Attachment_A_part2.pdf
PDF 12 MB Posted
- Solicitation number
- W912ES19T0034
About this file
Attachment A (Part 2 of 2) - Maps and Site Information
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1_-_Revised_Attachment_A.pdf | ||
| W912ES19T0034_0001_-_Amendment_1.pdf | ||
| Attachment_C_-_W912ES19T0034.pdf | ||
| ATTACHMENT_B_-_W912ES19T0034.doc | DOC document | |
| Attachment_A_part1.pdf | ||
| W912ES19T0034_RFQ_for_Herbicide_Application.pdf | ||
| Site_Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Legend Brush Control 29.4 acres Total Kill 30.9 acres
¹ 0 490245 Feet
Lock and Dam 5 - Herbicide Application Contract Site Map
See inset below
Inset
Upstream
Downstream
Upstream Downstream 6/2013
Notes:
Site 1 - Rip rap behind lower guide wall.
Site 2 - Rip rap from trees to piling.
Site 3 - Loading dock, staging area, and parking lot.
Site 4 - Storage yard on WI side.
Site 5 - Rip rap around the point below dam on WI side.
Total Kill Road
Total Kill 3.09 acres¹
Notes:
Site 1 - Upstream yard area and around upper building Site 2 - Rip rap along shoreline from water's edge to gravel Site 3 - Front entrance way Site 4 - Rip rap along rail road tracks Site 5 - 4 to 5 ft. apron around building
Fountain City Service Base - Herbicide Application Contract Site Map
0 140 280 420 Ft.
06/2013
Upstream Downstream
Brush Control 38.6 acres Spot Treatment 1.2 acres Total Kill 22.2 acres
Lock and Dam 5A, Dike - Herbicide Application Contract Site
0 1,100 2,200 Ft.
¹
See Inset for illustration
Inset
Downstream
Upstream
06/2013
Notes:
Site 1 - Approximately 15' from rip rap toe on downstream side of dike to top secondary dike - brush control Site 2 - Rip rap toe on downstream side of dike - total kill Site 3 - Downstream side of dike - brush control Site 4 - Upstream side of dike - total kill Site 5 - 10 ft' from rip rap on upstream side of dike - brush control Site 6 - 10 ft' from rip rap toe on downstream side of dike - brush control Site 7 - Rip rap toe on downstream side of dike - total kill Site 8 - Downstream side of dike - brush control Site 9 - Upstream side of dike - total kill
Rip rap toe
Upstream Downstream
Lock and Dam 5A - Herbicide Application Contract Site
0 640 1,280 Ft.
¹
See Inset
Inset
Downstream
Upstream
1 2
Notes:
Site 1 - Rip rap dike along island upstream of lock to 1200' marker Site 2 - Rip rap upstream of dam Site 3 - Fenceline around small storage building Site 4 - Open area between storage shed and railroad tracks - pockets of leafy spurge Site 5 - Apron around large storage building Site 6 - Hillside along access road - pockets of leafy spurge
Legend
Total Kill 22.2 acres Spot Treatment 1.2 acres Brush Control 38.6 acres
Rip rap behind upper wall and along building
Total kill
Lock and Dam 6 Herbicide Application
Contract Site Map
Legend Treatment
Brush Control 2.77 acres Total Kill 4.2 acres
¹ 0 290 580 870 Ft.
Upstream
Downstream
Area between pond and bike trail shoulder
Along both sides of entrance road and trail
Total kill
See inset 1 for cross section of dike
See inset 1 inset 1
Inset 1
Upstream Downstream
Rip Rap adjacent to marina
Dresbach, MN Repeater Site
Tower
Dresbach Repeater Site
Total Kill within fence, driveway and anchor points
Upstream
Downstream
Legend Brush Control 13 acres Total Kill 11.6 acres
¹ 0 190 380 570 Ft.
Lock and Dam 7, Main - Herbicide Application Contract Site Map
06/2013
Notes:
Site 1 - Rip rap opposite upper wall Site 2 - Hillside south of security fence Site 3 - Rip rap along road Site 4 - Rip rap and loading dock area Site 5 - Rip rap along parking lot Site 6 - Storage yard
Downstream
Legend Brush Control 13 acres Total Kill 11.6 acres ¹0 580 1,160 1,740 Ft.
Lock and Dam 7, Main Embankment - Herbicide Application Contract Site Map
See Inset
Inset
Upstream DownstreamTotal kill
06/2013
1 2
3 4 5 6
Notes:
Site 1 - Storage yard Site 2 - Rip rap below dam Site 3 - Area 10' from bottom of rip rap on downstream Site 4 - Rip rap toe on downstream Site 5 - Downstream side of dike Site 6 - Gravel road\upstream side of dike and spillway areas Site 7 - See separate conditions for this area
See Inset 6 5 34
Lock and Dam 8 - Herbicide Application Contract Site Map
Downstream
Legend Brush Control 18.2 acres Total Kill 26.5 acres
Upstream Downstream Total Kill
Inset¹ 0 210 420 630 Ft.
06/2013
See insert for illustration
Note:
Site 1 - From bottom of rip rap toe on downstream side - brush control Site 2 - Rip rap toe on downstream side - total kill Site 3 - Downstream side of dike - brush control Site 4 - Gravel road - total kill Site 5 - Upstream side of dike - total kill Site 6 - Maintenance area and turnaround - total kill Site 7 - Rock areas behind upper wall - total kill Site 8 - Lower beach - rip rap at lower end of guidewall - total kill 8
Lock and Dam 8, Dike - Herbicide Application Contract Site Map
Downstream
Legend Treatment
Brush Control Total Kill
Upstream Downstream Total Kill
Inset
¹
0 870 1,740 2,610 Ft.
06/2013
See insert for illustration
7Note:
Site 1 - Spillway - total kill when conditions allow Site 2 - From bottom of rip rap toe on downstream side of dike to fenceposts - brush control Site 3 - Rip rap toe - total kill Site 4 - Downstream side of dike - brush control Site 5 - Gravel road - total kill Site 6 - Upstream side of dike - total kill Site 7 - Spill way - total kill when conditions allow
Tower
Lynxville, WI Repeater Site
Lynxville Repeater Site
Total kill within fence, apron around the fence, driveway and cable anchor points
Broadleaf control 0.5 acres Brush Control 12.4 acres Total Kill 21.0 acres
Lock and Dam 9 - Herbicide Application Contract Site Map
4 5
¹ 0 340 680 1,020 Ft. 06/2013
Site 1 - Maintenance yard and rip rap below dam - total kill Site 2 - Rip rap area behind garage - total kill Site 3 - All rock behind upper wall - total kill Site 4 - Spot spray around distance signs along railroad tracks - total kill Site 5 - Along slough on east side of entrance road - broadleaf control
Notes:
Brush Control Total Kill
Lock and Dam 9, Dike - Herbicide Application Contract Site Map
Notes:
Site 1 - From bottom of rip rap on downstream side of dike to marked fenceposts- brush control Site 2 - Rip rap on downstream side of dike - total kill Site 3 - Spillway, when conditions allow - total kill Site 4 - Downstream side of dike - brush control Site 5 - Upstream side of dike/gravel road - total kill Site 6 - 10' from bottom of rip rap on upstream side of dike - brush control
¹
0 700 1,400 2,100 Ft.
Total Kill
6/2013
Lock and Dam 10 - Herbicide Application Contract Site Map
Legend Brush Control 4.04 acres Total Kill 8.54 acres
Notes:
Site 1 - Rip rap behind upper wall to fence post - total kill Site 2 - Gravel maintenance area - total kill Site 3 - 10' down from rip rap toe on downstream side of dike - brush control Site 4 - Rip rap toe on downstream side - total kill Site 5 - Downstream side of dike - brush control Site 6 - Gravel road\upstream side of dike - total kill Site 7 - 10 feet from bottom of rip rap on upstream side of dike - total kill Site 8 - Area between RR tracks and cement wall abutting WI spillway - total kill
Total Kill Upstream Downstream
See Inset for diagram
Inset
¹ 0 510 1,020 1,530 Ft.
1 2
6 7
Notes:
Site 1 - Emergency spillway rock wall and area up to road Site 2 - Emergency spillway rock wall and area up to road Site 3 - Concrete drainageway Site 4 - Rip rap ditch connecting to drainageway Site 5 - Downstream side of dam Site 6 - Rip rap upstream of weir Site 7 - Rip rap upstream of weir Site 8 - Stilling basin area Site 9 - Rip rap upstream of dam
Legend Brush control 8.9 acres Total kill 10.6 acres
Eau Galle Dam - Herbicide Contract Site Map
0 350 700175 Feet
¹
| herbicide contract mapset |
| vicinity map |
| SAF_2013_JB |
| LSAF_2013_JB |
| Lock_and_Dam1_2013_JB |
| Pool 2_JB |
| Lock and Dam 3 Entrance Road_JB |
| Lock and Dam 3 RM |
| Lock and Dam 3 Entrance Road ii_JB |
| L&D3south |
| Bay City repeater |
| Alma Marina Placement_JB |
| Lock and Dam 4_JB |
| Alma Repeater general Location_JB |
| Alma Repeater Site |
| Contrt_5Dike_JB |
| Lock and Dam 5_JB |
| Fountain City Service Base_JB |
| Lock and Dam 5A dike_JB |
| Lock and Dam 5A_JB |
| Lock and dam 6_RPM |
| Dresbach repeater |
| Lock and Dam 7 Main_JB |
| Lock and Dam 7 Main embankment_RPM |
| Lock and Dam 8_JB |
| Lock and Dam 8 Dike_JB |
| Lynxville repeater |
| lock_and_dam9_JB |
| lock and dam 9 dike_JB |
| Loack and Dam 10_JB |
| Eau Galle |