Playground_IDIQ_Bid_Schedule_13_January_2017_(Revised).xlsx

XLSX spreadsheet 254 KB Posted

Attached to
Fiscal Year 2017 (FY17) Playgrounds Single Award Task Order Contract (SATOC)
Solicitation number
W912GB-17-R-0009
Issued by

About this file

The attached 13 Jan 2017 Bid Schedule is corrected to show line item 0003AA as a unit of measure of SM and the Summary sheet was corrected to be in Euro instead of $.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment Price List

SECTION BSCHEDULE OF SERVICES AND RATES PLAYGROUNDS
Equipment Price List
ITEMDESCRIPTIONEST
QTYU/IUnit PriceTotal PriceCatalog/Page Number
1Park Bench, with back, 6-foot20EA€ - 0
2Park Bench, without back, 6-foot10ES€ - 0
3Square Sunshade Structure, 10-foot x 10-foot5LS€ - 0
4Square Sunshade Structure, 15-foot x 15-foot5LS€ - 0
5Square Sunshade Structure, 20-foot x 20-foot10LS€ - 0
6Pre-school age (2 to 5 years old) Climb Structure15LS€ - 0
7School Age (5 to 12 years old) Climb Structure20LS€ - 0
8Swing Set, 7-foot (H) x 10-foot (W), two seats for pre-school age children15LS€ - 0
9Swing Set, 8-foot (H) x 10-foot (W), two seats for school age children15LS€ - 0
10Playhouse, 5-foot x 5-foot15EA€ - 0
11Picnic Table, 6-foot10EA€ - 0
12Picnic Table, 4-foot10EA€ - 0
Price for Equipment€ - 0
Discount0.00%

0032 Equipment Total Price € 0.00

BASE YR 1

SECTION BSCHEDULE OF SERVICES AND RATES PLAYGROUNDS
BASE YEAR 1
LINE
ITEMDESCRIPTIONEST
QTYU/IUnit PriceTotal Price
0001Maintenance, Inspection, and Safety Services
IAW Section C, Paragraph C.1.6.1.8
0001AALabor -Project Manager200HR€ 0.00€ 0.00
0001AALabor - Laborer1200HR€ 0.00€ 0.00
0001AALabor - Tractor / Lift Operator800HR€ 0.00€ 0.00
0001ABFall Material HIC test and report50EA€ 0.00€ 0.00
0001ACPreventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction).650EA€ 0.00€ 0.00

0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00

TOTAL COST (0001AA-AD) € 0.00

0002RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0002AACost per centimeter layer500SM€ 0.00€ 0.00
0002

AGM: AGM:

What is the difference between AB and AC?

ABPoured in Place under 5cm(IAW ASTM and pass HIC Test)500SM€ 0.00€ 0.00
0002ACPoured in Place over 5cm (IAW ASTM and pass HIC Test)1000SM€ 0.00€ 0.00
0002ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0002AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0002AA-AE)€ 0.00
0003RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0003AACost per centimeter layer500SM€ 0.00€ 0.00
0003ABRubber Tiles (min. 5cm thick)500SM€ 0.00€ 0.00
0003ACRubber Tiles (min. 7cm thick)1000SM€ 0.00€ 0.00
0003ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0003AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0003AA-AE)€ 0.00
C-0004DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
Delivery and installation of resilient surface system IAW Section C.6.2.4
C-0004AAGravel3000M3€ 0.00€ 0.00
C-0004ABSand1000M3€ 0.00€ 0.00
C-0004ACRe-compact and level base after equipment installation10000SM€ 0.00€ 0.00
TOTAL COST (0004AA-AC)€ 0.00
MISCELLANEOUS WORK DESCRIPTION
C-0005Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.138000LM€ 0.00€ 0.00
C-0006Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.105500LM€ 0.00€ 0.00
C-0007Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.125000SM€ 0.00€ 0.00
C-0008Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6250CM€ 0.00€ 0.00
C-0009Furnish and install reinforced concrete (B25), IAW Section C.6.2.9150CM€ 0.00€ 0.00
C-0010Remove and stockpile topsoil on site, IAW Section 023001000CM€ 0.00€ 0.00
C-0011Furnish and install unreinforced concrete (B25), IAW Section C.6.2.91000CM€ 0.00€ 0.00
C-0012Soil excavation, machine: class 3-5, IAW Section 023003000CM€ 0.00€ 0.00
C-0013Backfill trenches, IAW Section 02300250CM€ 0.00€ 0.00
C-0014Install and connect drain/seepage lines, IAW Section C.6.2.6250LM€ 0.00€ 0.00
C-0015Furnish and install trench\gutter draiange IAW C.6.2.6.125LM€ 0.00€ 0.00
C-0016Install bituminous surface material, IAW Section C.6.2.81000CM€ 0.00€ 0.00
C-0017Clean-up IAW Section C.6.2.165000SM€ 0.00€ 0.00
C-0018Safety fence, delivered and installed, IAW Section C.6.2.13.15000LM€ 0.00€ 0.00
C-0019Locate existing utility lines, IAW Section 023005000SM€ 0.00€ 0.00
C-0020Soil excavation, by hand: class 3-5, IAW Section 02300500CM€ 0.00€ 0.00
C-0021Furnish and place topsoil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0022Furnish and place sub-grade soil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0023Furnish and install rolled sod IAW C.6.2.5.51000SM€ 0.00€ 0.00
C-0024Furnish and install geotextile seperation layer IAW C.6.2.5.61000SM€ 0.00€ 0.00
C-0025Furnish and install biodegradable type erosion control material IAW C.6.2.5.71000SM€ 0.00€ 0.00
C-0026Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8400HR€ 0.00€ 0.00
C-0027Painting IAW C.6.2.5.91000SM€ 0.00€ 0.00
C-0028Water Line IAW C.6.2.6.21000LM€ 0.00€ 0.00
TOTAL COST (0005-0028)€ 0.00
DELIVERY AND INSTALLATION OF FENCING
Delivery and installation of resilient surface system IAW Section 02821
C-0029AAWelded bar fence IAW C.6.2.13.31500SM€ 0.00€ 0.00
C-0029ABChain Link Fence IAW C.6.2.13.4400SM€ 0.00€ 0.00
C-0029ACWooden fence IAW C.6.2.13.2100SM€ 0.00€ 0.00
C-0029ADRound Fence Post IAW C.6.2.13.5100M€ 0.00€ 0.00
C-0029AESquare/Rect. Fence Post IAW C.6.2.13.5500M€ 0.00€ 0.00
C-0029AFWooden fence post IAW C.6.2.13.2.150M€ 0.00€ 0.00
C-0029AGConcrete Foundation IAW C.6.2.13.6300CM€ 0.00€ 0.00
C-0029AHChain Link fence Gate IAW C.6.2.13.740SM€ 0.00€ 0.00
C-0029AIWelded bar fence Gate IAW C.6.2.13.7200SM€ 0.00€ 0.00
C-0029AJWooden fence Gate IAW C.6.2.13.710SM€ 0.00€ 0.00
C-0029AKReplace hardware IAW C.6.2.13.850EA€ 0.00€ 0.00
TOTAL COST (0029AA-AK)€ 0.00
DEMOLITION
IAW Section 02 41 00
C-0030AARemove and dispose of fence post500EA€ 0.00€ 0.00
C-0030ABRemove and dispose of fence material1000SM€ 0.00€ 0.00
C-0030ACRemove and dispose of post foundation300CM€ 0.00€ 0.00
C-0030ADRemove and dispose of old plastic Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AERemove and dispose of old wooden Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AFRemove and dispose of old metal Equipment including connection mat.300CM€ 0.00€ 0.00
C-0030AGRemove and dispose of earth1000CM€ 0.00€ 0.00
C-0030AHRemove and dispose of bituminous mat.200CM€ 0.00€ 0.00
C-0030AIRemove and dispose of reinforced concrete400CM€ 0.00€ 0.00
C-0030AJRemove and dispose of unreinforced concrete500CM€ 0.00€ 0.00
C-0030AKRemove and dispose of concrete pavers1600SM€ 0.00€ 0.00
C-0030ALRemove and dispose of rubberized fall material1000CM€ 0.00€ 0.00
C-0030AMRemove and dispose of artificial grass fall material100CM€ 0.00€ 0.00
C-0030ANRemove and dispose of wood fiber fall material200CM€ 0.00€ 0.00
TOTAL COST (0030AA-AN)€ 0.00
COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES
For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8
0031All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award.Not Entered by Contractor

TOTAL COST (0031)

EQUIPMENT PRICING SCHEDULE
IAW Section H, B, and C.5
Attach the Equipment List Description Pricing Schedule from Section B for the BASE YEAR 1

0032 AA Equipment Total Price in Euro. € - 0

DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
IAW Section B and C.5
0033Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%)%
TOTAL BASE YEAR
€ 0.00

&KFF0000W912GB-17-D-00XX

&KFF0000W912GB-17-D-00XX

&KFF0000W912GB-17-D-00XX

12 September 2016

12 September 2016

12 September 2016

BASE YR 2

SECTION BSCHEDULE OF SERVICES AND RATES PLAYGROUNDS
BASE YEAR 2
LINE
ITEMDESCRIPTIONEST
QTYU/IUnit PriceTotal Price
0001Maintenance, Inspection, and Safety Services
IAW Section C, Paragraph C.1.6.1.8
0001AALabor -Project Manager200HR€ 0.00€ 0.00
0001AALabor - Laborer1200HR€ 0.00€ 0.00
0001AALabor - Tractor / Lift Operator800HR€ 0.00€ 0.00
0001ABFall Material HIC test and report50EA€ 0.00€ 0.00
0001ACPreventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction).650EA€ 0.00€ 0.00

0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00

TOTAL COST (0001AA-AD) € 0.00

0002RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0002AACost per centimeter layer500SM€ 0.00€ 0.00
0002

AGM: AGM:

What is the difference between AB and AC?

ABPoured in Place under 5cm(IAW ASTM and pass HIC Test)500SM€ 0.00€ 0.00
0002ACPoured in Place over 5cm (IAW ASTM and pass HIC Test)1000SM€ 0.00€ 0.00
0002ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0002AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0002AA-AE)€ 0.00
0003RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0003AACost per centimeter layer500SM€ 0.00€ 0.00
0003ABRubber Tiles (min. 5cm thick)500SM€ 0.00€ 0.00
0003ACRubber Tiles (min. 7cm thick)1000SM€ 0.00€ 0.00
0003ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0003AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0003AA-AE)€ 0.00
C-0004DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
Delivery and installation of resilient surface system IAW Section C.6.2.4
C-0004AAGravel3000M3€ 0.00€ 0.00
C-0004ABSand1000M3€ 0.00€ 0.00
C-0004ACRe-compact and level base after equipment installation10000SM€ 0.00€ 0.00
TOTAL COST (0004AA-AC)€ 0.00
MISCELLANEOUS WORK DESCRIPTION
C-0005Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.138000LM€ 0.00€ 0.00
C-0006Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.105500LM€ 0.00€ 0.00
C-0007Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.125000SM€ 0.00€ 0.00
C-0008Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6250CM€ 0.00€ 0.00
C-0009Furnish and install reinforced concrete (B25), IAW Section C.6.2.9150CM€ 0.00€ 0.00
C-0010Remove and stockpile topsoil on site, IAW Section 023001000CM€ 0.00€ 0.00
C-0011Furnish and install unreinforced concrete (B25), IAW Section C.6.2.91000CM€ 0.00€ 0.00
C-0012Soil excavation, machine: class 3-5, IAW Section 023003000CM€ 0.00€ 0.00
C-0013Backfill trenches, IAW Section 02300250CM€ 0.00€ 0.00
C-0014Install and connect drain/seepage lines, IAW Section C.6.2.6250LM€ 0.00€ 0.00
C-0015Furnish and install trench\gutter draiange IAW C.6.2.6.125LM€ 0.00€ 0.00
C-0016Install bituminous surface material, IAW Section C.6.2.81000CM€ 0.00€ 0.00
C-0017Clean-up IAW Section C.6.2.165000SM€ 0.00€ 0.00
C-0018Safety fence, delivered and installed, IAW Section C.6.2.13.15000LM€ 0.00€ 0.00
C-0019Locate existing utility lines, IAW Section 023005000SM€ 0.00€ 0.00
C-0020Soil excavation, by hand: class 3-5, IAW Section 02300500CM€ 0.00€ 0.00
C-0021Furnish and place topsoil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0022Furnish and place sub-grade soil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0023Furnish and install rolled sod IAW C.6.2.5.51000SM€ 0.00€ 0.00
C-0024Furnish and install geotextile seperation layer IAW C.6.2.5.61000SM€ 0.00€ 0.00
C-0025Furnish and install biodegradable type erosion control material IAW C.6.2.5.71000SM€ 0.00€ 0.00
C-0026Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8400HR€ 0.00€ 0.00
C-0027Painting IAW C.6.2.5.91000SM€ 0.00€ 0.00
C-0028Water Line IAW C.6.2.6.21000LM€ 0.00€ 0.00
TOTAL COST (0005-0028)€ 0.00
DELIVERY AND INSTALLATION OF FENCING
Delivery and installation of resilient surface system IAW Section 02821
C-0029AAWelded bar fence IAW C.6.2.13.31500SM€ 0.00€ 0.00
C-0029ABChain Link Fence IAW C.6.2.13.4400SM€ 0.00€ 0.00
C-0029ACWooden fence IAW C.6.2.13.2100SM€ 0.00€ 0.00
C-0029ADRound Fence Post IAW C.6.2.13.5100M€ 0.00€ 0.00
C-0029AESquare/Rect. Fence Post IAW C.6.2.13.5500M€ 0.00€ 0.00
C-0029AFWooden fence post IAW C.6.2.13.2.150M€ 0.00€ 0.00
C-0029AGConcrete Foundation IAW C.6.2.13.6300CM€ 0.00€ 0.00
C-0029AHChain Link fence Gate IAW C.6.2.13.740SM€ 0.00€ 0.00
C-0029AIWelded bar fence Gate IAW C.6.2.13.7200SM€ 0.00€ 0.00
C-0029AJWooden fence Gate IAW C.6.2.13.710SM€ 0.00€ 0.00
C-0029AKReplace hardware IAW C.6.2.13.850EA€ 0.00€ 0.00
TOTAL COST (0029AA-AK)€ 0.00
DEMOLITION
IAW Section 02 41 00
C-0030AARemove and dispose of fence post500EA€ 0.00€ 0.00
C-0030ABRemove and dispose of fence material1000SM€ 0.00€ 0.00
C-0030ACRemove and dispose of post foundation300CM€ 0.00€ 0.00
C-0030ADRemove and dispose of old plastic Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AERemove and dispose of old wooden Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AFRemove and dispose of old metal Equipment including connection mat.300CM€ 0.00€ 0.00
C-0030AGRemove and dispose of earth1000CM€ 0.00€ 0.00
C-0030AHRemove and dispose of bituminous mat.200CM€ 0.00€ 0.00
C-0030AIRemove and dispose of reinforced concrete400CM€ 0.00€ 0.00
C-0030AJRemove and dispose of unreinforced concrete500CM€ 0.00€ 0.00
C-0030AKRemove and dispose of concrete pavers1600SM€ 0.00€ 0.00
C-0030ALRemove and dispose of rubberized fall material1000CM€ 0.00€ 0.00
C-0030AMRemove and dispose of artificial grass fall material100CM€ 0.00€ 0.00
C-0030ANRemove and dispose of wood fiber fall material200CM€ 0.00€ 0.00
TOTAL COST (0030AA-AN)€ 0.00
COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES
For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8
0031All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award.Not Entered by Contractor

TOTAL COST (0031)

EQUIPMENT PRICING SCHEDULE
IAW Section H, B, and C.5
Attach the Equipment Pricing Schedule for the BASE YEAR 2

0032 AA Equipment Total Price in Euro. € - 0

DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
IAW Section B and C.5
0033Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%)%
TOTAL BASE YEAR
€ 0.00

BASE YR 3

SECTION BSCHEDULE OF SERVICES AND RATES PLAYGROUNDS
BASE YEAR 3
LINE
ITEMDESCRIPTIONEST
QTYU/IUnit PriceTotal Price
0001Maintenance, Inspection, and Safety Services
IAW Section C, Paragraph C.1.6.1.8
0001AALabor -Project Manager200HR€ 0.00€ 0.00
0001AALabor - Laborer1200HR€ 0.00€ 0.00
0001AALabor - Tractor / Lift Operator800HR€ 0.00€ 0.00
0001ABFall Material HIC test and report50EA€ 0.00€ 0.00
0001ACPreventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction).650EA€ 0.00€ 0.00

0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00

TOTAL COST (0001AA-AD) € 0.00

0002RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0002AACost per centimeter layer500SM€ 0.00€ 0.00
0002

AGM: AGM:

What is the difference between AB and AC?

ABPoured in Place under 5cm(IAW ASTM and pass HIC Test)500SM€ 0.00€ 0.00
0002ACPoured in Place over 5cm (IAW ASTM and pass HIC Test)1000SM€ 0.00€ 0.00
0002ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0002AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0002AA-AE)€ 0.00
0003RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0003AACost per centimeter layer500SM€ 0.00€ 0.00
0003ABRubber Tiles (min. 5cm thick)500SM€ 0.00€ 0.00
0003ACRubber Tiles (min. 7cm thick)1000SM€ 0.00€ 0.00
0003ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0003AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0003AA-AE)€ 0.00
C-0004DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
Delivery and installation of resilient surface system IAW Section C.6.2.4
C-0004AAGravel3000M3€ 0.00€ 0.00
C-0004ABSand1000M3€ 0.00€ 0.00
C-0004ACRe-compact and level base after equipment installation10000SM€ 0.00€ 0.00
TOTAL COST (0004AA-AC)€ 0.00
MISCELLANEOUS WORK DESCRIPTION
C-0005Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.138000LM€ 0.00€ 0.00
C-0006Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.105500LM€ 0.00€ 0.00
C-0007Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.125000SM€ 0.00€ 0.00
C-0008Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6250CM€ 0.00€ 0.00
C-0009Furnish and install reinforced concrete (B25), IAW Section C.6.2.9150CM€ 0.00€ 0.00
C-0010Remove and stockpile topsoil on site, IAW Section 023001000CM€ 0.00€ 0.00
C-0011Furnish and install unreinforced concrete (B25), IAW Section C.6.2.91000CM€ 0.00€ 0.00
C-0012Soil excavation, machine: class 3-5, IAW Section 023003000CM€ 0.00€ 0.00
C-0013Backfill trenches, IAW Section 02300250CM€ 0.00€ 0.00
C-0014Install and connect drain/seepage lines, IAW Section C.6.2.6250LM€ 0.00€ 0.00
C-0015Furnish and install trench\gutter draiange IAW C.6.2.6.125LM€ 0.00€ 0.00
C-0016Install bituminous surface material, IAW Section C.6.2.81000CM€ 0.00€ 0.00
C-0017Clean-up IAW Section C.6.2.165000SM€ 0.00€ 0.00
C-0018Safety fence, delivered and installed, IAW Section C.6.2.13.15000LM€ 0.00€ 0.00
C-0019Locate existing utility lines, IAW Section 023005000SM€ 0.00€ 0.00
C-0020Soil excavation, by hand: class 3-5, IAW Section 02300500CM€ 0.00€ 0.00
C-0021Furnish and place topsoil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0022Furnish and place sub-grade soil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0023Furnish and install rolled sod IAW C.6.2.5.51000SM€ 0.00€ 0.00
C-0024Furnish and install geotextile seperation layer IAW C.6.2.5.61000SM€ 0.00€ 0.00
C-0025Furnish and install biodegradable type erosion control material IAW C.6.2.5.71000SM€ 0.00€ 0.00
C-0026Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8400HR€ 0.00€ 0.00
C-0027Painting IAW C.6.2.5.91000SM€ 0.00€ 0.00
C-0028Water Line IAW C.6.2.6.21000LM€ 0.00€ 0.00
TOTAL COST (0005-0028)€ 0.00
DELIVERY AND INSTALLATION OF FENCING
Delivery and installation of resilient surface system IAW Section 02821
C-0029AAWelded bar fence IAW C.6.2.13.31500SM€ 0.00€ 0.00
C-0029ABChain Link Fence IAW C.6.2.13.4400SM€ 0.00€ 0.00
C-0029ACWooden fence IAW C.6.2.13.2100SM€ 0.00€ 0.00
C-0029ADRound Fence Post IAW C.6.2.13.5100M€ 0.00€ 0.00
C-0029AESquare/Rect. Fence Post IAW C.6.2.13.5500M€ 0.00€ 0.00
C-0029AFWooden fence post IAW C.6.2.13.2.150M€ 0.00€ 0.00
C-0029AGConcrete Foundation IAW C.6.2.13.6300CM€ 0.00€ 0.00
C-0029AHChain Link fence Gate IAW C.6.2.13.740SM€ 0.00€ 0.00
C-0029AIWelded bar fence Gate IAW C.6.2.13.7200SM€ 0.00€ 0.00
C-0029AJWooden fence Gate IAW C.6.2.13.710SM€ 0.00€ 0.00
C-0029AKReplace hardware IAW C.6.2.13.850EA€ 0.00€ 0.00
TOTAL COST (0029AA-AK)€ 0.00
DEMOLITION
IAW Section 02 41 00
C-0030AARemove and dispose of fence post500EA€ 0.00€ 0.00
C-0030ABRemove and dispose of fence material1000SM€ 0.00€ 0.00
C-0030ACRemove and dispose of post foundation300CM€ 0.00€ 0.00
C-0030ADRemove and dispose of old plastic Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AERemove and dispose of old wooden Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AFRemove and dispose of old metal Equipment including connection mat.300CM€ 0.00€ 0.00
C-0030AGRemove and dispose of earth1000CM€ 0.00€ 0.00
C-0030AHRemove and dispose of bituminous mat.200CM€ 0.00€ 0.00
C-0030AIRemove and dispose of reinforced concrete400CM€ 0.00€ 0.00
C-0030AJRemove and dispose of unreinforced concrete500CM€ 0.00€ 0.00
C-0030AKRemove and dispose of concrete pavers1600SM€ 0.00€ 0.00
C-0030ALRemove and dispose of rubberized fall material1000CM€ 0.00€ 0.00
C-0030AMRemove and dispose of artificial grass fall material100CM€ 0.00€ 0.00
C-0030ANRemove and dispose of wood fiber fall material200CM€ 0.00€ 0.00
TOTAL COST (0030AA-AN)€ 0.00
COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES
For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8
0031All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award.Not Entered by Contractor

TOTAL COST (0031)

EQUIPMENT PRICING SCHEDULE
IAW Section H, B, and C.5
Attach the Equipment Pricing Schedule for the BASE YEAR 3

0032 AA Equipment Total Price in Euro. € - 0

DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
IAW Section B and C.5
0033Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%)%
TOTAL BASE YEAR
€ 0.00

Option YR 1

SECTION BSCHEDULE OF SERVICES AND RATES PLAYGROUNDS
OPTION YEAR 1
LINE
ITEMDESCRIPTIONEST
QTYU/IUnit PriceTotal Price
0001Maintenance, Inspection, and Safety Services
IAW Section C, Paragraph C.1.6.1.8
0001AALabor -Project Manager200HR€ 0.00€ 0.00
0001AALabor - Laborer1200HR€ 0.00€ 0.00
0001AALabor - Tractor / Lift Operator800HR€ 0.00€ 0.00
0001ABFall Material HIC test and report50EA€ 0.00€ 0.00
0001ACPreventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction).650EA€ 0.00€ 0.00

0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00

TOTAL COST (0001AA-AD) € 0.00

0002RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0002AACost per centimeter layer500SM€ 0.00€ 0.00
0002

AGM: AGM:

What is the difference between AB and AC?

ABPoured in Place under 5cm(IAW ASTM and pass HIC Test)500SM€ 0.00€ 0.00
0002ACPoured in Place over 5cm (IAW ASTM and pass HIC Test)1000SM€ 0.00€ 0.00
0002ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0002AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0002AA-AE)€ 0.00
0003RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0003AACost per centimeter layer500SM€ 0.00€ 0.00
0003ABRubber Tiles (min. 5cm thick)500SM€ 0.00€ 0.00
0003ACRubber Tiles (min. 7cm thick)1000SM€ 0.00€ 0.00
0003ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0003AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0003AA-AE)€ 0.00
C-0004DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
Delivery and installation of resilient surface system IAW Section C.6.2.4
C-0004AAGravel3000M3€ 0.00€ 0.00
C-0004ABSand1000M3€ 0.00€ 0.00
C-0004ACRe-compact and level base after equipment installation10000SM€ 0.00€ 0.00
TOTAL COST (0004AA-AC)€ 0.00
MISCELLANEOUS WORK DESCRIPTION
C-0005Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.138000LM€ 0.00€ 0.00
C-0006Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.105500LM€ 0.00€ 0.00
C-0007Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.125000SM€ 0.00€ 0.00
C-0008Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6250CM€ 0.00€ 0.00
C-0009Furnish and install reinforced concrete (B25), IAW Section C.6.2.9150CM€ 0.00€ 0.00
C-0010Remove and stockpile topsoil on site, IAW Section 023001000CM€ 0.00€ 0.00
C-0011Furnish and install unreinforced concrete (B25), IAW Section C.6.2.91000CM€ 0.00€ 0.00
C-0012Soil excavation, machine: class 3-5, IAW Section 023003000CM€ 0.00€ 0.00
C-0013Backfill trenches, IAW Section 02300250CM€ 0.00€ 0.00
C-0014Install and connect drain/seepage lines, IAW Section C.6.2.6250LM€ 0.00€ 0.00
C-0015Furnish and install trench\gutter draiange IAW C.6.2.6.125LM€ 0.00€ 0.00
C-0016Install bituminous surface material, IAW Section C.6.2.81000CM€ 0.00€ 0.00
C-0017Clean-up IAW Section C.6.2.165000SM€ 0.00€ 0.00
C-0018Safety fence, delivered and installed, IAW Section C.6.2.13.15000LM€ 0.00€ 0.00
C-0019Locate existing utility lines, IAW Section 023005000SM€ 0.00€ 0.00
C-0020Soil excavation, by hand: class 3-5, IAW Section 02300500CM€ 0.00€ 0.00
C-0021Furnish and place topsoil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0022Furnish and place sub-grade soil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0023Furnish and install rolled sod IAW C.6.2.5.51000SM€ 0.00€ 0.00
C-0024Furnish and install geotextile seperation layer IAW C.6.2.5.61000SM€ 0.00€ 0.00
C-0025Furnish and install biodegradable type erosion control material IAW C.6.2.5.71000SM€ 0.00€ 0.00
C-0026Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8400HR€ 0.00€ 0.00
C-0027Painting IAW C.6.2.5.91000SM€ 0.00€ 0.00
C-0028Water Line IAW C.6.2.6.21000LM€ 0.00€ 0.00
TOTAL COST (0005-0028)€ 0.00
DELIVERY AND INSTALLATION OF FENCING
Delivery and installation of resilient surface system IAW Section 02821
C-0029AAWelded bar fence IAW C.6.2.13.31500SM€ 0.00€ 0.00
C-0029ABChain Link Fence IAW C.6.2.13.4400SM€ 0.00€ 0.00
C-0029ACWooden fence IAW C.6.2.13.2100SM€ 0.00€ 0.00
C-0029ADRound Fence Post IAW C.6.2.13.5100M€ 0.00€ 0.00
C-0029AESquare/Rect. Fence Post IAW C.6.2.13.5500M€ 0.00€ 0.00
C-0029AFWooden fence post IAW C.6.2.13.2.150M€ 0.00€ 0.00
C-0029AGConcrete Foundation IAW C.6.2.13.6300CM€ 0.00€ 0.00
C-0029AHChain Link fence Gate IAW C.6.2.13.740SM€ 0.00€ 0.00
C-0029AIWelded bar fence Gate IAW C.6.2.13.7200SM€ 0.00€ 0.00
C-0029AJWooden fence Gate IAW C.6.2.13.710SM€ 0.00€ 0.00
C-0029AKReplace hardware IAW C.6.2.13.850EA€ 0.00€ 0.00
TOTAL COST (0029AA-AK)€ 0.00
DEMOLITION
IAW Section 02 41 00
C-0030AARemove and dispose of fence post500EA€ 0.00€ 0.00
C-0030ABRemove and dispose of fence material1000SM€ 0.00€ 0.00
C-0030ACRemove and dispose of post foundation300CM€ 0.00€ 0.00
C-0030ADRemove and dispose of old plastic Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AERemove and dispose of old wooden Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AFRemove and dispose of old metal Equipment including connection mat.300CM€ 0.00€ 0.00
C-0030AGRemove and dispose of earth1000CM€ 0.00€ 0.00
C-0030AHRemove and dispose of bituminous mat.200CM€ 0.00€ 0.00
C-0030AIRemove and dispose of reinforced concrete400CM€ 0.00€ 0.00
C-0030AJRemove and dispose of unreinforced concrete500CM€ 0.00€ 0.00
C-0030AKRemove and dispose of concrete pavers1600SM€ 0.00€ 0.00
C-0030ALRemove and dispose of rubberized fall material1000CM€ 0.00€ 0.00
C-0030AMRemove and dispose of artificial grass fall material100CM€ 0.00€ 0.00
C-0030ANRemove and dispose of wood fiber fall material200CM€ 0.00€ 0.00
TOTAL COST (0030AA-AN)€ 0.00
COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES
For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8
0031All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award.Not Entered by Contractor

TOTAL COST (0031)

EQUIPMENT PRICING SCHEDULE
IAW Section H, B, and C.5
Attach the Equipment Pricing Schedule for the OPTION YEAR 1

0032 AA Equipment Total Price in Euro. € - 0

DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
IAW Section B and C.5
0033Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%)%
TOTAL BASE YEAR
€ 0.00

OPTION YR 2

SECTION BSCHEDULE OF SERVICES AND RATES PLAYGROUNDS
OPTION YEAR 2
LINE
ITEMDESCRIPTIONEST
QTYU/IUnit PriceTotal Price
0001Maintenance, Inspection, and Safety Services
IAW Section C, Paragraph C.1.6.1.8
0001AALabor -Project Manager200HR€ 0.00€ 0.00
0001AALabor - Laborer1200HR€ 0.00€ 0.00
0001AALabor - Tractor / Lift Operator800HR€ 0.00€ 0.00
0001ABFall Material HIC test and report50EA€ 0.00€ 0.00
0001ACPreventive Maintenance and Inspection. The Contractor shall identify any quantity discounts (for example if we order over 400 services there is a 10% reduction).650EA€ 0.00€ 0.00

0001 AD Annual Safety Audits 300 EA € 0.00 € 0.00

TOTAL COST (0001AA-AD) € 0.00

0002RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0002AACost per centimeter layer500SM€ 0.00€ 0.00
0002

AGM: AGM:

What is the difference between AB and AC?

ABPoured in Place under 5cm(IAW ASTM and pass HIC Test)500SM€ 0.00€ 0.00
0002ACPoured in Place over 5cm (IAW ASTM and pass HIC Test)1000SM€ 0.00€ 0.00
0002ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0002AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0002AA-AE)€ 0.00
0003RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13
0003AACost per centimeter layer500SM€ 0.00€ 0.00
0003ABRubber Tiles (min. 5cm thick)500SM€ 0.00€ 0.00
0003ACRubber Tiles (min. 7cm thick)1000SM€ 0.00€ 0.00
0003ADArtificial Grass IAW C.6.2.141000SM€ 0.00€ 0.00
0003AEWood Fiber500CM€ 0.00€ 0.00
TOTAL COST (0003AA-AE)€ 0.00
C-0004DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
Delivery and installation of resilient surface system IAW Section C.6.2.4
C-0004AAGravel3000M3€ 0.00€ 0.00
C-0004ABSand1000M3€ 0.00€ 0.00
C-0004ACRe-compact and level base after equipment installation10000SM€ 0.00€ 0.00
TOTAL COST (0004AA-AC)€ 0.00
MISCELLANEOUS WORK DESCRIPTION
C-0005Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.138000LM€ 0.00€ 0.00
C-0006Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.105500LM€ 0.00€ 0.00
C-0007Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.125000SM€ 0.00€ 0.00
C-0008Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6250CM€ 0.00€ 0.00
C-0009Furnish and install reinforced concrete (B25), IAW Section C.6.2.9150CM€ 0.00€ 0.00
C-0010Remove and stockpile topsoil on site, IAW Section 023001000CM€ 0.00€ 0.00
C-0011Furnish and install unreinforced concrete (B25), IAW Section C.6.2.91000CM€ 0.00€ 0.00
C-0012Soil excavation, machine: class 3-5, IAW Section 023003000CM€ 0.00€ 0.00
C-0013Backfill trenches, IAW Section 02300250CM€ 0.00€ 0.00
C-0014Install and connect drain/seepage lines, IAW Section C.6.2.6250LM€ 0.00€ 0.00
C-0015Furnish and install trench\gutter draiange IAW C.6.2.6.125LM€ 0.00€ 0.00
C-0016Install bituminous surface material, IAW Section C.6.2.81000CM€ 0.00€ 0.00
C-0017Clean-up IAW Section C.6.2.165000SM€ 0.00€ 0.00
C-0018Safety fence, delivered and installed, IAW Section C.6.2.13.15000LM€ 0.00€ 0.00
C-0019Locate existing utility lines, IAW Section 023005000SM€ 0.00€ 0.00
C-0020Soil excavation, by hand: class 3-5, IAW Section 02300500CM€ 0.00€ 0.00
C-0021Furnish and place topsoil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0022Furnish and place sub-grade soil IAW C.6.2.5.31000CM€ 0.00€ 0.00
C-0023Furnish and install rolled sod IAW C.6.2.5.51000SM€ 0.00€ 0.00
C-0024Furnish and install geotextile seperation layer IAW C.6.2.5.61000SM€ 0.00€ 0.00
C-0025Furnish and install biodegradable type erosion control material IAW C.6.2.5.71000SM€ 0.00€ 0.00
C-0026Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8400HR€ 0.00€ 0.00
C-0027Painting IAW C.6.2.5.91000SM€ 0.00€ 0.00
C-0028Water Line IAW C.6.2.6.21000LM€ 0.00€ 0.00
TOTAL COST (0005-0028)€ 0.00
DELIVERY AND INSTALLATION OF FENCING
Delivery and installation of resilient surface system IAW Section 02821
C-0029AAWelded bar fence IAW C.6.2.13.31500SM€ 0.00€ 0.00
C-0029ABChain Link Fence IAW C.6.2.13.4400SM€ 0.00€ 0.00
C-0029ACWooden fence IAW C.6.2.13.2100SM€ 0.00€ 0.00
C-0029ADRound Fence Post IAW C.6.2.13.5100M€ 0.00€ 0.00
C-0029AESquare/Rect. Fence Post IAW C.6.2.13.5500M€ 0.00€ 0.00
C-0029AFWooden fence post IAW C.6.2.13.2.150M€ 0.00€ 0.00
C-0029AGConcrete Foundation IAW C.6.2.13.6300CM€ 0.00€ 0.00
C-0029AHChain Link fence Gate IAW C.6.2.13.740SM€ 0.00€ 0.00
C-0029AIWelded bar fence Gate IAW C.6.2.13.7200SM€ 0.00€ 0.00
C-0029AJWooden fence Gate IAW C.6.2.13.710SM€ 0.00€ 0.00
C-0029AKReplace hardware IAW C.6.2.13.850EA€ 0.00€ 0.00
TOTAL COST (0029AA-AK)€ 0.00
DEMOLITION
IAW Section 02 41 00
C-0030AARemove and dispose of fence post500EA€ 0.00€ 0.00
C-0030ABRemove and dispose of fence material1000SM€ 0.00€ 0.00
C-0030ACRemove and dispose of post foundation300CM€ 0.00€ 0.00
C-0030ADRemove and dispose of old plastic Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AERemove and dispose of old wooden Equipment including connection mat.1000CM€ 0.00€ 0.00
C-0030AFRemove and dispose of old metal Equipment including connection mat.300CM€ 0.00€ 0.00
C-0030AGRemove and dispose of earth1000CM€ 0.00€ 0.00
C-0030AHRemove and dispose of bituminous mat.200CM€ 0.00€ 0.00
C-0030AIRemove and dispose of reinforced concrete400CM€ 0.00€ 0.00
C-0030AJRemove and dispose of unreinforced concrete500CM€ 0.00€ 0.00
C-0030AKRemove and dispose of concrete pavers1600SM€ 0.00€ 0.00
C-0030ALRemove and dispose of rubberized fall material1000CM€ 0.00€ 0.00
C-0030AMRemove and dispose of artificial grass fall material100CM€ 0.00€ 0.00
C-0030ANRemove and dispose of wood fiber fall material200CM€ 0.00€ 0.00
TOTAL COST (0030AA-AN)€ 0.00
COSTS FOR TRANSPORTATION, LODGING, MEALS, AND INCIDENTAL EXPENSES
For Travel Costs see FAR 31.205-46, Section B, and C.5.3.8
0031All allowable costs IAW FAR 31.205-46 and the Joint Travel Requlation, Volume 2, DoD Civilian Personnel, Appendix A in effect at the time of this contract. The Contractor shall provide a breakout of all travel costs. This CLIN shall not be priced by the Contractor. The Government will insert a Not-To-Exceed amount at time of award.Not Entered by Contractor

TOTAL COST (0031)

EQUIPMENT PRICING SCHEDULE
IAW Section H, B, and C.5
Attach the Equipment Pricing Schedule for the OPTION YEAR 2

0032 AA Equipment Total Price in Euro. € 0.00

DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
IAW Section B and C.5
0033Cost applied to equipment price per individual task order, excluding shipping and handling (example 23.5%)%
TOTAL BASE YEAR
€ 0.00

SUM

Base Period, Option 1, Option 2
Bottom Line Sum Base Year 1€ - 0
Bottom Line Sum Base Year 2€ - 0
Bottom Line Sum Base Year 3€ - 0
Bottom Line Sum Option Year 1€ - 0
Bottom Line Sum Option Year 2€ - 0
Total Bottom Line Sum€ - 0

File details come from the government source that posted it. Updated .