Bid Abstract W912ES23B0004 NESP Island 4 project.pdf

PDF 161 KB Posted

Attached to
NESP Navigation Systemic Mitigation Island 4 / Pool 4
Solicitation number
W912ES23B0004
Issued by

About this file

This bid abstract summarizes a solicitation for construction services on NESP Island 4 in Pool 4 of the Mississippi River. The selected contractor will construct the island using granular fill from channel dredging and fine fill from access and habitat dredging. Riprap will be placed along the shoreline and obtained from approved off-site sources. The contractor must also plant willow cuttings, establish turf, and perform related erosion control work. Bids were due on June 2, 2023 to the U.S. Army Corps of Engineers district office in St. Paul, Minnesota. Four contractors submitted bids ranging from $8,654,530 to $13,635,546.40. The government estimate was $8,951,400. Award is pending.

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
REFERENCE W912ES23B0004 .pdf PDF
SPECS W912ES23B0004 .pdf PDF
PLANS W912ES23B0004 .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NESP Island 4 Project Solicitation W912ES23B0004 U.S. Army Corps of Engineers, 332 Minnesota Street, Suite E1500 Bid Opening: June 2, 2023 @ 2:00 p.m.

St. Paul, MN 55101-1323

Contracting Officer: Kevin P. Henricks Contract Specialist: Justin H. Rose

BASE

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 0001 Bonds (Performance and Payment) 1 JOB $113,762.00 $113,762.00 $80,000.00 $80,000.00 $75,450.00 $75,450.00 $290,888.00 $290,888.00 0002 Granular Fill

0002AA First 138,000 CY 138,000 CY $43.60 $6,016,800.00 $31.40 $4,333,200.00 $28.50 $3,933,000.00 $49.66 $6,853,080.00 0002AB Over 138,000 CY 35,000 CY $43.60 $1,526,000.00 $31.40 $1,099,000.00 $25.50 $892,500.00 $15.12 $529,200.00

0003 Fine Fill - Dry 0003AA First 44,000 CY 44,000 CY $51.40 $2,261,600.00 $44.80 $1,971,200.00 $56.50 $2,486,000.00 $104.24 $4,586,560.00 0003AB Over 44,000 CY 11,000 CY $51.40 $565,400.00 $44.80 $492,800.00 $51.50 $566,500.00 $30.05 $330,550.00

0004 R45 Riprap 0004AA First 760 Tons 760 TN $124.40 $94,544.00 $83.00 $63,080.00 $105.00 $79,800.00 $123.29 $93,700.40 0004AB Over 760 Tons 90 TN $124.40 $11,196.00 $83.00 $7,470.00 $105.00 $9,450.00 $50.00 $4,500.00

0005 R140 Riprap 0005AA First 5,100 Tons 5,100 TN $124.40 $634,440.00 $83.00 $423,300.00 $115.00 $586,500.00 $114.13 $582,063.00 0005AB Over 5,100 Tons 560 TN $124.40 $69,664.00 $83.00 $46,480.00 $105.00 $58,800.00 $50.00 $28,000.00

0006 Turf Establishment 15 AC $9,010.00 $135,150.00 $6,000.00 $90,000.00 $12,760.00 $191,400.00 $18,307.00 $274,605.00 0007 Willows 8,000 EA $8.00 $64,000.00 $6.00 $48,000.00 $9.00 $72,000.00 $7.80 $62,400.00

$11,492,556.00 $8,654,530.00 $8,951,400.00 $13,635,546.40

I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

Kevin P. Henricks Contracting Officer

Unit price extension errors resulting in a different bid amount than read at the bid opening. Total bid amount read was $8,947,400.00

Government Estimate

Panacea Construction Group LLC

30 Pinion Court Dubois, WY 82513

LS Marine, Inc.

6010 Concord Blvd

Inver Grove Heights, MN 55076

TOTAL BID AMOUNT

Dubuque Barge and Fleeting Services dba Newt Marine Services

5 Jones St Dubuque, IA 52001

Sheet1

2023-06-02T17:21:10-0500
HENRICKS.KEVIN.PHILIP.1249726873

File details come from the government source that posted it. Updated .