Amendment_1_Tanter_Gate_Gear_Box_Oil_Replacement.pdf
PDF 176 KB Posted
- Attached to
- Dam Gear Box oil replacement Federal contract opportunity
- Solicitation number
- W912ES19T0025
About this file
Updated scope of work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06_SOW_7_June_2019.pdf | ||
| Questions_and_Answers.pdf | ||
| A22_Solicitation_Amendment_2.pdf | ||
| A22_Solicitation_Amendment_2.pdf | ||
| Questions_and_Answers.pdf | ||
| A06_SOW_7_June_2019.pdf | ||
| A22_Solicitation_Amendment_1.pdf | ||
| A22_Tainter_Gate_Gear_Box_Oil.pdf | ||
| Appendix-C_Schaefer-Oil-SDS.PDF | ||
| Appendix-F_LD5_HALF_14FEB2019.pdf | ||
| Appendix-H_Hydrographs_GateOilContract_20190409.pdf | ||
| Appendix-D_LD2_HALF_14FEB2019.pdf | ||
| Appendix-B_287H_FlushingAgent-TDS.PDF | ||
| Appendix-G_LD2-4-5_GearBoxes_Overview.pdf | ||
| Appendix-E_LD4_HALF_14FEB2019.pdf | ||
| Appendix-A_287H_Flushing_Agent-SDS.PDF |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1
Tainter Gate Gear Box Oil Replacement at LD2, LD4, and LD5
Replace Paragraph 6. Coordination sub-paragraph (a) as follows:
a. Accessibility at each site.
i. LD2 Access to the dam is limited and marine plant is required for this work. Dam shall be accessed from the upstream side. Marine plant and marine crane shall be Contractor provided for lifting oil drums on and off the dam. The Government will close gates as necessary to allow Contractor access next to dam on the upstream side. Contractor Personnel shall enter the site from the west side of the river and near the control building, due to the railroad running along the east side of the dam.
Permanently installed cranes are not available at LD2. Contractor shall provide a method of staging and transporting new and used/waste oil and flushing fluid on and off the dam utilizing marine plant.
ii. LD4 Access to the dam can be accomplished from both the east and west sides of the dam or by marine plant and marine crane. The East side is only accessible for personnel access and requires walking across the miter gates and auxiliary lock. The gravel service road on the west side of the dam is able to support large utility vehicle traffic, however use of large trailers may be limited due to limited maneuverability area. Permanently installed cranes are not available at LD4 and Contractor shall provide means for lifting oil drums on and off the dam. Contractor shall provide staging location and a method of transporting new and used/waste oil and flushing fluid on and off the dam.
iii. LD5 Access to the dam can be accomplished from both the east and west sides of the dam or by marine plant and marine crane. The West side is only accessible for personnel access and requires walking across the miter gates and auxiliary lock. The gravel service road on the east side of the dam is able to support large utility vehicle traffic, however use of large trailers may be limited due to limited maneuverability area. Permanently installed cranes are not available at LD5 and Contractor shall provide means for lifting oil drums on and off the dam Contractor shall provide a staging area and method of transporting new and used/waste oil and flushing fluid on and off the dam.
File details come from the government source that posted it.