W912ES18T0074_Attachments.pdf
PDF 16 MB Posted
- Attached to
- LD7 Rock IDIQ Federal contract opportunity
- Solicitation number
- W912ES18T0074
About this file
Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912ES18T0074_Amendment_001_LD7_Rock_IDIQ.pdf | ||
| W912ES18T0074_Attachments_Corrected.pdf | ||
| W912ES18T0074_LD7_Rock_IDIQ.pdf | ||
| W912ES18T0074_LD7_Rock_IDIQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCK 7 ROCK SUPPLY CONTRACT
W912ES‐18‐T‐0074
TABLE OF CONTENTS
PARAGRAPH DESCRIPTION
PART 1 GENERAL
1.1 SCOPE
1.2 APPLICABLE PUBLICATIONS
1.3 SUBMITTALS
1.4 MEASUREMENT AND PAYMENT
1.5 LIST OF ATTACHMENTS
PART 2 PRODUCTS
2.1 MATERIALS
2.2 SOURCES AND EVALUATION
2.3 TESTS FOR ACCEPTABILITY
2.4 RIPRAP GRADATION TESTING
PART 3 EXECUTION
3.1 SCHEDULE
3.2 COORDINATION
3.3 DELIVERY LOCATION
3.4 DELIVERY AND BARGE LOADING
3.5 QUALITY CONTROL
3.6 SAFETY
1. GENERAL.
1.1 SCOPE. The Contractor shall provide all plant labor and material necessary to furnish and deliver riprap to Lock and Dam 7 located on the right bank (when looking downstream) of the Upper
Mississippi River approximately 3 miles upstream of La Crescent, Minnesota.
1.2 APPLICABLE PUBLICATIONS. The publications listed below form a part of this scope of work to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. Army Corps of Engineers, Engineer Manual (EM).
EM 385‐1‐1 Safety and Health Requirements Manual, (30 November 2014).
1.3 SUBMITTALS
1.3.1 General. The Contractor shall submit the following as required. Approval of submittals will not relieve the Contractor of responsibility to furnish materials as required. In order to make the submittal process as efficient as possible, the Contracting Officer may give verbal responses to a submittal followed by the written response at a later date. In this case, the submittal response date will be the date that the verbal response was given.
a. Material Source as specified in PARAGRAPH: 2.2 Sources and Evaluation
b. Method of Processing Riprap as specified in PARAGRAPH: 2.1.5 Riprap Gradation
Processing
c. Gradation Test Results as specified in PARAGRAPH: 2.4 Riprap Gradation Testing
d. Weighing Operations as specified in PARAGRAPH: 1.4 Measurement
e. Delivery Tickets as specified in PARAGRAPH: 1.4.1.1 Weighing Operations
f. Scale Accuracy Certification as specified in PARAGRAPH: 1.4.1 Measurement
g. Daily Delivery Report as specified in PARAGRAPH: 1.4 Measurement
1.3.2 Submission of Submittals. Submittals shall be submitted in ample time to secure approval prior to the time the items covered are to be delivered to the site. ENG Form 4025
(Attachment 5) shall be used for the transmittal of submittals. One electronic copy of all submittals shall be provided. Hard copies of submittals are generally not required unless specifically noted. The Government will require at least ten working days to review a submittal.
1.3.3 Submittal Control. Within 7 calendar days after contract award date, the Contractor shall submit to the Contracting Officer for review and approval, a submittal control document
(ENG Form 4288‐R) in electronic format listing and scheduling all items required to be furnished for review by the Government. A blank submittal register is included in
Attachment 3. Primary responsibility for submittals shall rest with the Contractor. The
Contractor shall furnish submittals for all deviations from the specifications.
1.4 MEASUREMENT AND PAYMENT.
1.4.1 Measurement. Riprap shall be weighed on an accurate, approved scale furnished or made available by the Contractor. Before being approved for use, the scale shall have been tested by the applicable State’s Department of Weights and Measures or by a reliable scale servicing company so as to operate within a degree of error not greater than 1 percent and to be sensitive to a change in load of 1/5 of 1 percent, both percentages being based on the total required weight of material normally weighed as a unit on the scale. The Contractor shall submit the certification document from the appropriate state’s Department of Weights and Measures or scale servicing company that the proposed scale complies with the requirements listed above. Scales shall be spot checked for accuracy and sensitivity as often as directed by the Contracting Officer during stone delivery. When materials are weighed in hauling vehicles, gross weights shall be checked and the vehicle tare weight determined as often as the Contracting Officer directs. The Contractor shall furnish such weights, accessories, and assistance as the Contracting Officer may require for conducting weighing equipment tests.
1.4.1.1 Weighing Operations. Weighing operations shall be performed, as approved, in the presence of the Contracting Officer, unless waived. Each load shall be accompanied by duplicate copies of delivery tickets certified by the weighmaster. As a minimum, each ticket shall contain the following information:
a. Date and Time.
b. Vehicle Number.
c. Gross Weight.
d. Vehicle Tare Weight.
e. Net Weight of Riprap.
f. Material weighed (Description of Load Contents).
g. Signature of Weighmaster.
The Government will collect a copy of the delivery ticket from each truck as it arrives on site.
The Contractor shall submit a daily report detailing the number of trucks that made deliveries to the site as well as an overall quantity of material delivered to the site that day.
All daily reports shall be submitted no later than 24 hours after the report period end date and time.
1.4.1.1.1 A plan indicating the location and proposed schedule of weighing operations shall be submitted for approval in accordance with PARAGRAPH: 1.3 Submittals.
1.4.2 Payment. Riprap material shall be measured and paid for by the ton (2,000 pounds avoirdupois) of acceptable material delivered as specified to the designated delivery site.
1.5 LIST OF ATTACHMENTS:
1 – USGS La Crescent MN 7.5 Minute Quadrangle
2 – Approved Material Source(s)
3 – Blank Submittal Register
4a – Gradation Curves
4b – Gradation Worksheet Method A
4c – Gradation Worksheet Method B
5 – 4025
6 – Sample Submittal Register
2. PRODUCTS.
2.1 MATERIALS.
2.1.1 General. Riprap material shall be durable quarried stone of suitable quality to ensure permanence in the Upper Mississippi River environment. Stone shall be free from cracks, seams and other defects that would unduly increase its deterioration from natural causes. A crack is considered to be detrimental if it is more than four (4) mils wide and is continuous for one‐third the dimension of at least two sides of the stone.
2.1.2 Specific Gravity. All Stone shall have a specific gravity of not less than 2.55 and not more than 2.75.
2.1.3 Riprap Shape. Neither the breadth nor thickness of any individual stone shall be less than one‐third its length.
2.1.4 Riprap Gradation. Riprap shall be reasonably well graded within the specified limits shown on the riprap gradation curve contained in Attachment 4 to permit construction of relatively dense riprap sections. Inclusion of objectionable quantities of dirt, sand, clay, rock fines, or other deleterious materials will not be allowed or measured for payment.
2.1.5 Riprap Gradation Processing. On the same date the Contractor provides the submittal for material sources, the Contractor shall also submit for approval the method of processing riprap at the quarry that will preclude the inclusion of objectionable amounts of fine material and organic matter. All riprap shall be processed in accordance with the approved method. Quarry‐run riprap material will not be accepted. All rock designated for use as riprap shall be processed over a vibratory grizzly or by an approved method to insure the exclusion of poor quality rock.
2.2 SOURCES AND EVALUATION.
2.2.1 Approved material sources are provided in Attachment 2. The Contractor may elect to furnish rock from another source(s) not listed in Attachment 2, provided the source is approved by the Contracting Officer and meets the conditions hereinafter stated. If the
Contractor proposes to furnish materials from a source not listed, the Government
Geologist will make such investigations and evaluations as necessary to determine whether or not materials meeting the requirements of this contract can be produced from the proposed source. The Contractor shall be responsible for making its own investigations for sources of suitable materials and for making its own arrangements with the owners of the quarries or land for procuring the required quantities of suitable materials.
2.2.1.1 Within 7 calendar days after award of the contract, the Contractor shall designate and submit for approval only one source or combination of sources from which it proposes to furnish the materials specified. If the Contractor proposes to furnish materials from a source or from sources not listed in Attachment 2, it may designate only a single source or a single combination of sources from which to furnish the material specified. Samples for acceptability testing shall be provided as required by the PARAGRAPH: 2.3 Tests for
Acceptability. If a source for materials so designated by the Contractor is not approved for use by the Contacting Officer, the Contractor shall not submit for approval other sources but shall furnish the materials from approved sources selected from the list in Attachment 2, at no additional cost to the Government.
2.2.1.2 Approval of a source of material is not to be construed as approval of all material from that source. The right is reserved by the Government to reject materials from certain localized areas, zones, strata, or channels when such material are unsuitable as determined by the
Government Geologist. Materials produced from an approved source shall meet all of the requirements of this specification.
2.2.2 No riprap material shall be used from any river facing bluffs that are visible from the
Mississippi River.
2.3 TESTS FOR ACCEPTABILITY OF ALTERNATIVE SOURCE MATERIAL.
2.3.1 Quality tests and service records will be used to determine the acceptability of stone materials. In the event suitable test reports and satisfactory service records are not available, as in the case of newly operated sources, the materials will be tested to determine acceptability. Tests to which the materials may be subjected to include petrographic analysis, specific gravity, soundness, abrasion, absorption, freezing and thawing, and other tests considered necessary to demonstrate acceptability. Tests will be made by, or under the supervision of, the Government and at the Government’s expense.
2.3.2 Samples. When directed by the Contracting Officer, suitable samples of materials shall be submitted for approval prior to delivery of materials to the work site. Samples shall be obtained by the Contractor, in the presence of the Contracting Officer or its designated representative, and delivered at the Contractor’s expense to a point designated by the
Contracting Officer, at least 15 days in advance of the date that the material is required to be delivered.
2.4 RIPRAP GRADATION TESTING.
2.4.1 General Requirements. Gradation tests shall be performed by the methods and frequency listed below. Testing listed herein shall be completed by and at the expense of the
Contractor. Gradation testing results shall be submitted utilizing the gradation plots for the required riprap gradation and the WORKSHEET FOR GRADATION ANALYSIS OF RIPRAP
(gradation plots and blank copies of the worksheet are included in the attachments section).
The Contracting Officer shall direct the time and location of sampling, unless waived. The
Contracting Officer shall be informed a minimum of 24 hours before each test is to be performed. The results of all tests, including failing tests shall be submitted on the appropriate gradation plots and worksheets. The Contracting Officer shall be informed immediately of test results and draft copies of test results shall be submitted at the
Contracting Officers request. Tests performed on material that does not meet gradation and shape requirements will not be counted as part of the tests required.
2.4.2 Test Method A. Test method A shall consist of weighing all stones larger than 5 pounds in a sample. Five to seven weight classes shall be selected within the range of stone sizes. Each stone shall be weighed and recorded on the worksheet for method A. The weight of stones shall be summed for each weight class; after which calculations and a plot of the gradation shall be completed in accordance with accepted practice for soil and aggregate gradations.
2.4.3 Test Method B. Test method B shall consist of separating the stones into 5 to 7 piles, ordered by size. The sample shall be separated on a clean, hard surface that is free of smaller stones that could become mixed with the sample. The stones shall be visually screened to place them into appropriate piles. All stones shall be separated and placed into a pile before weighing. After separating, the smallest and the largest rock in each pile shall be weighed and recorded. The stones shall be adjusted as necessary so that the weight classes do not overlap. After adjustment is adequate and weight classes have been established, each pile of stone shall be weighed and recorded on the worksheet for method
B. Calculations and a plot of the gradation shall be completed in accordance with accepted practice for soil and aggregate gradations.
2.4.4 Scales. Accuracy of scales shall be as required in PARAGRAPH: 1.4.1 Measurement.
2.4.5 Testing. A sample shall be obtained from each approved material source or combination of sources for each gradation required and tested in accordance with either method A or B. A satisfactory test shall be obtained from each source or combination of sources for each gradation prior to hauling any riprap from that quarry. Each sample shall have a minimum gross weight of not less than 25 times the maximum stone size in the specified gradation
(25∙W100).
2.4.6 Testing Frequency. Gradation tests will be required at a frequency of 1 per 5,000 tons of each gradation of material from a specific source that is brought on site, with a minimum of one test per gradation. Tests that do not meet gradation requirements will not be counted.
2.4.7 Corrective Action. If materials fail to meet gradation or shape requirements, the Contractor shall adjust its operations and verify with necessary tests that acceptable materials are being produced, or it shall propose another source and verify, with necessary tests, that acceptable material can be produced from that source.
3. EXECUTION.
3.1 SCHEDULE. The Contracting Officer will notify the Contractor 15 calendar days in advance of when delivery is to commence. The Contractor shall provide the riprap gradation submittals for approval no later than 7 calendar days prior to delivery of materials to the specified delivery location. It is anticipated that commencement of delivery will occur between the dates of 4
September and 1 December 2018. Delivery shall commence no later than 15 calendar days following notification from the Contracting Officer and shall continue on consecutive work days
(Monday through Thursday) until completed, unless directed otherwise by the Contracting
Officer. The delivery period shall be between the hours of 7:30 a.m. and 5:00 p.m. (local time), Monday through Thursday with the potential for Friday deliveries, unless directed otherwise by the Contracting Officer. No deliveries shall be made on weekends or on Federal holidays.
3.2 COORDINATION. The Contractor shall not block access to the loading docks or access routes at the on‐land delivery sites for extended periods of time and shall coordinate loading access routes and dock use with the following:
Mr. Christopher Stai
Chief, Maintenance and Repair
651.290.5144 (office)
612.790.2675(mobile)
Christopher.J.Stai@usace.army.mil
Michael Gunderson
Foreman/Site Supervisor
651.290.5145 (office)
612.670.2880 (mobile)
Michael.G.Gunderson@usace.army.mil
3.3 DELIVERY LOCATION. All riprap required under this contract shall be delivered to the downstream loading dock at Lock and Dam 7. Lock and Dam 7 is located on the right bank of the Mississippi River in Winona County, Minnesota approximately three miles upstream of La
Crescent, Minnesota. Lock and Dam 7 is located on the USGS La Crescent 7.5 Minute
Quadrangle. This 7.5 minute quadrangle sheet is included as Attachment 1. The center of the loading dock is further specified as the following Military Grid Reference System (MGRS) Grid
Coordinate:
15T XJ 35905 58167
The Lock 7 downstream loading dock is located approximately one half mile upstream from the
U.S. Interstate I‐90 Mississippi River Bridge.
3.4 DELIVERY AND BARGE LOADING. Delivery of riprap by the Contractor shall include placing material directly from the delivery trucks into a stockpile area on site and/or loading directly from the delivery trucks onto U.S. Government‐owned barges. Each barge on which riprap material is to be loaded will have a capacity of 200 tons, with a 20 foot by 85 foot holding area with 2.5 foot high side barriers, with ramps that can be used to drive the delivery trucks directly onto the barges. The barges and access ramps will be maneuvered by Government Personnel.
Government personnel and equipment will stockpile material. The Contractor shall provide all other equipment and personnel needed to place the riprap directly onto the barges, except that no secondary loading or repositioning of riprap will be required after the riprap has been dumped from the delivery trucks. A representative of the Contracting Officer will direct the
Contractor where to unload riprap.
3.4.1 Loading Riprap. Delivery trucks used by the Contractor for loading riprap onto barges or stockpiles shall be straight tandem dump trucks with maximum 18 ton capacity; use of articulated end‐dump trailers, side dump, or belly dump trailers will not be allowed.
3.4.2 Delivery Rate. The riprap material delivery rate will vary between 100 tons and 800 tons per day, as requested by the Contracting Officer’s Representative. The Contractor shall be required to increase or decrease the delivery rate within the above stated delivery rate range on a daily basis until the required quantity of material is met.
3.5 QUALITY CONTROL. The Contractor shall establish and maintain quality control and shall maintain records of the quality control for work under this section to ensure compliance with contract requirements. A copy of inspections and tests, as well as corrective actions taken, shall be furnished to the Government.
3.6 SAFETY. The Contractor shall comply with all state and Federal OSHA requirements as well as all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health
Requirements Manual, EM 385‐1‐1. If a conflict exists between the guidance provided between the sources listed above, the Contractor shall follow the most stringent standard given.
ATTACHMENTS
Attachment 1 – USGS La Crescent, Minnesota 7.5 Quadrangle Sheet
Attachment 2 – Material Sources
Attachment 3 – Blank Submittal Register (ENG Form 4288‐R)
Attachment 4 – Gradation Forms:
R270 Riprap Gradation Curve
Riprap Gradation Analysis Worksheet, Method A
Riprap Gradation Analysis Worksheet, Method B
Attachment 5 – ENG Form 4025, Submittal Transmittal Form
Attachment 6 – Sample Submittal Register
Attachment 1 – USGS La Crescent 7.5 Minute Quadrangle Sheet
Imagery................................................NAIP, January 2010 Roads..............................................©2006-2010 Tele Atlas Names...............................................................GNIS, 2010 Hydrography.................National Hydrography Dataset, 2010 Contours............................National Elevation Dataset, 2010
▄▄OP
▄▄OP
▄▄OP
█n
█n
█n
█n
█n
█n
█n
█n
█n
█n
█n
█n
█n
█n
█n
█n█n
█n
█n
F
F
F
F
F
F
H
0 1000
11001100
T104N R4W
T15N R7W
T105N R5W
T103N R4W
T105N R4W T16N R8W
T16N R7W
6 4
La Crosse Municipal Airport
§̈¦90
§̈¦90
£¤14
£¤53
£¤14
£¤53
£¤14
¬«16
¬«16 ¬«33
¬«16 ¬«26
¬«16
¬«33
¬«16
¬«44
¬«16
¬«26
FOX CHASE DR
SELKE RD
BRI
AR
WO
OD
LN
LA
NC
ER
BL
VD
N 3RD ST
S C
HE
ST
NU
T
ST
MA
RC
O
DR
FR
ON
T S T S
BUCHNER PL
9T H
ST
S
6T H
ST
N
FISHE RMANS RD
T- 285
LANES VALLEY RD
T-258
LA
NE
S VA
LL
EY
RD
BURNS VALLEY RD
BUEHLER RIDGE RD
MOUNT TOM BLVD
CO HWY 1
S 2ND ST
SP
RU
CE
D
R S O
AK
ST
HINKLEY RD
CALLAWAY CT
JAY ST
GOULD ST
CO RD 21
CO RD 6
BECKMAN RD
S H
ILL
ST
N
HI
LL
ST
REGENT DR
WELKE DR
YO
UN
GD
AL
E A
VE
CLINTON ST
6T H
ST
S
CA
LE
DO
NI
A S T
LOST VALLEY DR
BIRCH ST
PO
TT
ER
RD
E TO
WN HA
LL
RD
T-314
CO RD 6
SEILER RD
SK
UN
K H
OL
LO
W
RD
N 2ND ST
N 1ST ST
MOUNT TOM BLVD
CALLAWAY BLVD
CHURCH DR
STATE ST
CAUSEWAY BLVD
WALL ST
WINDSOR ST
N PINE CREEK RD
WALCKER RD
LORENZ RD
BURNS VALLEY RD
BLU
FF
DR
WI
LL
OW
ST
S 1ST ST
HARALSON LN
RE
D A
PP
LE
DR
SKY HARBOUR DR
LACRESENT C T
CA
RO
LIN
E S
T
CO
PE
LA
ND
PA
RK
D R
8T H
ST
S
SAINT JAMES ST
N PINE CREEK RD
LEMKE RD
CO RD 18
VALLEY LN
S 11TH ST
N 4TH ST
CE
DA
R
DR
CO
RD
N C H
ES
TN
UT
ST
SPILLWAY DR
OLIVET ST
RIVERV IE W
DR
JO
SE
PH
H
OU
SK
A D R
VINE ST
2N D S
T N
7T H
ST
S SIM
S P L
HAGAR ST
TOWN
H ALL RD
ST
ON
EY
PO
INT
RD
AM
BR
OS
IA
ST AERIE HEIGHTS LN
BA
IN
BR
IDG
E S T
AIR
PO
RT
D
R
NAKOMIS AVE
DIVISION ST
LE
MK
E R D
T-314
BUTTERFIELD VALLEY RD
ASH ST
T-
T-282
W
TOWN HALL RD
CR
ES
CE
NT
HIL
LS DR
JU
NI
PE
R
ST
JO
NA
TH
AN
LN
S 14TH ST
S 4TH ST
S 3RD ST
SY
CA
MO
RE
ST
MC
IN
TO
SH
RD
E
SHORE ACRES RD
BAUM GA RT NER
DR
LA
KE
SH
OR
E D R
DA
WS
ON
AV
E
HOOD ST
SAINT CLOUD ST
3R D
ST
S
7T H
ST
N
S AVE
4T H
ST
S
S AVE
COPELAND AVE
RO
SE
ST
UPPER MISSISSIPPI RIVER NATIONAL
WILDLIFE AND FISH REFUGE
UPPER MISSISSIPPI RIVER NATIONAL
WILDLIFE AND FISH REFUGE
UPPER MISSISSIPPI RIVER NATIONAL
WILDLIFE AND FISH REFUGE
LA CROSSE CO
H
OU
ST
ON
C O
WINONA CO
LA CROSSE CO
WINONA CO
LA
C
RO
SS
E
CO
HOUSTON CO
HOUSTON CO
MINNESOTA
M
INNESOTA
W
ISCONSIN
WISCONSIN
M
IN
NE
SO
TA
MINNESOTA
WISCONSIN
Pool
La Plume Slough
Smith Slough
Broken Arrow Slough
French Slough
Dark Slough
East Channel
Richmond Bay
Pine Cr
Pin e Cr
Butterfield Cr
Thompson Cr
Pine Cr
Mississippi River
Root River
Mi ssi ssi pp i R ive r
Root River
Root River
Mi ssi ssi pp i R ive r
W est Channel
Mississippi River
Mi ssi ssi pp i R ive r
Lake Onalaska
Blue Lake
Target Lake
Crucifixion Cem
Prospect Hill Cem
Convent Cem
West Family
Cem
Saint Joseph's Catholic Cem
Pine Creek Catholic Cem
French Island Cem
Toledo Cem
Mount Calvary Cem
Hoffman Family Cem
Mount Hope Cem
LA CROSSE
LA CROSSE
French Island
French Island
West La Crosse
North La Crosse
Hokah
River Junction
La Crescent
North La Crosse
Lane Valley
L a n e
V a l l e y
B u r n s V a l l e y
P f e f f e r V a l l e y
L a n e V a l l e y
Minnesota Island
Taylor Island
French Island
Barron Island
Isle La Plume
Dresbach Bridge
Pettibone Beach
Black River
Public Beach
52'
N
34 6
17'
47'
52'FEET (MN S)43°
47'
50'
30"
22'
E 000
35 6
15'
43°45'
22'
6 000m
91°
50'
N
FEET (MN S)
000m
91°
30"
20'
30"
FEET (WI S)
FEET (MN S) FEET (WI S)
91°
33 36 17'30"
40 E
15'
30"
FEET (MN S)
45'
34 37 000
000m
43°
30"
30"
000m
6 36
30"
FEET (WI S)
FEET (WI S)
20'
6 35 37
3 39
91°
43°
MINNESOTA
QUADRANGLE LOCATION
LA CRESCENT QUADRANGLE
MINNESOTA-WISCONSIN
7.5-MINUTE SERIES
LA CRESCENT, MN-WI
Expressway Local Connector
ROAD CLASSIFICATION
Ramp 4WD Secondary Hwy Local Road
Interstate Route State RouteUS RouteWX ./ H
LA CRESCENT, MN-WI
ROAD CLASSIFICATION
Check with local Forest Service unit for current travel conditions and restrictions.
FS Primary Route FS High Clearance Route
FS Passenger Routeª« - ▬
Interstate Route State RouteUS RouteWX ./ H
Expressway Local Connector
Ramp 4WD Secondary Hwy Local Road
U.S. DEPARTMENT OF THE INTERIOR
U.S. GEOLOGICAL SURVEY
1 Pickwick
8 Stoddard
2 Holmen 3 Onalaska 4 Mound Prairie 5 La Crosse 6 Caledonia 7 Brownsville
ADJOINING QUADRANGLES
1 2 3
4 5
6 7 8
This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011.
A metadata file associated with this product is draft version 0.6.19
CONTOUR INTERVAL 20 FEET
NORTH AMERICAN VERTICAL DATUM OF 1988
SCALE 1:24 000
1000 500 0 METERS 1000 2000
21KILOMETERS00.51
1 0.5 0
MILES
1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
FEET
Imagery..................................................NAIP, July 2013 Roads................................ U.S. Census Bureau, 2015 - 2016 Names..........................................................GNIS, 2016 Hydrography....................National Hydrography Dataset, 2013 Contours............................National Elevation Dataset, 1999 Boundaries............Multiple sources; see metadata file 1972 - 2016 Public Land Survey System..................................BLM, 2014 Wetlands.........FWS National Wetlands Inventory 1977 - 2014
North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and 1 000-meter grid: Universal Transverse Mercator, Zone 15T
Produced by the United States Geological Survey
10 000-foot ticks: Minnesota Coordinate System of 1983 (south zone), Wisconsin Coordinate System of 1983 (south zone) This map is not a legal document. Boundaries may be generalized for this map scale. Private lands within government reservations may not be shown. Obtain permission before entering private lands.
North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and 1 000-meter grid: Universal Transverse Mercator, Zone 15T
Produced by the United States Geological Survey
10 000-foot ticks: Minnesota Coordinate System of 1983 (south zone), Wisconsin Coordinate System of 1983 (south zone)
This map is not a legal document. Boundaries may be generalized for this map scale. Private lands within government reservations may not be shown. Obtain permission before entering private lands.
Imagery<IMG_LEADER><IMG_CITATION> Roads<TRANS_LEADER> U.S. Census Bureau, 2015 - 2016 Roads within US Forest Service Lands.............FSTopo Data with limited Forest Service updates, 2012 - 2016 Names...............................................................GNIS, 2016 Hydrography<HYDRO_LEADER>National Hydrography Dataset, <HYDRO_DATE> Contours<HYPSO_LEADER><HYPSO_CITATION> Boundaries............Multiple sources; see metadata file 1972 - 2016
<OPTIONAL_CITATIONS>
Wetlands.........FWS National Wetlands Inventory 1977 - 2014
U.S. National Grid 100,000-m Square ID
Grid Zone Designation
XJ
15T
Ø
MN
GN
UTM GRID AND 2016 MAGNETIC NORTH
DECLINATION AT CENTER OF SHEET
1° 10´
21 MILS
1° 7´
20 MILS
N
SN
N G
A R
EF
N
O
U S
G S
X
K
Attachment 2 – Approved Material Sources
Approved Material Sources for Lock 7 Rock Supply
1. The following should be capable of producing acceptable quality riprap for the subject project:
Quarry/Operator Quarry Location
Zogg Quarry SE 1/4, Sec 27, T 14 N, R 7 W The Kraemer Co. Vernon County, WI Plain, WI
(608) 546-2255
Medary Quarry Sec 22, T 16 N, R 7 W Milestone Materials La Crosse County, WI Onalaska, WI
(608) 783-6411
Abnet Quarry Sec. 2, T 104 N, R 5 W LaCrescent Rock Products Houston County, MN La Crescent, MN
(507) 895-4202
Chicken Ridge Quarry SE ¼, Section 22, T 104 N, R 5 W Botcher Construction Co. Houston County, MN Houston, MN
(507) 896-3723
Attachment 3 – Blank Submittal Register (ENG Form 4288‐R)
DESCRIPTION OF
ITEM SUBMITTED
e.
A C T I V I T Y
N O a.
TRANS-
MITTAL
NO.
b.
I T E M
N O c.
SPECIFICATION
PARAGRAPH
NUMBER
d.
TYPE OF SUBMITTAL CLASSI-
FICATION
D A T A f.
D R A W I N G S g.
I N S T R U C T I O N S h.
S C H E D U L E S i.
S T A T E M E N T S j.
R E P O R T S k.
C E R T I F I C A T E S l.
S A M P L E S m.
R E C O R D S n.
O M
M A N U A L S o.
SUBMITTAL REGISTER
(ER 415 1-10)
TITLE AND LOCATION CONTRACTOR
CONTRACT NO.
SPECIFICATION SECTION
I N F O R M A T I O N p.
O N L Y
G O V E R N M E N T q.
A P P R O V E D
R E V I E W E R r.
CONTRACTOR
SCHEDULE DATES
SUBMIT
s.
APPROVAL
NEEDED
BY
t.
MATERIAL
NEEDED
BY
u.
C O D E v.
CONTRACTOR
ACTION
DATE
w.
SUBMIT
TO
GOVERN
MENT
x.
C O D E y.
GOVERNMENT
ACTION
DATE
z.
REMARKS
aa.
ENG FORM 4288-R, JAN 97 EDITION OF MAR 95 IS OBSOLETE. PAGE PAGES (Proponent: O
Attachment 4 – Gradation Forms:
R270 Riprap Gradation Curve
Riprap Gradation Analysis Worksheet, Method A
Riprap Gradation Analysis Worksheet, Method B
ENG FORM 4055 (COMPUTER GENERATED)
110100100010000
PE
R
C
EN
T C
O
AR
SE
R
B Y
W
EI
G H
T
PE
R
C
EN
T
FI
N
ER
B Y
W
EI
G H
T
8 4
6 2
2 3
6 2 6 2
6 1 3 9 8
2.65
WEIGHT OF STONES IN POUNDS
(ASSUMING STONE SHAPE MIDWAY BETWEEN A SPHERE AND CUBE)
SPECIFIED GRADATION ASSUMES A SPECIFIC
GRAVITY OF STONE EQUAL TO 2.65
3457 6
PROJECT ___________________________________
AREA ______________________________________
DATE
RIPRAP/ROCKFILL GRADATION CURVE
SIZE OF STONE IN INCHES
SPECIFIC GRAVITY OF STONE = 2.65
MVP Standard Riprap Gradtion
R270
May 2018
WORK SHEET FOR GRADATION ANALYSIS OF RIPRAP
METHOD A
Project Name: Date:
Riprap Type: Test No.
Source, Quarry, or Pit:
Sample Location: Test Made By:
Part 1. Weigh all stones larger than 5 pounds and record.
(1) PASSING WT. 5 lbs.
(2) RETAINED WT. 5 lbs. PAN
(3) ------- -------
(4) TOTALS
Rows (1) & (2) Enter 5 to 7 weight classes to yield approx. 75%, 50%, 30%, and 15% finer points.
Row (3) List weight of each stone. Attach additional sheets if necessary.
Row (4) Add all individual stone weights listed in each column.
Part 2. Summary Table.
(5) WEIGHT CLASSES (6) (7) (8)
PASSING RETAINED TOTAL WEIGHT CUMMULATIVE TOTAL PERCENT
(stone wt. (stone wt. EACH CLASS WEIGHT PASSING PASSING in lbs.) in lbs.) (lbs.) (lbs.) (%)
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.