Amendment_1_Tanter_Gate_Gear_Box_Oil_Replacement.pdf

PDF 176 KB Posted

Attached to
Dam Gear Box oil replacement Federal contract opportunity
Solicitation number
W912ES19T0025
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

Updated scope of work

View the file

Other files for this federal contract opportunity

Other files attached to Dam Gear Box oil replacement, newest first.
File Type Posted
A06_SOW_7_June_2019.pdf PDF
Questions_and_Answers.pdf PDF
A22_Solicitation_Amendment_2.pdf PDF
A22_Solicitation_Amendment_2.pdf PDF
Questions_and_Answers.pdf PDF
A06_SOW_7_June_2019.pdf PDF
A22_Solicitation_Amendment_1.pdf PDF
A22_Tainter_Gate_Gear_Box_Oil.pdf PDF
Appendix-C_Schaefer-Oil-SDS.PDF PDF
Appendix-F_LD5_HALF_14FEB2019.pdf PDF
Appendix-H_Hydrographs_GateOilContract_20190409.pdf PDF
Appendix-D_LD2_HALF_14FEB2019.pdf PDF
Appendix-B_287H_FlushingAgent-TDS.PDF PDF
Appendix-G_LD2-4-5_GearBoxes_Overview.pdf PDF
Appendix-E_LD4_HALF_14FEB2019.pdf PDF
Appendix-A_287H_Flushing_Agent-SDS.PDF PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1

Tainter Gate Gear Box Oil Replacement at LD2, LD4, and LD5

Replace Paragraph 6. Coordination sub-paragraph (a) as follows:

a. Accessibility at each site.

i. LD2 Access to the dam is limited and marine plant is required for this work. Dam shall be accessed from the upstream side. Marine plant and marine crane shall be Contractor provided for lifting oil drums on and off the dam. The Government will close gates as necessary to allow Contractor access next to dam on the upstream side. Contractor Personnel shall enter the site from the west side of the river and near the control building, due to the railroad running along the east side of the dam.

Permanently installed cranes are not available at LD2. Contractor shall provide a method of staging and transporting new and used/waste oil and flushing fluid on and off the dam utilizing marine plant.

ii. LD4 Access to the dam can be accomplished from both the east and west sides of the dam or by marine plant and marine crane. The East side is only accessible for personnel access and requires walking across the miter gates and auxiliary lock. The gravel service road on the west side of the dam is able to support large utility vehicle traffic, however use of large trailers may be limited due to limited maneuverability area. Permanently installed cranes are not available at LD4 and Contractor shall provide means for lifting oil drums on and off the dam. Contractor shall provide staging location and a method of transporting new and used/waste oil and flushing fluid on and off the dam.

iii. LD5 Access to the dam can be accomplished from both the east and west sides of the dam or by marine plant and marine crane. The West side is only accessible for personnel access and requires walking across the miter gates and auxiliary lock. The gravel service road on the east side of the dam is able to support large utility vehicle traffic, however use of large trailers may be limited due to limited maneuverability area. Permanently installed cranes are not available at LD5 and Contractor shall provide means for lifting oil drums on and off the dam Contractor shall provide a staging area and method of transporting new and used/waste oil and flushing fluid on and off the dam.