W912ES20B0015 Bass Ponds Abstract.pdf

PDF 459 KB Posted

Attached to
Bass Ponds Habitat Construction Project
Solicitation number
W912ES20B0015
Issued by

About this file

This document summarizes bids received for the Bass Ponds Habitat Construction Project solicitation. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District St Paul for construction of habitat rehabilitation and enhancement projects at Bass Ponds, Marsh and Wetland in Scott County, Minnesota. The project features are located within the Minnesota Valley National Wildlife Refuge. The work includes removals, access road maintenance, topsoil and seeding restoration, grading, structures, excavation and road work. Four contractors submitted bids by the 14 May 2020 deadline ranging from $3.3 million to $5 million. The apparent low bid was from S.M. Hentges & Sons for $3.3 million. An option for additional work was also included with bids ranging from $1.7 million to $6.3 million. The estimated value of construction was between $5-10 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bass Ponds HREP Construction Solicitation W912ES20B0015

US Army Corps of Engineers. 180 5th Street East, Suite 700, St. Paul, MN 55101-1678 Bid Opening: 14 May 2020 @ 2:00 p.m. Central

Contracting Officer: Kevin P. Henricks Contract Specialist: Toni W. Wasgatt

BASE

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 0001 Performance Payment Bonds 1 JOB $45,650.00 $45,650.00 $24,000.00 $24,000.00 $25,300.00 $25,300.00 $28,789.00 $28,789.00 0002 Removals 1 JOB $109,590.00 $109,590.00 $31,500.00 $31,500.00 $40,345.00 $40,345.00 $93,547.00 $93,547.00 0003 Access Road Maintenance 1 JOB $1,641,480.00 $1,641,480.00 $90,000.00 $90,000.00 $61,345.00 $61,345.00 $697,334.00 $697,334.00 0004 Topsoil, Native Seeding, and Restoration 1 JOB $111,445.00 $111,445.00 $130,000.00 $130,000.00 $215,665.00 $215,665.00 $142,903.00 $142,903.00 0005 Grading for Riprap and Bedding 1 JOB $173,675.00 $173,675.00 $120,000.00 $120,000.00 $530,725.00 $530,725.00 $515,100.00 $515,100.00 0006 Berm Construction/Repair 1 JOB $15,782.00 $15,782.00 $10,000.00 $10,000.00 $10,010.00 $10,010.00 $2,652.00 $2,652.00 0007 Concrete Pad 1 JOB $16,830.00 $16,830.00 $25,000.00 $25,000.00 $26,800.00 $26,800.00 $24,335.00 $24,335.00 0008 2-Bay WLM Structure 1 EA $365,955.00 $365,955.00 $552,000.00 $552,000.00 $343,340.00 $343,340.00 $580,329.00 $580,329.00 0009 1-Bay WLM Structure 3 EA $280,871.00 $842,613.00 $454,000.00 $1,362,000.00 $217,790.00 $653,370.00 $361,743.00 $1,085,229.00 0010 Access Road Excavation

0010AA First 2485 CY 2,485 CY $12.34 $30,664.90 $27.00 $67,095.00 $31.35 $77,904.75 $5.60 $13,916.00 0010AB Over 2485 CY 1,340 CY $12.34 $16,535.60 $27.00 $36,180.00 $31.30 $41,942.00 $5.60 $7,504.00

0011 Access Road Aggregate 0011AA First 3,730 Tons 3,730 TN $30.26 $112,869.80 $21.00 $78,330.00 $23.85 $88,960.50 $34.50 $128,685.00 0011AB Over 3,730 Tons 2,010 TN $30.26 $60,822.60 $21.00 $42,210.00 $23.85 $47,938.50 $34.00 $68,340.00

0012 Geotextile for Riprap and Bedding 0012AA First 5,055 SY 5,055 SY $9.63 $48,679.65 $3.00 $15,165.00 $3.05 $15,417.75 $2.00 $10,110.00 0012AB Over 5,055 SY 2,725 SY $9.63 $26,241.75 $3.00 $8,175.00 $3.00 $8,175.00 $1.00 $2,725.00

0013 Bedding 0013AA First 1,885 Tons 1,885 TN $67.58 $127,388.30 $35.00 $65,975.00 $58.75 $110,743.75 $60.00 $113,100.00 0013AB Over 1,885 Tons 1,015 TN $67.58 $68,593.70 $35.00 $35,525.00 $58.75 $59,631.25 $60.00 $60,900.00

0014 Riprap 0014AA First 4,095 Tons 4,095 TN $90.17 $369,246.15 $56.00 $229,320.00 $56.15 $229,934.25 $85.00 $348,075.00 0014AB Over 4,095 Tons 2,205 TN $90.17 $198,824.85 $56.00 $123,480.00 $56.00 $123,480.00 $69.50 $153,247.50

0015 Channel Excavation 0015AA First 5,650 CY 5,650 CY $24.73 $139,724.50 $30.00 $169,500.00 $86.50 $488,725.00 $117.00 $661,050.00 0015AB Over 5,650 CY 3,750 CY $23.46 $87,975.00 $27.00 $101,250.00 $74.70 $280,125.00 $70.25 $263,437.50

$4,610,586.80 $3,316,705.00 $3,479,877.75 $5,001,308.00

Meyer Contracting, Inc.

TOTAL BASE BID

S.M. Hentges & Sons Veit & Company, Inc.Government Estimate

OPTION 1 Continental Grain Marsh Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1001 Performance and Payment Bonds 1 JOB $16,698.00 $16,698.00 $1,000.00 $1,000.00 $11,825.00 $11,825.00 $7,977.00 $7,977.00 1002 Removals 1 JOB $25,849.00 $25,849.00 $12,800.00 $12,800.00 $44,680.00 $44,680.00 $22,595.00 $22,595.00 1003 Access Road Maintenance 1 JOB $712,278.00 $712,278.00 $14,500.00 $14,500.00 $50,585.00 $50,585.00 $154,943.00 $154,943.00 1004 Topsoil, Native Seeding, and Restoration 1 JOB $36,004.00 $36,004.00 $42,000.00 $42,000.00 $94,150.00 $94,150.00 $43,705.00 $43,705.00 1005 Grading for Riprap and Bedding 1 JOB $42,668.00 $42,668.00 $37,000.00 $37,000.00 $151,475.00 $151,475.00 $145,676.00 $145,676.00 1006 Ditch Plug A 1 JOB $25,826.00 $25,826.00 $6,000.00 $6,000.00 $8,440.00 $8,440.00 $14,157.00 $14,157.00 1007 Ditch Plug B 1 JOB $29,545.00 $29,545.00 $6,000.00 $6,000.00 $32,450.00 $32,450.00 $8,284.00 $8,284.00 1008 1-Bay WLM Structure 1 EA $280,871.00 $280,871.00 $288,000.00 $288,000.00 $224,745.00 $224,745.00 $328,388.00 $328,388.00 1009 Access Road Excavation

1009AA First 980 CY 980 CY $12.34 $12,093.20 $27.00 $26,460.00 $32.15 $31,507.00 $26.00 $25,480.00 1009AB Over 980 CY 525 CY $12.34 $6,478.50 $27.00 $14,175.00 $32.00 $16,800.00 $26.00 $13,650.00

1010 Access Road Aggregate 1010AA First 1,470 Tons 1,470 TN $30.26 $44,482.20 $20.00 $29,400.00 $23.20 $34,104.00 $28.25 $41,527.50 1010AB Over 1,470 Tons 790 TN $30.26 $23,905.40 $20.00 $15,800.00 $23.20 $18,328.00 $28.25 $22,317.50

1011 Geotextile for Riprap and Bedding 1011AA First 1,900 SY 1,900 SY $9.63 $18,297.00 $3.00 $5,700.00 $3.10 $5,890.00 $1.70 $3,230.00 1011AB Over 1,900 SY 1,030 SY $9.63 $9,918.90 $3.00 $3,090.00 $3.10 $3,193.00 $1.70 $1,751.00

1012 Bedding 1012AA First 715 Tons 715 TN $67.58 $48,319.70 $34.00 $24,310.00 $59.80 $42,757.00 $50.75 $36,286.25 1012AB Over 715 Tons 385 TN $67.58 $26,018.30 $34.00 $13,090.00 $59.75 $23,003.75 $50.75 $19,538.75

1013 Riprap 1013AA First 1,500 Tons 1,500 TN $90.17 $135,255.00 $55.00 $82,500.00 $56.95 $85,425.00 $73.00 $109,500.00 1013AB Over 1,500 Tons 800 TN $90.17 $72,136.00 $55.00 $44,000.00 $56.90 $45,520.00 $58.75 $47,000.00

1014 Channel Excavation 1014AA First 2,800 CY 2,800 CY $24.31 $68,068.00 $28.00 $78,400.00 $87.10 $243,880.00 $89.50 $250,600.00 1014AB Over 2,800 CY 1,850 CY $23.46 $43,401.00 $27.00 $49,950.00 $75.35 $139,397.50 $62.25 $115,162.50

1015 Pre and Post Construction Condition Survey 1 EA $8,408.00 $8,408.00 $9,000.00 $9,000.00 $36,230.00 $36,230.00 $8,898.00 $8,898.00 $1,686,520.20 $803,175.00 $1,344,385.25 $1,420,666.50

$6,297,107.00 $4,119,880.00 $4,824,263.00 $6,421,974.50

Clerical error identified in the bid from Meyer Contracting on line 0012AB. Total price is actually $6,421,974.50.

Total bid for Veit incorrectly read at bid opening as $4,854,263 but should have been $4,824,263.

I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

Kevin P. Henricks Contracting Officer

TOTAL BID AMOUNT - BASE AND OPTIONS

TOTAL OPTION 1

2020-05-14T18:19:39-0500
HENRICKS.KEVIN.PHILIP.1249726873

File details come from the government source that posted it. Updated .