.00 | € 0.00 |
| | TOTAL COST (0029AA-AK) | | | | € 0.00 |
| | DEMOLITION | | | | |
| IAW Section 02 41 00 | | | | | | |
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € 0.00 | € 0.00 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € 0.00 | € 0.00 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € 0.00 | € 0.00 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € 0.00 | € 0.00 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € 0.00 | € 0.00 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € 0.00 | € 0.00 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € 0.00 | € 0.00 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0030AA-AN) | | | | € 0.00 |
| COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES | |
| For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8 | | |
| 0031 | All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award. | Not Entered by Contractor |
TOTAL COST (0031)
| EQUIPMENT PRICING SCHEDULE |
| IAW Section H, B, and C.5 | |
| Attach the Equipment Pricing Schedule for the BASE YEAR 2 | |
0032 AA Equipment Total Price in Euro. € - 0
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | |
| IAW Section B and C.5 | | |
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%) | % |
BASE YR 3
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | | | |
| BASE YEAR 3 | | | | | | |
| LINE | | | | | | |
| ITEM | | DESCRIPTION | EST | | | | |
| QTY | U/I | Unit Price | Total Price | | | | |
| 0001 | | Maintenance, Inspection, and Safety Services | | | | |
| IAW Section C, Paragraph C.1.6.1.8 | | | | | | |
| 0001 | AA | Labor -Project Manager | 200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Laborer | 1200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Tractor / Lift Operator | 800 | HR | € 0.00 | € 0.00 |
| 0001 | AB | Fall Material HIC test and report | 50 | EA | € 0.00 | € 0.00 |
| 0001 | AC | Preventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction). | 650 | EA | € 0.00 | € 0.00 |
0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00
TOTAL COST (0001AA-AD) € 0.00
| 0002 | | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0002 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0002 | | | | | | |
AGM: AGM:
What is the difference between AB and AC?
| AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € 0.00 | € 0.00 | |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0002AA-AE) | | | | € 0.00 |
| 0003 | | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0003 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0003AA-AE) | | | | € 0.00 |
| C-0004 | | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | | | | |
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | | | | | | |
| C-0004 | AA | Gravel | 3000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AB | Sand | 1000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € 0.00 | € 0.00 |
| | TOTAL COST (0004AA-AC) | | | | € 0.00 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € 0.00 | € 0.00 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € 0.00 | € 0.00 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € 0.00 | € 0.00 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € 0.00 | € 0.00 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € 0.00 | € 0.00 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € 0.00 | € 0.00 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € 0.00 | € 0.00 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € 0.00 | € 0.00 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € 0.00 | € 0.00 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € 0.00 | € 0.00 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € 0.00 | € 0.00 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € 0.00 | € 0.00 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € 0.00 | € 0.00 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € 0.00 | € 0.00 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € 0.00 | € 0.00 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € 0.00 | € 0.00 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € 0.00 | € 0.00 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € 0.00 | € 0.00 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € 0.00 | € 0.00 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € 0.00 | € 0.00 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € 0.00 | € 0.00 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € 0.00 | € 0.00 |
| TOTAL COST (0005-0028) | | | | € 0.00 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| Delivery and installation of resilient surface system IAW Section 02821 | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € 0.00 | € 0.00 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € 0.00 | € 0.00 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € 0.00 | € 0.00 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € 0.00 | € 0.00 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € 0.00 | € 0.00 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € 0.00 | € 0.00 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € 0.00 | € 0.00 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € 0.00 | € 0.00 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € 0.00 | € 0.00 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € 0.00 | € 0.00 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € 0.00 | € 0.00 |
| | TOTAL COST (0029AA-AK) | | | | € 0.00 |
| | DEMOLITION | | | | |
| IAW Section 02 41 00 | | | | | | |
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € 0.00 | € 0.00 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € 0.00 | € 0.00 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € 0.00 | € 0.00 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € 0.00 | € 0.00 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € 0.00 | € 0.00 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € 0.00 | € 0.00 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € 0.00 | € 0.00 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0030AA-AN) | | | | € 0.00 |
| COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES | |
| For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8 | | |
| 0031 | All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award. | Not Entered by Contractor |
TOTAL COST (0031)
| EQUIPMENT PRICING SCHEDULE |
| IAW Section H, B, and C.5 | |
| Attach the Equipment Pricing Schedule for the BASE YEAR 3 | |
0032 AA Equipment Total Price in Euro. € - 0
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | |
| IAW Section B and C.5 | | |
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%) | % |
Option YR 1
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | | | |
| OPTION YEAR 1 | | | | | | |
| LINE | | | | | | |
| ITEM | | DESCRIPTION | EST | | | | |
| QTY | U/I | Unit Price | Total Price | | | | |
| 0001 | | Maintenance, Inspection, and Safety Services | | | | |
| IAW Section C, Paragraph C.1.6.1.8 | | | | | | |
| 0001 | AA | Labor -Project Manager | 200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Laborer | 1200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Tractor / Lift Operator | 800 | HR | € 0.00 | € 0.00 |
| 0001 | AB | Fall Material HIC test and report | 50 | EA | € 0.00 | € 0.00 |
| 0001 | AC | Preventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction). | 650 | EA | € 0.00 | € 0.00 |
0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00
TOTAL COST (0001AA-AD) € 0.00
| 0002 | | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0002 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0002 | | | | | | |
AGM: AGM:
What is the difference between AB and AC?
| AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € 0.00 | € 0.00 | |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0002AA-AE) | | | | € 0.00 |
| 0003 | | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0003 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0003AA-AE) | | | | € 0.00 |
| C-0004 | | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | | | | |
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | | | | | | |
| C-0004 | AA | Gravel | 3000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AB | Sand | 1000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € 0.00 | € 0.00 |
| | TOTAL COST (0004AA-AC) | | | | € 0.00 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € 0.00 | € 0.00 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € 0.00 | € 0.00 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € 0.00 | € 0.00 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € 0.00 | € 0.00 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € 0.00 | € 0.00 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € 0.00 | € 0.00 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € 0.00 | € 0.00 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € 0.00 | € 0.00 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € 0.00 | € 0.00 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € 0.00 | € 0.00 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € 0.00 | € 0.00 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € 0.00 | € 0.00 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € 0.00 | € 0.00 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € 0.00 | € 0.00 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € 0.00 | € 0.00 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € 0.00 | € 0.00 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € 0.00 | € 0.00 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € 0.00 | € 0.00 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € 0.00 | € 0.00 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € 0.00 | € 0.00 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € 0.00 | € 0.00 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € 0.00 | € 0.00 |
| TOTAL COST (0005-0028) | | | | € 0.00 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| Delivery and installation of resilient surface system IAW Section 02821 | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € 0.00 | € 0.00 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € 0.00 | € 0.00 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € 0.00 | € 0.00 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € 0.00 | € 0.00 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € 0.00 | € 0.00 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € 0.00 | € 0.00 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € 0.00 | € 0.00 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € 0.00 | € 0.00 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € 0.00 | € 0.00 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € 0.00 | € 0.00 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € 0.00 | € 0.00 |
| | TOTAL COST (0029AA-AK) | | | | € 0.00 |
| | DEMOLITION | | | | |
| IAW Section 02 41 00 | | | | | | |
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € 0.00 | € 0.00 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € 0.00 | € 0.00 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € 0.00 | € 0.00 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € 0.00 | € 0.00 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € 0.00 | € 0.00 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € 0.00 | € 0.00 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € 0.00 | € 0.00 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0030AA-AN) | | | | € 0.00 |
| COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES | |
| For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8 | | |
| 0031 | All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award. | Not Entered by Contractor |
TOTAL COST (0031)
| EQUIPMENT PRICING SCHEDULE |
| IAW Section H, B, and C.5 | |
| Attach the Equipment Pricing Schedule for the OPTION YEAR 1 | |
0032 AA Equipment Total Price in Euro. € - 0
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | |
| IAW Section B and C.5 | | |
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%) | % |
OPTION YR 2
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | | | |
| OPTION YEAR 2 | | | | | | |
| LINE | | | | | | |
| ITEM | | DESCRIPTION | EST | | | | |
| QTY | U/I | Unit Price | Total Price | | | | |
| 0001 | | Maintenance, Inspection, and Safety Services | | | | |
| IAW Section C, Paragraph C.1.6.1.8 | | | | | | |
| 0001 | AA | Labor -Project Manager | 200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Laborer | 1200 | HR | € 0.00 | € 0.00 |
| 0001 | AA | Labor - Tractor / Lift Operator | 800 | HR | € 0.00 | € 0.00 |
| 0001 | AB | Fall Material HIC test and report | 50 | EA | € 0.00 | € 0.00 |
| 0001 | AC | Preventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction). | 650 | EA | € 0.00 | € 0.00 |
0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00
TOTAL COST (0001AA-AD) € 0.00
| 0002 | | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0002 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0002 | | | | | | |
AGM: AGM:
What is the difference between AB and AC?
| AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € 0.00 | € 0.00 | |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0002 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0002AA-AE) | | | | € 0.00 |
| 0003 | | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | | | | |
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | | | | | | |
| 0003 | AA | Cost per centimeter layer | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € 0.00 | € 0.00 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € 0.00 | € 0.00 |
| 0003 | AE | Wood Fiber | 500 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0003AA-AE) | | | | € 0.00 |
| C-0004 | | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | | | | |
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | | | | | | |
| C-0004 | AA | Gravel | 3000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AB | Sand | 1000 | M3 | € 0.00 | € 0.00 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € 0.00 | € 0.00 |
| | TOTAL COST (0004AA-AC) | | | | € 0.00 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € 0.00 | € 0.00 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € 0.00 | € 0.00 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € 0.00 | € 0.00 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € 0.00 | € 0.00 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € 0.00 | € 0.00 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € 0.00 | € 0.00 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € 0.00 | € 0.00 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € 0.00 | € 0.00 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € 0.00 | € 0.00 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € 0.00 | € 0.00 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € 0.00 | € 0.00 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € 0.00 | € 0.00 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € 0.00 | € 0.00 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € 0.00 | € 0.00 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € 0.00 | € 0.00 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € 0.00 | € 0.00 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € 0.00 | € 0.00 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € 0.00 | € 0.00 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € 0.00 | € 0.00 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € 0.00 | € 0.00 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € 0.00 | € 0.00 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € 0.00 | € 0.00 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € 0.00 | € 0.00 |
| TOTAL COST (0005-0028) | | | | € 0.00 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| Delivery and installation of resilient surface system IAW Section 02821 | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € 0.00 | € 0.00 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € 0.00 | € 0.00 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € 0.00 | € 0.00 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € 0.00 | € 0.00 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € 0.00 | € 0.00 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € 0.00 | € 0.00 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € 0.00 | € 0.00 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € 0.00 | € 0.00 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € 0.00 | € 0.00 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € 0.00 | € 0.00 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € 0.00 | € 0.00 |
| | TOTAL COST (0029AA-AK) | | | | € 0.00 |
| | DEMOLITION | | | | |
| IAW Section 02 41 00 | | | | | | |
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € 0.00 | € 0.00 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € 0.00 | € 0.00 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € 0.00 | € 0.00 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € 0.00 | € 0.00 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € 0.00 | € 0.00 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € 0.00 | € 0.00 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € 0.00 | € 0.00 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € 0.00 | € 0.00 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € 0.00 | € 0.00 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € 0.00 | € 0.00 |
| | TOTAL COST (0030AA-AN) | | | | € 0.00 |
| COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES | |
| For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8 | | |
| 0031 | All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award. | Not Entered by Contractor |
TOTAL COST (0031)
| EQUIPMENT PRICING SCHEDULE |
| IAW Section H, B, and C.5 | |
| Attach the Equipment Pricing Schedule for the OPTION YEAR 2 | |
0032 AA Equipment Total Price in Euro. € 0.00
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | |
| IAW Section B and C.5 | | |
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%) | % |
SUM
| Base Period, Option 1, Option 2 | |
| Bottom Line Sum Base Year 1 | € - 0 |
| Bottom Line Sum Base Year 2 | € - 0 |
| Bottom Line Sum Base Year 3 | € - 0 |
| Bottom Line Sum Option Year 1 | € - 0 |
| Bottom Line Sum Option Year 2 | € - 0 |
| Total Bottom Line Sum | € - 0 |