Attachment_A_part1.pdf

PDF 13 MB Posted

Attached to
Herbicide Application at 17 Upper Mississippi River Sites
Solicitation number
W912ES19T0034
Issued by

About this file

Attachment A (Part 1 of 2)- Maps and Site Information

View the file

Other files

File Type Posted
Amendment_1_-_Revised_Attachment_A.pdf PDF
W912ES19T0034_0001_-_Amendment_1.pdf PDF
Attachment_C_-_W912ES19T0034.pdf PDF
ATTACHMENT_B_-_W912ES19T0034.doc DOC document
Attachment_A_part2.pdf PDF
W912ES19T0034_RFQ_for_Herbicide_Application.pdf PDF
Site_Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upper St. Anthony's Falls Lock - Herbicide Application Project Site Map

¹ Legend Treatment

Brush Control .28 acres Total Kill 2.1 acres

0 130 260 390 Ft.

Notes:

Site 1 - Between lockwall and falls Site 2 - The rip rap along Mills Ruins park Site 3 - The parking lot Site 4 - The lower yard around bridge pier, spot spray and total kill around shrubs Site 5 - The training dike

Control House

06/2013

2 3 4 5 6

7 8 9

Lower St. Anthony's Falls - Herbicide Application Project Site Map

Notes:

Site 1 - Embankment top to waters edge Site 2 - Shoulder along upper road Site 3 - Area outside of security fence on upstream side of storage yard continuing upstream along rock Site 4 - Storage yard - spray within and around bulkheads Site 5 - All rocked areas from, upstream security fence to downstream road gate.

Site 6 - Small rock area in front of control house Site 7 - Area behind and along fence Site 8 - Rocked areas downstream of road gate Site 9 - Treat areas between cement buttresses up to lower guide wall- as possible in areas above water.

Site10 - Treat small area along inside of fence at base of pier house, approximately 20' long.

Site11 - Along security gate both sides

Legend Total Kill 1.5 acres

0 130 260 390 Ft.

Lock and Dam 1 - Herbicide Application Contract Site Map

Legend Brush Control 0.4 acres Spot treat buckthorn 2.7 acres Total Kill 3.4 acres

Notes:

Site 1 - Rip rap downstream, to end of crib wall.

Site 2 - Vertical face of 100 ft. tall crib wall - spot spray as needed.

Site 3 - River wall, spray from edge to edge.

Site 4 - Lower Guide Wall rip rap - by boat davit.

Site 5 - Within curb between road and crib wall.

Site 6 - Rock Area on (I) Wall.

Site 7 - Rock Area on (I) Wall.

Site 8 - Spot spray brush and trees on river side of security fence on bluff.

Site 9 - Spot spray Buckthorn between road to top of hill.

Site10 - Spot spray roadway, curbs and sidewalk.

Site11 - Spot spray Buckthorn on the bank to the right of the roadway.

0 290 580145 Feet

Brush Control 3.5 acres Total Kill 5.25 acres

¹

0 340 680170 Feet

Lock and Dam 2 - Herbicide Application Contract Site Map Notes:

Site 1 - Upstream side of dike Site 2 - Downstream side of dike Site 3 - Rip rap toe on downstream side of dike Site 4 - Area 10 ft from rip rap toe on downstream side of dike Site 5 - Area 10 ft from rip rap on upstream side of dike Site 6 - Area on western corner of ESC building around big pine trees Site 7 - Storage yard area Site 8 - Shoreline Upstream of control building Site 9 - Shoreline downstream of control building Site 10 - Islands in parking lot Site 11 - Area on south side of visitor walkway around bend to end of rip rap Site 12 - Loading dock area Site 13 & 14 - Upstream piling Site 15 & 16 - Area along south side of first crossover wall to edge of rip rap Site 17 - Bulkhead storage area and 10' out from secuirty fence

5 6

7 8

Upstream

Downstream

Upstream Downstream

(See Inset Below for sites 1-4)

Inset

¹ 0 870 1,740 Ft

Lock and Dam 3 Entrance Road - Herbicide Application Contract Site Map

3 ft. wide shoulder on entrance road Total Kill

Total Kill6/2013

Site 1 – Rip rap on upstream of spot dike A Site 2 – Sandy/grass area around pier house and along spot dike A Site 3 – Road to dam from the NW Site 4 – Rip rap at head of Island Site 5 – Bulkhead storage area under the dam bridge Site 6 – Brush control area between the fence and the rip rap Site 7 – Rip rap along the side of the island Site 8 – Brush control from top of rip rap to top of the slope Site 9 – Planting areas on guidewall Site 10 – Rip rap behind lower wall Site 11 – Gravel behind storage yard Site 12 – Rip rap upstream of control house

Site 13 – Roadway surface, parking areas, turn arounds and all rip rap Site 14 – Rip rap along upstream side of road/dike Site 15 – Rip rap toe on downstream side of road/dike Site 16 – Area 10’ past rip rap on downstream side of road/dike

16 15

Lock and Dam 3 – Herbicide contract map

Total Kill 6.5 acres

Brush Control 1.25 acres

Brush Control approximately 3.75 acres Total Kill approximately 4 acres

0 1,500 3,000750 Feet¹

Lock and Dam 3 Entrance Road II - Herbicide Contract Site Map

6/2013

Notes:

Spray road to lock and dam, including spillways when conditions allow - total kill.

Area between road and edge of water as shown - brush control.

Lock and Dam 3 South – Herbicide Contract Map 11 x 17

Site 1 – Gravel entrance road Site 2 – Area from road to forest edge – both sides. Spray limits marked with T posts at regular intervals. Tree seedlings adjacent Site 3 – Rip rap along waters edge Site 4 – Road surface to forest edge Site 5 – Road to Lock structure Site 6 – Buffer area alongside the road. Spray limits marked with T posts at regular intervals. Tree seedlings adjacent Site 7 – Rip rap around control structure

Total Kill 2.3 acres Brush Control 9.4 acres

Bay City, WI Repeater Site

Tower

Bay City Repeater Site

Total Kill within fence

Total Kill 0.32 acres 0 170 340 510 Ft.

Alma Marina Placement Site - Herbicide Application Contract Site

Note:

Total kill in mulch surrounding ornamental plantings

Lock and Dam 4 - Herbicide Application Contract Map

Legend Treatment

Brush Control 7.6 acres Total Kill 6.5 acres

0 480 960 Feet

Notes:

Site 1 - Area 10' from rip rap on upstream side of dike Site 2 - Upstream side of dike - rip rap Site 3 - Gravel road Site 4 - Area 10' from rip rap on upstream side of dike Site 5 - Upstream side of dike, rip rap Site 6 - Storage yard area Site 7 - Rip rap on downstream side of dike Site 8 - Downstream side of dike Site 9 - Rip rap toe on downstream side of dike Site 10 - Area 10' from rip rap toe on downstream side of dike Site 11 - Area between railroad tracks and lawn, from top of guidewall to bottom of guidewall

Upstream Downstream 06/2013Total Kill

1 2 3 4 5

Alma Repeater General Location - Herbicide Application Contract Site Map

Spray site¹ 0 1,600 3,200 4,800 Ft.

From Wisconsin highway 35 turn on to Wisconsin highway E.

From highway E turn right on Dunand Road, then take the right fork.

Stay right again and turn towards the house.

Access road is next to the house and has a locked gate at the entrance

06/2013

Alma Lock and dam 4

Alma Repeater Site - Herbicide Application Contract Site Map

Total Kill 0.35 acres¹ 0 300 600150 Feet

Treatment area:

Within chain link fence, apron around fence, driveway, cable anchor points, and around the base of the second tower.

Brush control only at anchor points

07/2012

0 2,1001,050 Feet

Lock and Dam 5 Dike - Herbicide Application Contract Site Map

Inset

Upstream Downstream 6/2013Total Kill Road

Upstream

Upstream

Downstream

Downstream

Spray treatments as described on inset drawing, from locked gate to dam structure.

Notes:

Legend Brush Control Total Kill

herbicide contract mapset
vicinity map
SAF_2013_JB
LSAF_2013_JB
Lock_and_Dam1_2013_JB
Pool 2_JB
Lock and Dam 3 Entrance Road_JB
Lock and Dam 3 RM
Lock and Dam 3 Entrance Road ii_JB
L&D3south
Bay City repeater
Alma Marina Placement_JB
Lock and Dam 4_JB
Alma Repeater general Location_JB
Alma Repeater Site
Contrt_5Dike_JB
Lock and Dam 5_JB
Fountain City Service Base_JB
Lock and Dam 5A dike_JB
Lock and Dam 5A_JB
Lock and dam 6_RPM
Dresbach repeater
Lock and Dam 7 Main_JB
Lock and Dam 7 Main embankment_RPM
Lock and Dam 8_JB
Lock and Dam 8 Dike_JB
Lynxville repeater
lock_and_dam9_JB
lock and dam 9 dike_JB
Loack and Dam 10_JB
Eau Galle

File details come from the government source that posted it.