Attachment_A_part2.pdf

PDF 12 MB Posted

Attached to
Herbicide Application at 17 Upper Mississippi River Sites
Solicitation number
W912ES19T0034
Issued by

About this file

Attachment A (Part 2 of 2) - Maps and Site Information

View the file

Other files

File Type Posted
Amendment_1_-_Revised_Attachment_A.pdf PDF
W912ES19T0034_0001_-_Amendment_1.pdf PDF
Attachment_C_-_W912ES19T0034.pdf PDF
ATTACHMENT_B_-_W912ES19T0034.doc DOC document
Attachment_A_part1.pdf PDF
W912ES19T0034_RFQ_for_Herbicide_Application.pdf PDF
Site_Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Legend Brush Control 29.4 acres Total Kill 30.9 acres

¹ 0 490245 Feet

Lock and Dam 5 - Herbicide Application Contract Site Map

See inset below

Inset

Upstream

Downstream

Upstream Downstream 6/2013

Notes:

Site 1 - Rip rap behind lower guide wall.

Site 2 - Rip rap from trees to piling.

Site 3 - Loading dock, staging area, and parking lot.

Site 4 - Storage yard on WI side.

Site 5 - Rip rap around the point below dam on WI side.

Total Kill Road

Total Kill 3.09 acres¹

Notes:

Site 1 - Upstream yard area and around upper building Site 2 - Rip rap along shoreline from water's edge to gravel Site 3 - Front entrance way Site 4 - Rip rap along rail road tracks Site 5 - 4 to 5 ft. apron around building

Fountain City Service Base - Herbicide Application Contract Site Map

0 140 280 420 Ft.

06/2013

Upstream Downstream

Brush Control 38.6 acres Spot Treatment 1.2 acres Total Kill 22.2 acres

Lock and Dam 5A, Dike - Herbicide Application Contract Site

0 1,100 2,200 Ft.

¹

See Inset for illustration

Inset

Downstream

Upstream

06/2013

Notes:

Site 1 - Approximately 15' from rip rap toe on downstream side of dike to top secondary dike - brush control Site 2 - Rip rap toe on downstream side of dike - total kill Site 3 - Downstream side of dike - brush control Site 4 - Upstream side of dike - total kill Site 5 - 10 ft' from rip rap on upstream side of dike - brush control Site 6 - 10 ft' from rip rap toe on downstream side of dike - brush control Site 7 - Rip rap toe on downstream side of dike - total kill Site 8 - Downstream side of dike - brush control Site 9 - Upstream side of dike - total kill

Rip rap toe

Upstream Downstream

Lock and Dam 5A - Herbicide Application Contract Site

0 640 1,280 Ft.

¹

See Inset

Inset

Downstream

Upstream

1 2

Notes:

Site 1 - Rip rap dike along island upstream of lock to 1200' marker Site 2 - Rip rap upstream of dam Site 3 - Fenceline around small storage building Site 4 - Open area between storage shed and railroad tracks - pockets of leafy spurge Site 5 - Apron around large storage building Site 6 - Hillside along access road - pockets of leafy spurge

Legend

Total Kill 22.2 acres Spot Treatment 1.2 acres Brush Control 38.6 acres

Rip rap behind upper wall and along building

Total kill

Lock and Dam 6 Herbicide Application

Contract Site Map

Legend Treatment

Brush Control 2.77 acres Total Kill 4.2 acres

¹ 0 290 580 870 Ft.

Upstream

Downstream

Area between pond and bike trail shoulder

Along both sides of entrance road and trail

Total kill

See inset 1 for cross section of dike

See inset 1 inset 1

Inset 1

Upstream Downstream

Rip Rap adjacent to marina

Dresbach, MN Repeater Site

Tower

Dresbach Repeater Site

Total Kill within fence, driveway and anchor points

Upstream

Downstream

Legend Brush Control 13 acres Total Kill 11.6 acres

¹ 0 190 380 570 Ft.

Lock and Dam 7, Main - Herbicide Application Contract Site Map

06/2013

Notes:

Site 1 - Rip rap opposite upper wall Site 2 - Hillside south of security fence Site 3 - Rip rap along road Site 4 - Rip rap and loading dock area Site 5 - Rip rap along parking lot Site 6 - Storage yard

Downstream

Legend Brush Control 13 acres Total Kill 11.6 acres ¹0 580 1,160 1,740 Ft.

Lock and Dam 7, Main Embankment - Herbicide Application Contract Site Map

See Inset

Inset

Upstream DownstreamTotal kill

06/2013

1 2

3 4 5 6

Notes:

Site 1 - Storage yard Site 2 - Rip rap below dam Site 3 - Area 10' from bottom of rip rap on downstream Site 4 - Rip rap toe on downstream Site 5 - Downstream side of dike Site 6 - Gravel road\upstream side of dike and spillway areas Site 7 - See separate conditions for this area

See Inset 6 5 34

Lock and Dam 8 - Herbicide Application Contract Site Map

Downstream

Legend Brush Control 18.2 acres Total Kill 26.5 acres

Upstream Downstream Total Kill

Inset¹ 0 210 420 630 Ft.

06/2013

See insert for illustration

Note:

Site 1 - From bottom of rip rap toe on downstream side - brush control Site 2 - Rip rap toe on downstream side - total kill Site 3 - Downstream side of dike - brush control Site 4 - Gravel road - total kill Site 5 - Upstream side of dike - total kill Site 6 - Maintenance area and turnaround - total kill Site 7 - Rock areas behind upper wall - total kill Site 8 - Lower beach - rip rap at lower end of guidewall - total kill 8

Lock and Dam 8, Dike - Herbicide Application Contract Site Map

Downstream

Legend Treatment

Brush Control Total Kill

Upstream Downstream Total Kill

Inset

¹

0 870 1,740 2,610 Ft.

06/2013

See insert for illustration

7Note:

Site 1 - Spillway - total kill when conditions allow Site 2 - From bottom of rip rap toe on downstream side of dike to fenceposts - brush control Site 3 - Rip rap toe - total kill Site 4 - Downstream side of dike - brush control Site 5 - Gravel road - total kill Site 6 - Upstream side of dike - total kill Site 7 - Spill way - total kill when conditions allow

Tower

Lynxville, WI Repeater Site

Lynxville Repeater Site

Total kill within fence, apron around the fence, driveway and cable anchor points

Broadleaf control 0.5 acres Brush Control 12.4 acres Total Kill 21.0 acres

Lock and Dam 9 - Herbicide Application Contract Site Map

4 5

¹ 0 340 680 1,020 Ft. 06/2013

Site 1 - Maintenance yard and rip rap below dam - total kill Site 2 - Rip rap area behind garage - total kill Site 3 - All rock behind upper wall - total kill Site 4 - Spot spray around distance signs along railroad tracks - total kill Site 5 - Along slough on east side of entrance road - broadleaf control

Notes:

Brush Control Total Kill

Lock and Dam 9, Dike - Herbicide Application Contract Site Map

Notes:

Site 1 - From bottom of rip rap on downstream side of dike to marked fenceposts- brush control Site 2 - Rip rap on downstream side of dike - total kill Site 3 - Spillway, when conditions allow - total kill Site 4 - Downstream side of dike - brush control Site 5 - Upstream side of dike/gravel road - total kill Site 6 - 10' from bottom of rip rap on upstream side of dike - brush control

¹

0 700 1,400 2,100 Ft.

Total Kill

6/2013

Lock and Dam 10 - Herbicide Application Contract Site Map

Legend Brush Control 4.04 acres Total Kill 8.54 acres

Notes:

Site 1 - Rip rap behind upper wall to fence post - total kill Site 2 - Gravel maintenance area - total kill Site 3 - 10' down from rip rap toe on downstream side of dike - brush control Site 4 - Rip rap toe on downstream side - total kill Site 5 - Downstream side of dike - brush control Site 6 - Gravel road\upstream side of dike - total kill Site 7 - 10 feet from bottom of rip rap on upstream side of dike - total kill Site 8 - Area between RR tracks and cement wall abutting WI spillway - total kill

Total Kill Upstream Downstream

See Inset for diagram

Inset

¹ 0 510 1,020 1,530 Ft.

1 2

6 7

Notes:

Site 1 - Emergency spillway rock wall and area up to road Site 2 - Emergency spillway rock wall and area up to road Site 3 - Concrete drainageway Site 4 - Rip rap ditch connecting to drainageway Site 5 - Downstream side of dam Site 6 - Rip rap upstream of weir Site 7 - Rip rap upstream of weir Site 8 - Stilling basin area Site 9 - Rip rap upstream of dam

Legend Brush control 8.9 acres Total kill 10.6 acres

Eau Galle Dam - Herbicide Contract Site Map

0 350 700175 Feet

¹

herbicide contract mapset
vicinity map
SAF_2013_JB
LSAF_2013_JB
Lock_and_Dam1_2013_JB
Pool 2_JB
Lock and Dam 3 Entrance Road_JB
Lock and Dam 3 RM
Lock and Dam 3 Entrance Road ii_JB
L&D3south
Bay City repeater
Alma Marina Placement_JB
Lock and Dam 4_JB
Alma Repeater general Location_JB
Alma Repeater Site
Contrt_5Dike_JB
Lock and Dam 5_JB
Fountain City Service Base_JB
Lock and Dam 5A dike_JB
Lock and Dam 5A_JB
Lock and dam 6_RPM
Dresbach repeater
Lock and Dam 7 Main_JB
Lock and Dam 7 Main embankment_RPM
Lock and Dam 8_JB
Lock and Dam 8 Dike_JB
Lynxville repeater
lock_and_dam9_JB
lock and dam 9 dike_JB
Loack and Dam 10_JB
Eau Galle

File details come from the government source that posted it.